1363 41 Street
Brooklyn, NY 11218BBL 3-05297-0051Map
Owner of record: Frankel, Elliot
1363 41 Street is a walk-up apartment building built in 1931 in Brooklyn, 11218. It has 4 residential units across 2 floors. The owner of record is Frankel, Elliot. HPD has recorded 40 housing violations here, most recently on July 16, 2025. 7 of the 40 most recent violations are still open.
- HPD violations
- 40
- DOB violations
- 0
- ECB violations
- 6
- HPD complaints
- 29
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 40
- BHazardous
Properly repair with similar material the broken or defective vinyl shingles at building front facade , 2nd story
Jul 16, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north
Jun 8, 2025 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1r, 1st story, 1st apartment from west at north
Jun 8, 2025 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Jun 8, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycle at public hall, 1st story
Jan 25, 2025
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jun 5, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 5, 2022
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jun 5, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Jun 5, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 5, 2022
Closed — Violation dismissed
Show 30 more ↓
- ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 5, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance , 1st story
Jun 5, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective from vestibule to public hall , 1st story
Jun 5, 2022
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing garbage can lid at front yard
May 27, 2021
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 6, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 6, 2015
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12. at public hall stairs, 2nd story
Aug 28, 2012
Closed — Violation closed - BHazardous
Replace with new the missing pane glass at upper sash winwow ( east) in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6; wg to replace = 0; wg to repair = 0; located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the 1st room from north at west located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective broken glass at french door ( one light) in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at north wall, 1st door from south at west wall, 1st door frame from south at west wall, north wall, east wall, west wall, 1st window frame from north at east wall, 1st window sash from north at east wall in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, ceiling, 1st closet from west at north wall door frame, 1st door from south at west wall, 1st door frame from south at west wall, north wall, south wall, east wall, west wall, 1st window frame from east at south wall in the 2nd room from north at east located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, ceiling, 1st door frame from east at south wall, north wall, south wall, east wall, west wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north at west located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at north wall, baseboard at east wall, baseboard at west wall, ceiling, 1st closet from east at south wall wall, 2nd closet from east at south wall door, 2nd closet from east at south wall door frame, 1st door from south at west wall, 1st door frame from south at west wall, north wall, east wall, west wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at east wall, baseboard at west wall, 1st door from east at south wall, 1st door frame from east at south wall, east wall, west wall in the foyer located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st base cabinet from south at west wall, baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, ceiling, 1st door frame from west at north wall, north wall, south wall, east wall, west wall, 1st wall cabinet from south at west wall, 1st window frame from east at south wall in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Open — Nov sent out - ANon-hazardous
Replace with new the missing glass at west french door ( total # 2) in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective lower sash balance at east window in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window sash from east at south wall in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from south at west wall in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, 2nd closet from east at south wall wall in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Aug 28, 2012 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
D26-17.10 adm code post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to building's heating system 1 sty public hall & on boiler room door.
Mar 6, 1989
Closed — Violation dismissed - CImmediately hazardous
D26-17.10 adm code provide ready access to building's heating system cellar door locked.
Mar 6, 1989
Open — Not complied with - BHazardous
Repair or replace the smoke detector defective 1 sty south apt 1f parmar r34. located at apt 1f
Jan 26, 1988 · Apt 1F
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items all stys public hall r41.
Jan 26, 1988
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 6
- Class - 1
Failure to maintain building in a code-compliant manner. at time of inspection, observed the building interior/exterior in state of disrepair. noted the cellar stairs walls/ceilings damaged, plastered finished
Jan 9, 2025 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. at time of inspection, observed the cellar has large openings and gaps throughout
Jan 9, 2025 · Penalty $2,500
Resolve - Class - 1
Failure to provide unobstructed exit passageway. at time of inspection, observed the cellar stairway to 1st floor, and cellar egress door to the rear yard obstructed with debris, garbage, and broken door stored
Jan 9, 2025 · Penalty $1,250
Resolve - Class - 1
Work without permit. at time of inspection, observed illegal electrical/hvac work completed installing 3 model #aou24rlxfz split type air conditioner units, outlets/switches for washer/dryer appliances inside u
Jan 9, 2025 · Penalty $1,250
Resolve - Class - 1
Work without permit. at time of inspection, observed illegal plumbing work completed installing gas/water lines for double stacked washers/dryers inside unit 1f,1r, and 2r. no permits or records on bis/dob now
Jan 9, 2025 · Penalty $2,500
Resolve - Class - 1
Work without permit. at time of inspection, observed on the 1st and 2nd floors in units 1f,1r, and 2r illegal alteration work completed. noted interior framing work to sub-divide, negate/alter 1st and 2nd floor
Jan 9, 2025
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Jan 29, 2026 · Apt 2R
Close - Heat/hot water
Apartment only
Jan 29, 2026 · Apt 2R
Close - Unsanitary condition
Pests
Jan 29, 2026 · Apt 2R
Close - Unsanitary condition
Pests
Jan 29, 2026 · Apt 2R
Close - Appliance
Electric/gas range
Jul 18, 2025 · Apt 1F
Close - Electric
Power outage
Jul 10, 2025 · Apt 1F
Close - Appliance
Electric/gas range
Jul 10, 2025 · Apt 1F
Close - General
Cooking gas
Jun 5, 2025 · Apt 1R
Close - Heat/hot water
Entire building
Jan 22, 2025 · Apt 1R
Close - Plumbing
Bathtub/shower
Jan 22, 2025 · Apt 1R
Close
Show 19 more ↓
- Unsanitary condition
Garbage/recycling storage
Apr 30, 2022 · Apt BLDG
Close - Door/window
Door
May 25, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 25, 2021 · Apt BLDG
Close - Safety
Fire escape
May 25, 2021 · Apt BLDG
Close - Unsanitary condition
Pests
Mar 5, 2021 · Apt 2R
Close - Heat/hot water
Apartment only
Jan 21, 2019 · Apt 2R
Close - Water leak
Heavy flow
Sep 6, 2017 · Apt 2F
Close - Door/window
Door
Sep 6, 2017 · Apt 2F
Close - Heat/hot water
Apartment only
Sep 6, 2017 · Apt 2F
Close - Unsanitary condition
Pests
Sep 6, 2017 · Apt 2F
Close - Heat/hot water
Apartment only
Feb 10, 2015 · Apt 1F
Close - Paint/plaster
Wall
Jul 10, 2013 · Apt 1F
Close - General
Windows
Jul 10, 2013 · Apt 1F
Close - Paint/plaster
Wall
Aug 21, 2012 · Apt 2R
Close - General
Doors
Aug 21, 2012 · Apt 2R
Close - Plumbing
Basin/sink
Aug 21, 2012 · Apt 2R
Close - General
Ventilation system
Aug 21, 2012 · Apt 2R
Close - General
Cooking gas
Apr 14, 2011 · Apt BLDG
Close - Heating
Heat related
Apr 14, 2011 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1931
- Floors
- 2
- Residential units
- 4
- Building area
- 2,800 ft²
- Lot area
- 2,003 ft²
- Zoning
- R6
- Community board
- 312
- Council district
- 39
- Block / lot
- 5297 / 51
- Assessed value
- $356,400
- Landmark / historic district
- No
HPD registration #328038, last renewed Aug 15, 2025.
Questions about 1363 41 Street
Who owns 1363 41 Street?
The owner of record in NYC Department of City Planning PLUTO data is Frankel, Elliot.
Does 1363 41 Street have violations?
Yes. NYC HPD has recorded 40 housing violations at this property.
Is 1363 41 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1363 41 Street built?
City records list 1931 as the year it was built.
How many apartments are in 1363 41 Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.