roofy

Nostrand Ave

Brooklyn, NY 11226BBL 3-05131-0001Map

Owner of record: Hello Nostrand Holdings LLC

Nostrand Ave is an elevator apartment building built in 2015 in Brooklyn, 11226. It has 93 residential units across 6 floors. The owner of record is Hello Nostrand Holdings LLC. HPD has recorded 84 housing violations here, most recently on July 25, 2026.

HPD violations
84
DOB violations
15
ECB violations
6
HPD complaints
155

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Jul 25, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 84

  • B

    Abate the nuisance consisting of pests. evidence of carpet beetles in the entire apartment located at apt 608, 6th story, 3rd apartment from south at west

    Jul 25, 2026 · Apt 608

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in closet at wast wall in the 1st room from east at north located at apt 608, 6th story, 3rd apartment from south at west

    Jul 20, 2026 · Apt 608

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 608, 6th story, 3rd apartment from south at west

    Jul 20, 2026 · Apt 608

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective missing wall cabinet doors at north wall in the kitchen located at apt 608, 6th story, 3rd apartment from south at west

    Jul 20, 2026 · Apt 608

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroom located at apt 608, 6th story, 3rd apartment from south at west

    Jul 20, 2026 · Apt 608

    Closed — Violation closed
  • B

    Seal in open position the o.s.y. valve of the sprinkler system in accordance with the rules and regulations of this department chain with pad lock at cellar

    May 19, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 608, 6th story, 5th apartment from south at west

    May 13, 2026 · Apt 608

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective entrance door lock in the 2nd room from east located at apt 510, 5th story, 8th apartment from south at west

    Apr 27, 2026 · Apt 510

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective cabinet at west wall in the kitchen located at apt 510, 5th story, 8th apartment from south at west

    Apr 27, 2026 · Apt 510

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective electrical outlet at north wall in the kitchen located at apt 510, 5th story, 8th apartment from south at west

    Apr 27, 2026 · Apt 510

    Closed — Violation closed
Show 40 more ↓
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the private hallway located at apt 510, 5th story, 8th apartment from south at west

    Apr 27, 2026 · Apt 510

    Closed — Violation closed
  • C

    Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 510, 5th story, 8th apartment from south at west

    Apr 27, 2026 · Apt 510

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 510, 5th story, 8th apartment from south at west

    Apr 27, 2026 · Apt 510

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of low water pressure in the bathroom located at apt 608, 3rd story, 4th apartment from south at west

    Mar 31, 2026 · Apt 608

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak in closet at west wall in the 1st room from east at north located at apt 608, 3rd story, 4th apartment from south at west

    Mar 31, 2026 · Apt 608

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 608, 3rd story, 4th apartment from south at west

    Mar 31, 2026 · Apt 608

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wall cabinet doors at south wall in the kitchen located at apt 608, 3rd story, 4th apartment from south at west

    Mar 31, 2026 · Apt 608

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq feet at south wall in the bathroom located at apt 608, 6th story, 3rd apartment from south at west

    Nov 25, 2025 · Apt 608

    Closed — Violation closed
  • C

    Provide a safe and adequate supply of electric service to the fixtures at all fixtures and outlets in the entire apartment located at apt 608, 6th story, 3rd apartment from south at west

    Nov 25, 2025 · Apt 608

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at closet ceiliing in the 1st room from east located at apt 608, 6th story, 3rd apartment from south at west

    Nov 25, 2025 · Apt 608

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq feet at south wall in the bathroom located at apt 608, 6th story, 3rd apartment from south at west original violation 18473706 issued 25-nov-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Nov 25, 2025 · Apt 608

    Closed — Violation closed
  • C

    Provide a safe and adequate supply of electric service to the fixtures no electrical supply in the entire apartment located at apt 606, 6th story, 6th apartment from south at west

    Oct 18, 2025 · Apt 606

    Closed — Violation closed
  • A

    Refit the door in the entrance located at apt 608, 6th story, 3rd apartment from east at south

    Aug 30, 2025 · Apt 608

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective silicone caulking around the bathtub in the bathroom located at apt 608, 6th story, 3rd apartment from east at south

    Aug 30, 2025 · Apt 608

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling at closet in the 1st room from east at north located at apt 608, 6th story, 3rd apartment from east at south

    Aug 30, 2025 · Apt 608

    Closed — Violation closed
  • A

    Refit the door at second upper cabinet from east at south in the kitchen located at apt 608, 6th story, 3rd apartment from east at south

    Aug 30, 2025 · Apt 608

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over ceiling at closet in the 1st room from east at north located at apt 608, 6th story, 3rd apartment from east at south

    Aug 30, 2025 · Apt 608

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 608, 6th story, 3rd apartment from east at south

    Aug 30, 2025 · Apt 608

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over the ceiling at closet in the 1st room from east at north located at apt 608, 6th story, 3rd apartment from south at west

    Aug 7, 2025 · Apt 608

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling at closet in the 1st room from east at north located at apt 608, 6th story, 3rd apartment from south at west

    Aug 7, 2025 · Apt 608

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective caulk around bathtub in the 1st bathroom from east located at apt 608, 6th story, 3rd apartment from south at west

    Aug 7, 2025 · Apt 608

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective caulk around counter top in the kitchen located at apt 608, 6th story, 3rd apartment from south at west

    Aug 7, 2025 · Apt 608

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 601, 6th story, 3rd apartment from south at west

    Jul 2, 2025 · Apt 601

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 1st room from east located at apt 601, 6th story, 3rd apartment from south at west

    Jul 2, 2025 · Apt 601

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over ceiling in the kitchen located at apt 601, 6th story, 3rd apartment from south at west

    Jul 2, 2025 · Apt 601

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective control arm in the entrance located at apt 601, 6th story, 3rd apartment from south at west

    Jul 2, 2025 · Apt 601

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft a west wall in the 1st room from east at south located at apt 601, 6th story, 10th apartment from south at west

    Jun 1, 2025 · Apt 601

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 601, 6th story, 10th apartment from south at west

    Jun 1, 2025 · Apt 601

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak under ceiling in the kitchen located at apt 601, 6th story, 10th apartment from south at west

    Jun 1, 2025 · Apt 601

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from east at south located at apt 601, 6th story, 10th apartment from south at west

    Jun 1, 2025 · Apt 601

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Apr 30, 2025

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Apr 30, 2025

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Apr 30, 2025

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box

    Apr 30, 2025

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Apr 30, 2025

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.

    Apr 30, 2025

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Apr 30, 2025

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective silicone caulking around bathtub in the bathroom located at apt 608, 6th story, 5th apartment from south at west

    Feb 16, 2025 · Apt 608

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective silicone caulking south wall countertop in the kitchen located at apt 608, 6th story, 5th apartment from south at west

    Feb 16, 2025 · Apt 608

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at ceiling in closet in the 1st room from east at north located at apt 608, 6th story, 4th apartment from south at west

    Jan 15, 2025 · Apt 608

    Closed — Violation closed

DOB building violations · 15

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2024

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2024

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2021

    Aug 21, 2022

    Dob violation - dismissed
  • Construction other optional

    Borough commissioner swo/stop all work except to make site asfe

    Mar 10, 2021

    Dob violation - active
  • Construction other optional

    Borough comm. swo/stop all work /except to make site safe

    Mar 10, 2021

    Dob violation - active
  • Construction other optional

    Boro. comm. swo/the borough comm has ordered all worked stopped under appl#320916158 on 2/26/21 due bto construction superintendent/stop all work except to make site safe

    Mar 1, 2021

    Dob violation - active
  • Construction other optional

    Boro. comm. swo/the boro. comm. has ordered all worked stopped under appl#320916158 on 2.26/2021 due to construction superintendent withdra wal/stop all work except to make site safe

    Mar 1, 2021

    Dob violation - active
  • Construction other optional

    Borough commissioner swo order/stop all work except to make site safe

    Jul 7, 2020

    Dob violation - dismissed
  • Construction other optional

    Borough commissioner's swo order/stop all work except to make site safe

    Jul 7, 2020

    Dob violation - dismissed
  • Construction other optional

    Borough commissioner's swo order/stop all work except to make site saf e

    Jul 7, 2020

    Dob violation - dismissed
Show 5 more ↓
  • Construction other optional

    Borough commissioner's swo /stop all work /except to make site safe

    Jul 7, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 7, 2018

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed

ECB violations · 6

  • Class - 2

    Scaffold training certificat ecard not avalable for insp. note at time of inspection of a new bdlg under construction topped off at roof active jobsite i observed three workers on supported scaffold at expo #4

    Aug 1, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Sec. 3315.5 guardrails required. note: at the time of my inspection of a 23 sty bldg construction work in progress. i observed excavated soil(ramp)inadequately slope at approx 12feet in height i also observed

    May 24, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Filed a certificate,form,application etc,containing a material false statements. note: at the time of my inspection of a 23 sty bldg at partial foundation & excavation phase performing concrete operation. i obs

    May 24, 2018

    Resolve
  • Class - 1

    Wokr does not conform to approved construction documents &/or approved amendments. note: at the time of my inspection of a 23 sty bldg at partial foundation & excavation phase. i observed foundation operation

    May 24, 2018 · Penalty $625

    Resolve
  • Class - 1

    No site specific formwork design drawings. note: at the time of my inspection of a 23 sty bldg at partial foundation & excavation phase,construction work in progress that consist of formwork,rebar work & stripp

    May 24, 2018 · Penalty $625

    Resolve
  • Class - 1

    Bc3307.2.1:walkway.at time of inspection observed pathway in public stnot maintained at albermarle rd or at 3.29 st.public walkway obstructed by debris,or barricades creating a condition where pedestrians must

    Nov 8, 2017 · Penalty $800

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Jul 26, 2026 · Apt 608

    Close
  • Unsanitary condition

    Pests

    Jul 23, 2026 · Apt 510

    Close
  • Plumbing

    Water supply

    Jul 23, 2026 · Apt 510

    Close
  • Heat/hot water

    Apartment only

    Jul 23, 2026 · Apt 510

    Close
  • Plumbing

    Bathtub/shower

    Jul 23, 2026 · Apt 510

    Close
  • Heat/hot water

    Apartment only

    Jul 19, 2026 · Apt 608

    Close
  • Heat/hot water

    Entire building

    Jul 18, 2026 · Apt 608

    Close
  • Unsanitary condition

    Pests

    Jul 18, 2026 · Apt 608

    Close
  • Plumbing

    Basin/sink

    Jul 1, 2026 · Apt 510

    Close
  • Plumbing

    Basin/sink

    Jul 1, 2026 · Apt 510

    Close
Show 40 more ↓
  • Unsanitary condition

    Pests

    Jul 1, 2026 · Apt 510

    Close
  • Plumbing

    Basin/sink

    Jun 3, 2026 · Apt 510

    Close
  • Plumbing

    Basin/sink

    Jun 3, 2026 · Apt 510

    Close
  • Plumbing

    Water supply

    Jun 3, 2026 · Apt 510

    Close
  • Door/window

    Door

    Jun 3, 2026 · Apt 510

    Close
  • Paint/plaster

    Wall

    Jun 3, 2026 · Apt 510

    Close
  • Plumbing

    Water supply

    Jun 3, 2026 · Apt 510

    Close
  • Electric

    Outlet/switch

    Jun 3, 2026 · Apt 510

    Close
  • General

    Cabinet

    Jun 3, 2026 · Apt 510

    Close
  • Unsanitary condition

    Pests

    Jun 3, 2026 · Apt 510

    Close
  • Plumbing

    Water supply

    May 26, 2026 · Apt 608

    Close
  • Heat/hot water

    Apartment only

    May 11, 2026 · Apt 510

    Close
  • Heat/hot water

    Apartment only

    May 7, 2026 · Apt 510

    Close
  • Heat/hot water

    Apartment only

    May 4, 2026 · Apt 510

    Close
  • Heat/hot water

    Apartment only

    May 4, 2026 · Apt 510

    Close
  • Heat/hot water

    Apartment only

    Apr 30, 2026 · Apt 510

    Close
  • Heat/hot water

    Apartment only

    Apr 28, 2026 · Apt 510

    Close
  • Heat/hot water

    Apartment only

    Apr 25, 2026 · Apt 510

    Close
  • Heat/hot water

    Apartment only

    Apr 21, 2026 · Apt 510

    Close
  • Paint/plaster

    Door/frame

    Apr 16, 2026 · Apt 510

    Close
  • Unsanitary condition

    Pests

    Apr 16, 2026 · Apt 510

    Close
  • Electric

    Outlet/switch

    Apr 16, 2026 · Apt 510

    Close
  • General

    Cabinet

    Apr 16, 2026 · Apt 510

    Close
  • Door/window

    Door frame

    Apr 16, 2026 · Apt 510

    Close
  • Plumbing

    Water supply

    Apr 15, 2026 · Apt 510

    Close
  • Heat/hot water

    Apartment only

    Apr 15, 2026 · Apt 510

    Close
  • Heat/hot water

    Apartment only

    Apr 15, 2026 · Apt 510

    Close
  • Paint/plaster

    Wall

    Mar 26, 2026 · Apt 111

    Close
  • Unsanitary condition

    Pests

    Mar 26, 2026 · Apt 111

    Close
  • Plumbing

    Bathtub/shower

    Mar 16, 2026 · Apt 608

    Close
  • General

    Cabinet

    Mar 16, 2026 · Apt 608

    Close
  • Plumbing

    Water supply

    Mar 16, 2026 · Apt 608

    Close
  • Water leak

    Slow leak

    Mar 16, 2026 · Apt 608

    Close
  • General

    Ventilation system

    Mar 16, 2026 · Apt 608

    Close
  • Paint/plaster

    Wall

    Mar 16, 2026 · Apt 608

    Close
  • Unsanitary condition

    Mold

    Mar 16, 2026 · Apt 608

    Close
  • Unsanitary condition

    Pests

    Feb 24, 2026 · Apt 510

    Close
  • Safety

    Fire escape

    Feb 24, 2026 · Apt 510

    Close
  • Plumbing

    Bathtub/shower

    Feb 24, 2026 · Apt 510

    Close
  • Plumbing

    Basin/sink

    Feb 24, 2026 · Apt 510

    Close

Sales history

DatePriceTypeUnits
Oct 6, 2025$70,000,000Rentals - elevator apartments94

Building details

Building type
Elevator apartment building (D6)
Year built
2015
Floors
6
Residential units
93
Building area
86,099 ft²
Lot area
27,037 ft²
Zoning
R6
Community board
317
Council district
40
Block / lot
5131 / 1
Assessed value
$7,805,700
Landmark / historic district
No

HPD registration #391470, last renewed Jul 27, 2026.

Questions about Nostrand Ave

Who owns Nostrand Ave?

The owner of record in NYC Department of City Planning PLUTO data is Hello Nostrand Holdings LLC.

Does Nostrand Ave have violations?

Yes. NYC HPD has recorded 84 housing violations at this property.

Is Nostrand Ave rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was Nostrand Ave built?

City records list 2015 as the year it was built.

How many apartments are in Nostrand Ave?

It has 93 residential units and 94 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.