2212 Bedford Avenue
Brooklyn, NY 11226BBL 3-05103-0010Map
Owner of record: NYC Department Of Education
2212 Bedford Avenue is a school building built in 1904 in Brooklyn, 11226. The owner of record is NYC Department Of Education. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 199
- ECB violations
- 157
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 199
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 22, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 16, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 16, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2020
Dob violation - active
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 17, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 17, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 17, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 17, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 17, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 17, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 17, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active
ECB violations · 157
- Class - 2
Re-issue #35688838j. failure to maintain building in code-compliant manner. noted: smoke doors do not self-close properly at 5th flr-"staircase ", "staircase g". 4th flr-"stair q", "stair f", "smoke door near 4
Jan 16, 2026 · Penalty $3,125
Active - Class - 2
Exit door not self-closing. noted: exterior doors not self-closing properly, 1st flr"-exit 18", and "exit 15". remedy: repair and/or replacedoor.
Jan 16, 2026 · Penalty $625
Active - Class - 2
Reissue #35672642l. failure to maintain building in code-compliant manner: (1)4th floor smoke door, rm 411, h/f 3rd floor stairs p, t, @ auditorium left side at stage platform exits. remedy: repair and/or repla
Jan 31, 2025 · Penalty $1,562
Active - Class - 2
Failure to maintain building in code-compliant manner: reissue #35672643n. observation at various locations on 5 story building, water infiltration/penetratio throughout walls, ceiling. remedy: repair and/or re
Jan 31, 2025 · Penalty $1,562
Resolve - Class - 2
Reissue #35672641j. failure to maintain building in code-compliant manner: roof top in various locations plus far room cracks, checks, missing masonry grants etc. remedy: repair and/or replace.
Jan 31, 2025 · Penalty $1,562
Resolve - Class - 2
Reissue #35672640h. failure to maintain building in code-compliant manner: at stairs k d and j in various floors treads loose, cracks, broken concern for safety hazards for students, staff etc. remedy: replace
Jan 31, 2025 · Penalty $1,562
Resolve - Class - 2
Failure to maintain building in code compliant manner. car door in disrepair and malfunctioning, repair. in car communication inoperative, repair. motor room door missing a sign, provide. non elevator equipment
Jul 25, 2024 · Penalty $625
Active - Class - 2
Failure to maintain building in code compliant manner. annual brake maintenance past due (01/24/2023), perform routine maintenance and update the brake maintenance tag. category 1 tag expired (12/2022), provide
Jul 25, 2024 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code compliant manner. annual brake maintenance past due (01/24/2023), perform routine maintenance and update the brake maintenance tag. improper type of fire extinguisher in the
Jul 25, 2024 · Penalty $625
Resolve - Class - 2
Re-issue #35673060x. failure to maintain building in code-compliant manner. noted: observed throughout, these doors were no closing properlyfourth floor room 411, stair f, stair h, third floor stair t & p, in t
Feb 12, 2024 · Penalty $1,562
Active
Show 40 more ↓
- Class - 2
Re-issue #35673062j. failure to maintain building in code-compliant manner. noted: observed at stairs k, j, and d the treads are loose, and broken, cracks in some areas, which is a safety hazard. remedy: repair
Feb 12, 2024 · Penalty $1,562
Resolve - Class - 2
Re-issue #35673061h. failure to maintain building in code-compliant manner. noted: observed at roof level above the fan room there are cracks at various locations. remedy: reapir and/or replace.
Feb 12, 2024 · Penalty $1,562
Resolve - Class - 2
Re-issue #35673059z. failure to maintain building in code-compliant manner. noted: observed at various locations in the building there are signs of water penetration. remedy: repair and/or replace.
Feb 12, 2024 · Penalty $1,562
Resolve - Class - 2
Reissue#35655541h 6/22/2022.failure to maintain building in code compliant manner.noted observed during inspection of school water penetration at stair l,stair r roof level,stair e 2znc,stair at exit 9 behind g
Mar 24, 2023 · Penalty $1,562
Resolve - Class - 2
Failure to maintain building in code compliant manner.noted observed during inspection of pool side basement boiler room(rm bn1)pipes severely leaking in several areas throughout with water pooling on the floor
Mar 24, 2023 · Penalty $625
Resolve - Class - 2
Reissue#35655540x 6/22/2022.failure to maintain building in code compliant manner.noted observed during inspection of school fire proof selfclosing doors on 5th fl(st f)4th fl(st a)3rd fl(st t,st p,st k),2nd fl
Mar 24, 2023 · Penalty $1,562
Active - Class - 2
Reissue #35655543l (6/22/22)failure to maintain building in code-compliant manner.noted:observed during inspection of boiler rm by fire pump & throughout has spalling walls,missing mortar & delaminating bricks.
Mar 24, 2023 · Penalty $1,562
Resolve - Class - 2
Reissue#35655539z 6/22/2022 failure to maintain building in code compliant manner.noted observed during inspection of roof level fan room cracks over the entrance doors.exterior exp3 bedford ave across from era
Mar 24, 2023 · Penalty $1,562
Resolve - Class - 2
Reissue#35673062j 6/22/2022 failure to maintain building in code compliant manner.noted observed during inspection of stair k,stair j,stair d are in severe disrepair.they are missing sections,broken,cracked and
Mar 24, 2023 · Penalty $1,562
Resolve - Class - 2
Reissue#35582457k failure to maintain building in code-compliant manner.noted:observed during inspection of 4th floor rm 441,fpscd near 436,near 4e1,gym door on 4th floor,star g,stair t,stair f,stair m,3rd floo
Jun 22, 2022 · Penalty $1,562
Active - Class - 2
Reissue#35582462p failure to maintain building in code-compliant manner:noted:observed during inspection of cafeteria section of ceiling approx 10ft by 12ft missing and in disrepair from water penetration.rem:r
Jun 22, 2022 · Penalty $1,562
Resolve - Class - 2
Failure to maintain building in code-compliant manner.noted:observed during inspection water penetration at multiple locations throughout causing peeling/spalling plaster at rm 238,bn20,2n14,corridors areas.rem
Jun 22, 2022 · Penalty $625
Resolve - Class - 2
Reissue#35582456z exit door not self-closing noted:observed during inspection of exterior exit door#17,18,19,20,are not self closing at time of inspection.rem:repair/replace door.
Jun 22, 2022 · Penalty $1,562
Resolve - Class - 2
Reissue#35582454p failure to maintain building wall(s)or appurtenancesnoted:observed during inspection of gas meter room,spalling plaster/masonry from ceiling/wall due to water penetration in to the area.rem:ma
Jun 22, 2022 · Penalty $3,125
Resolve - Class - 2
Reissue#35582465k failure to maintain building wall(s)or appurtenancesnoted:observed during inspection of boiler room throughout are in disrepair they have become porous allowing water to penetrate,washing out
Jun 22, 2022 · Penalty $3,125
Resolve - Class - 2
Reissue#35582455r failure to maintain building in code-compliant manner.noted:observed during inspection of roof level fan(near generator room)exterior cracks on the facade outside throughout and over doors and
Jun 22, 2022 · Penalty $1,562
Resolve - Class - 2
Reissue#35582461n failure to maintain building in code-compliant manner:noted:observed during inspection of building water penetration issueat multiple location 1)roof level stairwell at fan room,stair l,stair
Jun 22, 2022 · Penalty $1,562
Resolve - Class - 2
Failure to maintain building in code-compliant manner noted:observed during inspection of stair throught,threads are in disrepair,missing covers,cracked at stair k,stair j,stair d.rem:repair and/or replace.
Jun 22, 2022 · Penalty $625
Resolve - Class - 2
Exit door not selfclosing.observed:@grnd level exit door17,18,19,20&23dont close properly when insp.also,glass panel on doors was replaced by acrylic panel.repair/replace door.
Jul 6, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner:observed:@roof level elevator rm door,staircasef smoke door,@5fl,classrm door541,@4fl,stairf&t smoke door,stair6 corridor smoke door,roof level staircasek smoke
Jul 6, 2021 · Penalty $625
Active - Class - 2
Failure to maintain bldg in codecompliant manner observed:@cafeteria spalling&missing plaster from ceiling due to water penetration.also,missing of ceiling in acoustic panel.affected area:25'x30'approx.@corrido
Jul 6, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner observed:@electrical rm next to cafeteria,excessive storage of cleaning supplies,tables,boards&cans being store w/i rm&close to utility boxes.repair &/or replace
Jul 6, 2021 · Penalty $625
Resolve - Class - 2
28.301.1 reissue35496098r failure to provide natural or mechanical vent to occupied spaces per 17c401.2 observed:@bsmt level storage of gas equipment.comply w/notice of violation
Jul 6, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner:no firestopping per bc712.3;27-345 observed:@cellar level oiltank rm pipes penetration holes&loss of concrete blocks@gas meter rm pipes penetration&holes w/no fi
Jul 6, 2021 · Penalty $1,250
Resolve - Class - 2
Reissue35496099z failure to maintain bldg wall(s) or appurtenances,observed:@bsmt level,gas meter rm spalling plaster from ceiling&wall due water damage.maintain exterior bldg wall.
Jul 6, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner.observed:missing handrail@4-3fl,stair6,staircasek from 4fl-roof,staircasem from 2-3fl,stairo from 1fl-bsmt,cafeteria to exit10.repair &/or replace.
Jul 6, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner:illumination for exits,exit discharges&public corridors per bc1006.1;27-381.observed:@1fl gym&auditorium.existing emergency light arent operational when tested.r
Jul 6, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner observed@roof level staircasep loss&detachment of metallic flanges on waterproofing membrane.also in several secs of parapet wall theres detachment&loss of metal
Jul 6, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg wall(s) or appurtenances observed:@cellar level boiler rm foundation walls have become porous,allowing water to penetrate into rms (boiler&storage) maintain exterior bldg wall
Jul 6, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner:observed@roof level staricasef several cracks in different locations.generator rm horiz cracks,l 20'(exterior wall)&6'(interior walls),vent rm vert cracks l12'ap
Jul 6, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner:observed damage to ceiling&walls due to water penetration from exterior walls&roof level indifferent location:@4fl staircase6 next to ventrm,staircasel,staircase
Jul 6, 2021 · Penalty $625
Resolve - Class - 2
Reissue#35342579x failure to maintain bldg walls as appurtenances. noted: at time of inspection observed at basement level at gas meter roomspalling plaster from the cellar & wall falling(cause)from water damag
Jun 12, 2020 · Penalty $3,125
Resolve - Class - 2
Reissue#35342576k failure to maintain bldg in code compliant manner. noted: at time of inspection i observed concrete walkway located underneath the bedford ave arch & flatbush ave arch(15)severely cracked need
Jun 12, 2020 · Penalty $1,562
Resolve - Class - 2
Sec. 28-301.1 reissue#35447816l failure to provide natural or mechanical ventilation to occupied spaces per mc 401.2. noted: at time of inspection i observed at basement level storage of gas equipment snow blow
Jun 12, 2020 · Penalty $1,250
Resolve - Class - 2
28-301.1=failure to provide natural or mechanical ventilation to occupied spaces per mc 401.2 note at basmenet level storage of gas equipment(ie snowblowers backpack blower,lawn mowers)remove gas equipment and
Aug 7, 2019
Resolve - Class - 2
Failure to maintain building in code compliant manner use of prohibited door and or hardware per bc 1008.1.8; 27-371(j) note kick stops installed on door @various on all floors.rem: provide legal hardware.
Aug 7, 2019
Resolve - Class - 2
27-1018=unsafe storage of combustible mateiral and equipment note at basement level storage of gas equipment (ie snowblowers) back blower lawn mowers as per remove gas euqipment and store outside
Aug 7, 2019
Resolve - Class - 2
Failure to maintain bldg walls or appurtenances. noted: at gas meter room,spalling plaster from the ceiling & walls. remedy: make necessary repairs.
Jun 25, 2018
Resolve - Class - 2
Reissue#35271464k failure to maintain bldg in code compliant manner. noted: concrete walkway located underneath the bedford ave arch & flatbush ave arch is severely cracked. remedy: comply w/notice of violation
Jun 25, 2018
Resolve - Class - 2
Reissue#35221380h. failure to maintain bldg walls or appurtenances. noted: foundation wall have become porous allowing the water to pentrate into the electrical room & gas meter room. remedy: make necessary rep
Jun 25, 2018
Resolve
Complaints
- Heat/hot water
Entire building
Aug 27, 2022 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W1)
- Year built
- 1904
- Floors
- 5
- Residential units
- —
- Building area
- 247,400 ft²
- Lot area
- 188,890 ft²
- Zoning
- C4-4A
- Community board
- 314
- Council district
- 40
- Block / lot
- 5103 / 10
- Assessed value
- $30,890,700
- Landmark / historic district
- INDIVIDUAL LANDMARK
Questions about 2212 Bedford Avenue
Who owns 2212 Bedford Avenue?
The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Education.
Does 2212 Bedford Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 2212 Bedford Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2212 Bedford Avenue built?
City records list 1904 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.