1415 Albany Avenue
Brooklyn, NY 11203BBL 3-04988-0061Map
Owner of record: Alric A Blair
1415 Albany Avenue is a walk-up apartment building built in 1930 in Brooklyn, 11203. It has 3 residential units across 2 floors. The owner of record is Alric A Blair. HPD has recorded 56 housing violations here, most recently on June 6, 2025. 10 of the 50 most recent violations are still open.
- HPD violations
- 56
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 41
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 56
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 6, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 21, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the bathroom located at apt 1floor, 1st story, 1st apartment from west at north
Mar 20, 2023 · Apt 1FLOOR
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Mar 20, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective reglaze bathtub in the bathroom located at apt 1floor, 1st story, 1st apartment from west at north
Mar 20, 2023 · Apt 1FLOOR
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective recaulk top of bathtub in the bathroom located at apt 1floor, 1st story, 1st apartment from west at north
Mar 20, 2023 · Apt 1FLOOR
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the ceramic tills at all walls in the bathroom located at apt 1floor, 1st story, 1st apartment from west at north
Mar 20, 2023 · Apt 1FLOOR
Closed — Violation closed - ANon-hazardous
Replace with new the missing doors wash basin cabinet in the bathroom located at apt 1floor, 1st story, 1st apartment from west at north
Mar 20, 2023 · Apt 1FLOOR
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... all walls approximately 6 sq. feet in the bathroom located at apt 1stflo, 1st story, 1st apartment from east at south
Apr 14, 2022 · Apt 1STFLO
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 1stflo, 1st story, 1st apartment from east at south
Apr 14, 2022 · Apt 1STFLO
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 23, 2022
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors at building entrance , 1st story
Apr 26, 2021
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors , in the entrance located at apt 1, 1st story, 1st apartment from east at south
Apr 26, 2021 · Apt 1
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors at building entrance , 1st story
Apr 14, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 7, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 9, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 9, 2021
Closed — Violation closed - BHazardous
Remove the illegal fastening consisting of key operated double cylinder lock installed at metal gate at front yard
Mar 9, 2021
Closed — Violation closed - BHazardous
Remove the illegal fastening consisting of key operated double cylinder lock installed at metal door at front of building , 1st story
Mar 9, 2021
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors at front entrance to building , 1st story
Mar 9, 2021
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors .. in the entrance located at apt 1, 1st story, apartment at south
Mar 9, 2021 · Apt 1
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of key operated lock at entrance door to room with egress window to rear yard in the 1st room from east at north located at apt 1, 1st story, apartment at south
Mar 9, 2021 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, apartment at south
Mar 9, 2021 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1, 1st story, apartment at south
Mar 9, 2021 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ..the ceiling and all walls in the 3rd room from east located at apt 1, 1st story, apartment at south
Mar 9, 2021 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, apartment at south
Mar 9, 2021 · Apt 1
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 22 sq. ft. at ceiling and all walls in the bathroom located at apt 1, 1st story, apartment at south
Mar 9, 2021 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, apartment at south
Mar 9, 2021 · Apt 1
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Mar 9, 2021
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Mar 9, 2021
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Mar 9, 2021
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Mar 9, 2021
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Mar 9, 2021
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system ..locked door at basement
Mar 9, 2021
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at wash basin,bathtub, water closet and kitchen sink in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Mar 5, 2021 · Apt 1
Open — Violation will be reinspected - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Mar 5, 2021 · Apt 1
Open — Violation will be reinspected - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Mar 5, 2021 · Apt 1
Open — Violation will be reinspected - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Mar 5, 2021 · Apt 1
Open — Violation will be reinspected - BHazardous
Replace with new the broken or defective wall cabinet at east in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Mar 5, 2021 · Apt 1
Open — Violation will be reinspected - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Mar 5, 2021 · Apt 1
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... approx 80 square feet at ceiling and all walls in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Mar 5, 2021 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at bathtub,wash basin and kitchen sink located at apt 1, 1st story, 1st apartment from east at south
Mar 5, 2021 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Mar 5, 2021 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls in the 2nd room from east located at apt 1, 1st story, 1st apartment from east at south
Mar 3, 2021 · Apt 1
Open — Violation will be reinspected - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east located at apt 1, 1st story, 1st apartment from east at south
Mar 3, 2021 · Apt 1
Open — Violation will be reinspected - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Mar 3, 2021 · Apt 1
Open — Violation will be reinspected - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1, 1st story, 1st apartment from east at south
Mar 3, 2021 · Apt 1
Open — Violation will be reinspected - BHazardous
Trace and repair the source and abate the visible mold condition... approx. 20 sq. ft. at ceiling and all walls in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Mar 3, 2021 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at washbasin, sink and bathtub and water closet located at apt 1, 1st story, 1st apartment from east at south
Mar 3, 2021 · Apt 1
Open — Violation will be reinspected
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Apartment only
Mar 19, 2023 · Apt 1FLOOR
Close - Electric
No lighting
Jan 26, 2023 · Apt 1FLOOR
Close - Heat/hot water
Apartment only
Dec 19, 2022 · Apt 1
Close - Heat/hot water
Apartment only
Oct 22, 2022 · Apt 1FL
Close - Heat/hot water
Apartment only
Oct 22, 2022 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Oct 20, 2022 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Sep 5, 2022 · Apt 1
Close - Plumbing
Basin/sink
Jun 2, 2022 · Apt 1STFLO
Close - Flooring/stairs
Floor
Jun 2, 2022 · Apt 1STFLO
Close - Plumbing
Bathtub/shower
Jun 2, 2022 · Apt 1STFLO
Close
Show 31 more ↓
- Unsanitary condition
Pests
May 5, 2022 · Apt 1STFL
Close - Electric
No lighting
Apr 2, 2022 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Apr 2, 2022 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Mar 31, 2022 · Apt 1STFLO
Close - Heat/hot water
Entire building
Mar 30, 2022 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Feb 5, 2022 · Apt 1
Close - Unsanitary condition
Mold
Jan 24, 2022 · Apt 1
Close - Electric
No lighting
Nov 18, 2021 · Apt 2
Close - Door/window
Door
Aug 24, 2021 · Apt 3FL
Close - General
Bell/buzzer/intercom
Jun 16, 2021 · Apt 1
Close - Appliance
Refrigerator
Jun 16, 2021 · Apt 1
Close - Electric
Lighting
Jun 16, 2021 · Apt 1
Close - Appliance
Electric/gas range
Jun 16, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Mar 9, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Mar 9, 2021 · Apt 1
Close - Plumbing
Toilet
Mar 8, 2021 · Apt 1
Close - Plumbing
Radiator
Mar 8, 2021 · Apt 1
Close - Unsanitary condition
Pests
Mar 8, 2021 · Apt 1
Close - Unsanitary condition
Pests
Mar 8, 2021 · Apt 1
Close - Plumbing
Water supply
Mar 8, 2021 · Apt 1
Close - Unsanitary condition
Mold
Mar 8, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Mar 6, 2021 · Apt 1
Close - Plumbing
Water supply
Mar 4, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Mar 4, 2021 · Apt 1
Close - Paint/plaster
Wall
Mar 1, 2021 · Apt 1
Close - Plumbing
Water supply
Mar 1, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Mar 1, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Jan 12, 2021 · Apt B
Close - Door/window
Door
Apr 17, 2015 · Apt 1
Close - Door/window
Door
Apr 17, 2015 · Apt 1
Close - Heating
Heat related
Jul 16, 2012 · Apt 2NDF
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1930
- Floors
- 2
- Residential units
- 3
- Building area
- 2,046 ft²
- Lot area
- 1,742 ft²
- Zoning
- R4
- Community board
- 317
- Council district
- 45
- Block / lot
- 4988 / 61
- Assessed value
- $47,520
- Landmark / historic district
- No
HPD registration #380574, last renewed Aug 24, 2025.
Questions about 1415 Albany Avenue
Who owns 1415 Albany Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Alric A Blair.
Does 1415 Albany Avenue have violations?
Yes. NYC HPD has recorded 56 housing violations at this property.
Is 1415 Albany Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1415 Albany Avenue built?
City records list 1930 as the year it was built.
How many apartments are in 1415 Albany Avenue?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.