roofy

702 East 37 Street

Brooklyn, NY 11203BBL 3-04970-0032Map

Owner of record: Temba, Anicetus

702 East 37 Street is an one-family home built in 1925 in Brooklyn, 11203. It has 1 residential unit across 2 floors. The owner of record is Temba, Anicetus. HPD has recorded 92 housing violations here, most recently on September 28, 2026. 50 of the 50 most recent violations are still open.

HPD violations
92
DOB violations
0
ECB violations
5
HPD complaints
33

What to know

Concern
13 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 28, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 92

  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt pvt lower level, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, north wall, west wall in the 3rd room upper level from east at south located at apt pvt upper level, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, south wall, 1st window frame from east at south wall in the 2nd room upper level from east located at apt pvt upper level, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room lower level from east located at apt pvt lower level, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east, the private hallway , the 1st room from east, the kitchen , the bathroom located at apt pvt lower level, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 2nd room upper level from east located at apt pvt, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall, 1st door from west at north wall, 1st closet from south at west wall door frame in the 2nd room upper level from east located at apt pvt, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt pvt, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the north wall, west wall and ceiling in the private hallway located at apt pvt upper level, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt pvt, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Nov sent out
Show 40 more ↓
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt pvt, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the baseboard at west wall, 1st closet from north at east wall door frame, baseboard at west wall, 1st closet from north at east wall door frame, baseboard at west wall in the 3rd room upper level from east at south located at apt pvt upper level, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the west wall, baseboard at south wall, west wall, baseboard at south wall, west wall, baseboard at south wall in the 2nd room lower level from east located at apt pvt lower level, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt pvt, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed at the ceiling in the kitchen located at apt pvt, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Notice of issuance sent to tenant
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed at the north wall in the kitchen located at apt pvt, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Notice of issuance sent to tenant
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed at the west wall in the kitchen located at apt pvt, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the north wall and west wall in the kitchen located at apt pvt, 1st story, 1st apartment from south at west

    Sep 28, 2026 · Apt PVT

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt privat, 1st apartment from south at west

    Apr 12, 2026 · Apt PRIVAT

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt privat upper level, 1st apartment from south at west

    Apr 12, 2026 · Apt PRIVAT

    Open — Nov sent out
  • B

    Repair the broken or defective connection waste line at sink in the kitchen located at apt privat, 1st apartment from south at west

    Apr 12, 2026 · Apt PRIVAT

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt privat, 1st apartment from south at west

    Apr 12, 2026 · Apt PRIVAT

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt privat, 1st apartment from south at west

    Apr 12, 2026 · Apt PRIVAT

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt firstf, 1st story, 1st apartment from south at west

    Mar 18, 2026 · Apt FIRSTF

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over the ceiling in the private hallway located at apt firstf, 1st story, 1st apartment from south at west

    Mar 18, 2026 · Apt FIRSTF

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from east at south wall, 1st radiator from east at south wall in the 2nd room upper level from east located at apt firstf upper level, 1st story, 1st apartment from south at west

    Mar 18, 2026 · Apt FIRSTF

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over the ceiling in the bathroom located at apt firstf, 1st story, 1st apartment from south at west

    Mar 18, 2026 · Apt FIRSTF

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room upper level from east at south located at apt firstf upper level, 1st story, 1st apartment from south at west

    Mar 18, 2026 · Apt FIRSTF

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wall cabinet at north wall in the kitchen located at apt firstf, 1st story, 1st apartment from south at west

    Mar 18, 2026 · Apt FIRSTF

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 3rd room from east at south located at apt firstf upper level, 1st story, 1st apartment from south at west

    Mar 18, 2026 · Apt FIRSTF

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color at the ceiling in the bathroom located at apt firstf, 1st story, 1st apartment from south at west

    Mar 18, 2026 · Apt FIRSTF

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color at the ceiling in the kitchen located at apt firstf, 1st story, 1st apartment from south at west

    Mar 18, 2026 · Apt FIRSTF

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood base cabinet flooring at north wall in the kitchen located at apt firstf, 1st story, 1st apartment from south at west

    Mar 18, 2026 · Apt FIRSTF

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door frame, baseboard at south wall in the 2nd room upper level from east located at apt firstf upper level, 1st story, 1st apartment from south at west

    Mar 18, 2026 · Apt FIRSTF

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door in the 2nd room upper level from east located at apt firstf upper level, 1st story, 1st apartment from south at west

    Mar 18, 2026 · Apt FIRSTF

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the kitchen , the bathroom located at apt firstf upper level, 1st story, 1st apartment from south at west

    Mar 18, 2026 · Apt FIRSTF

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, north wall, south wall, west wall in the 3rd room upper level from east at south located at apt firstf upper level, 1st story, 1st apartment from south at west

    Mar 18, 2026 · Apt FIRSTF

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt firstf upper level, 1st story, 1st apartment from south at west

    Mar 18, 2026 · Apt FIRSTF

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door frame from west at north wall, baseboard at east wall in the 3rd room upper level from east at south located at apt firstf upper level, 1st story, 1st apartment from south at west

    Mar 18, 2026 · Apt FIRSTF

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at baseboard at south wall in the 2nd room upper level from east located at apt firstf upper level, 1st story, 1st apartment from south at west

    Mar 18, 2026 · Apt FIRSTF

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 17, 2026

    Open — Info nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen , the private hallway , the 2nd room from east located at apt privt lower level, 1st story, 1st apartment from south at west

    Feb 15, 2026 · Apt PRIVT

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the west wall and ceiling in the kitchen located at apt privt, 1st story, 1st apartment from south at west

    Feb 15, 2026 · Apt PRIVT

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective air valve at radiator at south wall in the 2nd room from east located at apt privt lower level, 1st story, 1st apartment from south at west

    Feb 15, 2026 · Apt PRIVT

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective wood door at entrance in the 12th room from east located at apt privt upper level, 1st story, 1st apartment from south at west

    Feb 15, 2026 · Apt PRIVT

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt privt, 1st story, 1st apartment from south at west

    Feb 15, 2026 · Apt PRIVT

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective air valve at radiator at east wall in the 11th room from east located at apt privt upper level, 1st story, 1st apartment from south at west

    Feb 15, 2026 · Apt PRIVT

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 13th room from east at south located at apt privt upper level, 1st story, 1st apartment from south at west

    Feb 15, 2026 · Apt PRIVT

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room lower level from east located at apt privt lower level, 1st story, 1st apartment from south at west

    Feb 15, 2026 · Apt PRIVT

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the north wall and ceiling in the private hallway located at apt privt upper level, 1st story, 1st apartment from south at west

    Feb 15, 2026 · Apt PRIVT

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 5

  • Class - 1

    Occupancy contrary to c of o or building records. atoi, partitions erected in cellar to create 2 pcs bathroom (toilet,sink) & 1 pc bathroom (stall shower), full size bed near kitchen area with residential sink,

    Jun 9, 2025 · Penalty $12,500

    Active
  • Class - 2

    Work without permit. at time of inspection, observed illegal plumbing work completed in the cellar. installing water and waste lines for residential sink kitchen and 2 pcs bathroom (sink, toilet), and 1pc (stal

    Jun 9, 2025 · Penalty $6,250

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. at time of inspection, observed in the cellar and 1st floor various large opening

    Jun 9, 2025 · Penalty $12,500

    Active
  • Class - 1

    Work without permit. at time of inspection, observed full height partitions erected to sub-divide the cellar, creating illegal class a apartment, bed/living room, residential sink kitchen area, and 2 bathrooms

    Jun 9, 2025 · Penalty $12,500

    Active
  • Class - 1

    Work without permit. at time of inspection, observed illegal electrical work completed in the cellar. installing outlets, switches, and light fixtures for bed/living room, kitchen area and bathrooms inside ille

    Jun 9, 2025 · Penalty $12,500

    Active

Complaints

  • Heat/hot water

    Apartment only

    Oct 21, 2026 · Apt 2FL

    Open
  • Paint/plaster

    Ceiling

    Oct 21, 2026 · Apt 2FL

    Open
  • Unsanitary condition

    Pests

    Sep 24, 2026 · Apt PVT

    Close
  • Unsanitary condition

    Pests

    Sep 24, 2026 · Apt PVT

    Close
  • Unsanitary condition

    Mold

    Sep 24, 2026 · Apt PVT

    Close
  • Paint/plaster

    Ceiling

    Mar 13, 2026 · Apt FIRSTF

    Close
  • General

    Cabinet

    Mar 13, 2026 · Apt FIRSTF

    Close
  • Paint/plaster

    Wall

    Mar 13, 2026 · Apt FIRSTF

    Close
  • Water leak

    Heavy flow

    Mar 13, 2026 · Apt FIRSTF

    Close
  • Flooring/stairs

    Floor

    Mar 13, 2026 · Apt FIRSTF

    Close
Show 23 more ↓
  • Door/window

    Door

    Mar 13, 2026 · Apt FIRSTF

    Close
  • Heat/hot water

    Entire building

    Feb 12, 2026 · Apt PRIVT

    Close
  • Paint/plaster

    Ceiling

    Feb 12, 2026 · Apt PRIVT

    Close
  • Plumbing

    Radiator

    Feb 12, 2026 · Apt PRIVT

    Close
  • Water leak

    Heavy flow

    Nov 12, 2025 · Apt PVT

    Close
  • General

    Cabinet

    Nov 12, 2025 · Apt PH

    Close
  • Plumbing

    Basin/sink

    Nov 12, 2025 · Apt PH

    Close
  • Unsanitary condition

    Pests

    Nov 12, 2025 · Apt PH

    Close
  • Unsanitary condition

    Mold

    Nov 12, 2025 · Apt PH

    Close
  • Flooring/stairs

    Floor

    Nov 12, 2025 · Apt PH

    Close
  • Water leak

    Heavy flow

    Nov 12, 2025 · Apt PH

    Close
  • Paint/plaster

    Wall

    Nov 12, 2025 · Apt PH

    Close
  • Paint/plaster

    Wall

    Nov 12, 2025 · Apt PH

    Close
  • Water leak

    Heavy flow

    Mar 31, 2025 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Mar 31, 2025 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Mar 31, 2025 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Mar 31, 2025 · Apt 1

    Close
  • Paint/plaster

    Wall

    Dec 5, 2024 · Apt 1

    Close
  • Water leak

    Slow leak

    Dec 5, 2024 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Oct 30, 2024 · Apt HOUSE

    Close
  • General

    Cabinet

    Oct 30, 2024 · Apt HOUSE

    Close
  • Water leak

    Heavy flow

    Oct 30, 2024 · Apt HOUSE

    Close
  • Plumbing

    Basin/sink

    Oct 30, 2024 · Apt HOUSE

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
One-family home (A1)
Year built
1925
Floors
2
Residential units
1
Building area
1,230 ft²
Lot area
2,000 ft²
Zoning
R4
Community board
317
Council district
45
Block / lot
4970 / 32
Assessed value
$45,480
Landmark / historic district
No

Questions about 702 East 37 Street

Who owns 702 East 37 Street?

The owner of record in NYC Department of City Planning PLUTO data is Temba, Anicetus.

Does 702 East 37 Street have violations?

Yes. NYC HPD has recorded 92 housing violations at this property.

Is 702 East 37 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 702 East 37 Street built?

City records list 1925 as the year it was built.

How many apartments are in 702 East 37 Street?

It has 1 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.