Violations at 710 East New York Avenue
Brooklyn, NY 11203 · BBL 3-04795-0016 · Back to the property
HPD housing violations
The newest 50 of 74 HPD violations. The city keeps the complete history.
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 15j, 15th story, 6th apartment from west at north
Jul 28, 2026 · Apt 15J
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges, at bulkhead to roof, 2nd bulkhead from north at public hall, 20th story
Jun 15, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at 1st and 2nd fire door from north at east at public hall, 15th story
Jan 30, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at 2nd fire door from north at east at public hall, 15th story
Jan 5, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at hopper door at public hall, 15th story
Jan 5, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 19b, 19th story, 5th apartment from north at east
Sep 14, 2025 · Apt 19B
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at riser in the 1st room from east located at apt 7b, 7th story, 4th apartment from north at east
Aug 27, 2025 · Apt 7B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective rubber gasket at refrigerator doors in the kitchen located at apt 7b, 7th story, 4th apartment from north at east
Aug 27, 2025 · Apt 7B
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures no volume in the entire apartment located at apt 7b, 7th story, 4th apartment from north at east
Aug 27, 2025 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures no volume in the entire apartment located at apt 7b, 7th story, 4th apartment from north at east
Aug 27, 2025 · Apt 7B
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation at riser in the kitchen located at apt 7b, 7th story, 4th apartment from north at east
Aug 27, 2025 · Apt 7B
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the steam riser at south wall in the 1st room from east located at apt 7b, 7th story, 5th apartment from north at east
Aug 13, 2025 · Apt 7B
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the steam riser at north wall in the kitchen located at apt 7b, 7th story, 5th apartment from north at east
Aug 13, 2025 · Apt 7B
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 28, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set at 1st fire door from north at east leading to stair a at public hall, 1st story
Jun 28, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at 1st fire door from north at east leading to stair a at public hall, 1st story
Jun 28, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl composite floor tiles at public hall, 20th story
Jun 28, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at 1st fire door from north at east leading to stair b at public hall, 20th story
Jun 28, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set and hinges at 1st fire door from north at east leading to stair b at public hall, 20th story
Jun 28, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Jun 27, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective with fire retardant material at ceiling at public hall, 1st story
Jun 27, 2025
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items and boxes at public hall, 1st story
Jun 27, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective at vinyl floor tiles at public hall, 12th story
Jun 27, 2025
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items and boxes at public hall, 12th story
Jun 27, 2025
Closed — Violation dismissed - BHazardous
Replace with new the missing latch at fire door leading fire stair. south section at public hall, 12th story
May 9, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door south section at public hall, 1st story
May 9, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at east fire door at public hall, 1st story
May 9, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at east fire door. at public hall, 1st story
May 9, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tile at north east and south wall in the bathroom located at apt 12h, 12th story, 4th apartment from south at west
May 9, 2025 · Apt 12H
Closed — Violation closed - BHazardous
Replace the broken or defective washbasin at nortn wall in the bathroom located at apt 12h, 12th story, 4th apartment from south at west
May 9, 2025 · Apt 12H
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl tile at floor in the 4th room from north located at apt 12h, 12th story, 4th apartment from south at west
May 9, 2025 · Apt 12H
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling throughout in the entire apartment located at apt 12h, 12th story, 4th apartment from south at west
May 9, 2025 · Apt 12H
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 12h, 12th story, 4th apartment from south at west
May 9, 2025 · Apt 12H
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 20l, 20th story, 2nd apartment from south at west
Apr 1, 2025 · Apt 20L
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 20l, 20th story, 2nd apartment from south at west
Apr 1, 2025 · Apt 20L
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 9k, 9th story, 1st apartment from north at east
Mar 17, 2025 · Apt 9K
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 9k, 9th story, 1st apartment from north at east
Mar 17, 2025 · Apt 9K
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 9k, 9th story, 1st apartment from north at east
Mar 17, 2025 · Apt 9K
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 9k, 9th story, 1st apartment from north at east
Mar 17, 2025 · Apt 9K
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 20th story
Mar 5, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 20th story
Mar 5, 2025
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq.ft at ceiling at public hall, 20th story
Mar 5, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at 2nd fire door from north at east at public hall, 20th story
Mar 5, 2025
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at east wall in the 3rd room from north at west located at apt 20c, 20th story, 6th apartment from north at east
Mar 5, 2025 · Apt 20C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 20c, 20th story, 6th apartment from north at east
Mar 5, 2025 · Apt 20C
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 3rd room from north at west located at apt 20c, 20th story, 6th apartment from north at east
Mar 5, 2025 · Apt 20C
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 3rd room from north at west located at apt 20c, 20th story, 6th apartment from north at east
Mar 5, 2025 · Apt 20C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at 2nd fire door from north at east at public hall, 1st story
Mar 5, 2025
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing kickstand at laundry room door at public hall, 1st story
Mar 5, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Mar 5, 2025
Closed — Violation closed
DOB building violations
37 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Oct 23, 2018
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 27, 2018
Dob violation - dismissed - Nycha elev annual inspection/test elevatorrequired
Vio issued to nycha elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Nycha elev annual inspection/test elevatorrequired
Vio issued to nycha elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)
Feb 16, 2017
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2015
Mar 14, 2016
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 10, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Feb 22, 2010
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Construction other optional
Failure to maintain building in code complaint manner remedy; remove unsound concrete and repair defects forthwith
Oct 3, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 10, 2000
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 6, 1998
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Elevator elevatorrequired
(50)motor room
Dec 22, 1988
Dob violation - resolved
ECB violations
16 ECB violations, newest first.
- Class - 2
At the time of my inspection i observed that there were no manufacturer specifications for the rope scaffolding platform and the c-hooks being used.
Oct 28, 2024
Resolve - Class - 2
At the time of my inspection i observed that there were no notification for the rope scaffolding installed and being used.
Oct 28, 2024
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control909949.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 1
Failure to take provide adequate safety measure such as sidewalk shed's fence, etc where require to protect and secure public safety from documented unsafe facade as per 1rcny-103-04. facade technical report fi
Oct 10, 2018
Resolve - Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4 for control #809949.rem:submit required technical report.
May 18, 2018
Resolve - Class - 2
Failure to maintain exterior bldg walls & appurtenances. @ time of insp observed on exp#1 damaged flashing on roof deck, exp#2 n/ elevation, damage flashing @ roof deck. exp#3 damaged flashing @ roof deck, erod
Mar 1, 2018
Resolve - Class - 2
Failure to obtain permit for temporary construction equipment.note at time of inspection i observed sidewalk shed in place without permit in place.remedy:comply with code-obtain permit.
Oct 4, 2017
Resolve - Class - 2
Notification. noted: at time of inspection there was no hanging equip ment/outriggers on site. failure to notify the dept prior to removal of outriggers in connection w/suspended scaffolds.confirmation #309982
Apr 16, 2015 · Penalty $4,000
Resolve - Class - 2
Temporary construction equipment on site.expired permit.noted at 10 story masonry bldg under alteration #340034331 has 8'high chain link fence erected under permit 340034215-01-eq-fn expired 11/16/2013 with
Jan 20, 2015 · Penalty $400
Resolve - Class - 2
Temporary construction requipment on site.expired permit a chain link fence has been erected under permit #fn 340034215. the fence remains up at bldg at time of inspection and the permit expired on 11-16-13.
Dec 12, 2013
Resolve - Class - 2
Failure to maintain exterior bldg east elevation observe cracks & expose rebars in parapet over(hang) vertical cracks & separating in water tank facade north & west elevation show bulging & deteriorating in wat
Jan 12, 2010
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations
Jan 7, 2010
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations
Apr 10, 2009
Resolve - Non-hazardous
84p16. (84) elevator missing floor stops up & dn,provide.
May 16, 2005 · Penalty $2,500
Resolve - Non-hazardous
Exit lighting inoperative at west and north exit door. operation of a pa without a current permit. failure to have approved pa plans available for inspection.
Mar 20, 1989 · Penalty $625
Resolve - Hazardous
Failure to have approved pa approved plans available for inspection. required means of egress obstructed. exit door light throughout inoperative.
Nov 23, 1988
Resolve