roofy

243 East 54 Street

Brooklyn, NY 11203BBL 3-04680-0056Map

Owner of record: 243 Holdings INC

243 East 54 Street is a two-family home built in 1910 in Brooklyn, 11203. It has 2 residential units across 2 floors. The owner of record is 243 Holdings INC. HPD has recorded 219 housing violations here, most recently on September 6, 2026. 42 of the 50 most recent violations are still open.

HPD violations
219
DOB violations
5
ECB violations
28
HPD complaints
300

What to know

Concern
6 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 6, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 219

  • B

    Properly repair with similar material the broken or defective motar joint and brick at building front, from 2nd story window lintel to parapet wall at northwest corner , 2nd story

    Sep 6, 2026

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling approximately 12 sq ft in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Apr 10, 2024 · Apt 1

    Open — First no access to re- inspect violation
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1, 1st story

    Apr 10, 2024 · Apt 1

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... at west wall approx 4 sq ft in the bathroom located at apt 1, 1st story, 1st apartment from north at east original violation 16830954 issued 10-apr-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Apr 10, 2024 · Apt 1

    Open — First no access to re- inspect violation
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Apr 10, 2024 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 2nd room from north at east located at apt 1, 1st story, 1st apartment from north at east

    Apr 10, 2024 · Apt 1

    Open — Nov sent out
  • A

    Refit door in the entrance located at apt 1, 1st story, 1st apartment from north at east

    Apr 10, 2024 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood door frame at entrance in the 1st room from east located at apt 1, 1st story, 1st apartment from north at east

    Apr 10, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east

    Apr 10, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and west wall in the 1st room from north at east located at apt 1, 1st story, 1st apartment from north at east

    Apr 10, 2024 · Apt 1

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Apr 10, 2024 · Apt 1

    Open — Nov sent out
  • B

    Fire egress defective. remove obstructing bars or gates from window to fire escape ... in the 2nd room from east at south located at apt 1, 1st story, 2nd apartment from north at east

    Apr 10, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair the leaky and/or defective water supply pipe at sink in the kitchen located at apt 1, 1st story, 1st apartment from east at south

    Apr 10, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at shower in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Apr 10, 2024 · Apt 1

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... at west wall approx 4 sq ft in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Apr 10, 2024 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east

    Apr 10, 2024 · Apt 1

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective wood floor in the 1st room from east at south located at apt 1, 1st story, 1st apartment from north at east

    Mar 20, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling, north and east walls in the 1st room from east at north located at apt 1, 1st story, 1st apartment from north at east

    Mar 20, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Mar 20, 2024 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east

    Mar 20, 2024 · Apt 1

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the 1st room from east at north located at apt 1, 1st story, 1st apartment from north at east

    Mar 20, 2024 · Apt 1

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the 1st room from east at north located at apt 1, 1st story, 1st apartment from north at east

    Mar 20, 2024 · Apt 1

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures in all rooms in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Mar 18, 2024 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east at south located at apt 1, 1st story, 1st apartment from north at east

    Mar 18, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 4th room from east located at apt 1, 1st story, 1st apartment from north at east

    Mar 18, 2024 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east

    Mar 18, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east

    Mar 18, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at north wall, east wall and ceiling in the 1st room from east at north located at apt 1, 1st story, 1st apartment from north at east

    Mar 18, 2024 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood door frame at west wall in the 1st room from east at north located at apt 1, 1st story, 1st apartment from north at east

    Mar 18, 2024 · Apt 1

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Mar 18, 2024 · Apt 1

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... approximately 25 sq.ft at ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from north at east

    Mar 16, 2024 · Apt 1

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from east at north located at apt 1, 2nd story, 1st apartment from north at east

    Mar 16, 2024 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from north at east

    Mar 16, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 1, 2nd story, 1st apartment from north at east

    Mar 16, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east

    Mar 16, 2024 · Apt 1

    Open — Nov sent out
  • B

    Replace the broken or defective wash basin (sink) in the bathroom located at apt 1, 2nd story, 1st apartment from north at east

    Mar 16, 2024 · Apt 1

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east

    Mar 16, 2024 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 1, 2nd story, 1st apartment from north at east

    Mar 16, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from north at east

    Mar 16, 2024 · Apt 1

    Open — Nov sent out
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires throughout in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Feb 8, 2024 · Apt 1

    Closed — Violation dismissed
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Feb 8, 2024 · Apt 1

    Open — Nov sent out
  • C

    Provide a safe and adequate supply of electric service to the fixtures at all electrical outlets and ceiling light fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Feb 8, 2024 · Apt 1

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Feb 8, 2024 · Apt 1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective broken window glass pane at vestibule door in the entrance located at apt 1, 1st story, 1st apartment from north at east

    Feb 8, 2024 · Apt 1

    Open — Nov sent out
  • C

    Replace the broken or defective cracked wash basin in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Feb 8, 2024 · Apt 1

    Closed — Violation closed
  • C

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet water closet in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Feb 8, 2024 · Apt 1

    Closed — Violation closed
  • C

    Replace the broken or defective water closet bowl in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Feb 8, 2024 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective connection at wasteline at sink in the kitchen located at apt 1, 1st story, 1st apartment from north at east

    Feb 8, 2024 · Apt 1

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Jan 18, 2024 · Apt 1

    Open — Nov sent out
  • C

    Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixture fixture bathroom and kitchen sink in the entire apartment located at apt 1, 1st story, apartment at east

    Jan 18, 2024 · Apt 1

    Closed — Violation dismissed

DOB building violations · 5

  • Construction other optional

    N1- structural stability requested at expo 1 vertical cracks, horizontal and step cracks deteriorated bricks , mortar joint and balcony columns structural stability in question.

    Jan 8, 2026

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 13, 2013

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 13, 2013

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 13, 2013

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 13, 2013

    Dob violation - active

ECB violations · 28

  • Class - 1

    - access gain to apartment 1 upon inspection observe large section of bathroom ceiling has collapsed to floor and in danger of further collapse. also observe water damage above kitchen ceiling and bedroom at re

    Jan 9, 2026 · Penalty $12,500

    Active
  • Class - 1

    Failure to maintain building in code compliant manner. at time of inspection at exposure 1(front) at 1st and 2nd floors vertical, step cracks and missing, loose mortar at bricks, cracks at balcony columns, over

    Jan 8, 2026 · Penalty $12,500

    Active
  • Class - 1

    Failure to maintain building in code compliant manner. at time of inspection observed 1st floor apartment with excessive combustible/flammable household items being stored at pathways exiting apartment. conditi

    Jun 5, 2023 · Penalty $6,250

    Active
  • Class - 2

    Failure to maintain bldg in code compliant manner. noted: at 2nd sty front fenced porch,missing mortar joints,spalling lintel & loose bricks & bricks step cracking 2nd fl left window. remedy: repair in a safe &

    Sep 24, 2014 · Penalty $5,000

    Active
  • Class - 1

    Failure to comply with the commissioner's order contained in notice of violation #35055204h issed on 5/24/14.work w/o a permit in cellar.rem:comply with the commissioner's order.

    Jul 12, 2014 · Penalty $12,000

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner.noted:missing mortarjoints,spalling lintel & loose bricks.@ 2nd story front fenced porch.rem:make repair in a safe & lawful manner.

    May 24, 2014 · Penalty $5,000

    Active
  • Class - 2

    Failure to comply w/ the comm's order to file a cert of correction w/ the dept of bldg for notice of violation #34986591x issued on 11/15/12pursuant to 28-204.4 & 1rcny 102-01.rem:file a cert of correction.

    May 24, 2014 · Penalty $8,000

    Active
  • Class - 1

    Failure to comply w/ the comm's order contained in notice of violation#34986591x issued on 11/15/12.for cellar work w/o permit.no permits have been issued to remedy the condition cited.the respondent has a hist

    May 24, 2014 · Penalty $24,000

    Active
  • Class - 1

    Failure to comply with the commissioner's order contained in notice ofviolation #34986591x issued on 11/15/12.for work w/o a permit @ cella r installed plumbing,electrical & partitions.rem:comply with commissio

    Mar 20, 2014 · Penalty $24,000

    Active
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #34986591x issued on 11/15/12. work w/o permit at cellar,installed full height partitions,plumbing,gas lines & electrical.

    Jan 21, 2014 · Penalty $24,000

    Resolve
Show 18 more ↓
  • Class - 1

    Failure to comply w/commissioner's order contained in nov#34986591x issued on 11/15/22 work w/o permit: at cellar erected and installed fullheight partitions,plumbing,gas lines & electric.occupant would not all

    Nov 12, 2013 · Penalty $12,000

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #34986591x issued on 1/15/12. @ cellar illegal plumbing/partitions. remedy: comply w/the comm's order.

    Sep 20, 2013 · Penalty $25,000

    Active
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #34986591x issued on 1/15/12. for work w/o a permit - erected partition walls,installed 3pc bathroom w/gas stove at the cellar level

    Jul 13, 2013 · Penalty $24,000

    Active
  • Class - 1

    Failure to comply w/commissioner's order contained in nov#34986591x issued on 1/15/12. (work w/o permit at cellar) rmdy: comply w/commissioner's order.

    May 17, 2013 · Penalty $24,000

    Active
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #34986591x issued on 11/15/12. (work w/o permit) remedy: comply w/the comm's order.

    Mar 20, 2013 · Penalty $24,000

    Active
  • Class - 1

    Fail to comply w/commissioner's order contained in nov#34986591x issued on 11/15/12 for work @cellar partitions;made five rooms. rem:comply w/commissioner's order.

    Jan 25, 2013 · Penalty $24,000

    Resolve
  • Class - 2

    Failure to comply w/commissioner's order to file a certificate of correction with the dob fo rnov#34986590y issued on 11/15/12 pursuant to 28-204.4 & 1rcny 102-01.2-family now used as an s.r.o.in the cellar.

    Jan 25, 2013 · Penalty $8,000

    Resolve
  • Class - 2

    Illegal use in a commercial district zoning district is c1-2. observed2 motor vehicles w/no visible license plates store in the rear and side yard of premises a "dead storage" condition not permissible in c1-2

    Nov 15, 2012 · Penalty $4,000

    Active
  • Class - 1

    Work w/o a permit. hazardous work noted: at cellar observed full 3 pc kitchen w/operable gas stove and full 3 pc bathroom partitions erectedto create separate rooms (5). remedy: make site safe. obtain permits &

    Nov 15, 2012 · Penalty $8,000

    Active
  • Class - 1

    Failure to maintain bldg in code compliant manner. observed in cellar missing fire stopping in many various areas of ceiling including but not limited to the boiler room also observed missing door knobs on

    Nov 15, 2012 · Penalty $5,000

    Active
  • Class - 1

    Occupancy contrary to that allowed by the bldg dept records. hpd records indicate premises is a 2 family dwelling. at time of inspection observed. 5 occupied sros in cellar of premises. remedy: discontinue

    Nov 15, 2012 · Penalty $12,000

    Active
  • Class - 1

    Failure to provide unobstructed exit passageway. cellar occupied as dwelling units w/5 sros has small windows w/fixed metal (bars). side andrear yards are cluttered w/various objects including but not limited

    Nov 15, 2012 · Penalty $6,000

    Active
  • Class - 2

    Failure to maintain bldg exterior walls-defect & missing mortar jointsspalled lintel and loose brick work at 2 sty front terrace/fenced,porch;front facade.remedy:make all repairs in a safe and lawful manner.

    Dec 5, 2011 · Penalty $2,500

    Active
  • Non-hazardous

    Work w/o a permit. work noted: partitions erected at cellar to create rms. plumbing lines run for kitchen sink, gas stove & 3pc bathrm (sink, toilet & stall). remedy: obtain permit or restore premises to prior

    Nov 16, 2006

    Resolve
  • Hazardous

    Residence alt for occupancy as a dwelling for more then the legally approved #of families.noted:building dept records indicate residence legally approved for occupancy by 2 families w/ cellar to be unoccupied.

    Nov 16, 2006 · Penalty $800

    Resolve
  • Hazardous

    Residence altered for occupancy as a dwelling for more than the legally approved number of families. department of building records indicates bldg as a legal (2) family dwelling. 2 family dwelling converted to

    Apr 15, 2004 · Penalty $7,000

    Resolve
  • Non-hazardous

    Work w/o a permit work noted full partition walls constructed creating(2) bedrooms kitchen with gas stove 3 piece bathroom and living room in the cellar. remedy : obtain a permit if feasible, or restore premi

    Apr 15, 2004 · Penalty $2,500

    Resolve
  • Non-hazardous

    Failure to maintain building defect is : ceiling broken and bulging inliving room at 1st floor apartment, also water leak in bathroom ceiling comming from 2nd floor apartment. remedy : make safe immediately mak

    Apr 15, 2004 · Penalty $2,500

    Resolve

Complaints

  • Unsanitary condition

    Mold

    Sep 22, 2026 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Sep 22, 2026 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Sep 22, 2026 · Apt 1

    Close
  • Electric

    Power outage

    Sep 22, 2026 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Sep 22, 2026 · Apt 1

    Close
  • Door/window

    Window frame

    Sep 22, 2026 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Sep 22, 2026 · Apt 1

    Close
  • Paint/plaster

    Wall

    Jul 23, 2026 · Apt 1

    Close
  • Electric

    No lighting

    Jul 23, 2026 · Apt 1

    Close
  • Electric

    No lighting

    May 27, 2026 · Apt 1

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    May 27, 2026 · Apt 1

    Close
  • Safety

    Smoke detector

    Apr 20, 2026 · Apt 1

    Close
  • Paint/plaster

    Wall

    Apr 20, 2026 · Apt 1

    Close
  • Door/window

    Door

    Apr 20, 2026 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Apr 20, 2026 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Apr 20, 2026 · Apt 1

    Close
  • Water leak

    Slow leak

    Apr 20, 2026 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Apr 20, 2026 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Apr 20, 2026 · Apt 1

    Close
  • Electric

    No lighting

    Apr 20, 2026 · Apt 1

    Close
  • Electric

    Outlet/switch

    Apr 20, 2026 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Apr 20, 2026 · Apt 1

    Close
  • Door/window

    Window frame

    Apr 20, 2026 · Apt 1

    Close
  • Safety

    Carbon monoxide detector

    Apr 20, 2026 · Apt 1

    Close
  • General

    Cooking gas

    Jan 6, 2026 · Apt 1

    Close
  • Electric

    Power outage

    Jan 6, 2026 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Dec 15, 2025 · Apt 1

    Close
  • Plumbing

    Toilet

    Dec 15, 2025 · Apt 1

    Close
  • Door/window

    Window frame

    Dec 15, 2025 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Dec 15, 2025 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Dec 15, 2025 · Apt 1

    Close
  • Water leak

    Slow leak

    Dec 15, 2025 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Dec 15, 2025 · Apt 1

    Close
  • Electric

    Lighting

    Dec 15, 2025 · Apt 1

    Close
  • Door/window

    Door

    Dec 15, 2025 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Dec 15, 2025 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Nov 16, 2025 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Nov 16, 2025 · Apt 1

    Close
  • Electric

    Wiring

    Nov 16, 2025 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2025 · Apt 1

    Close
  • Water leak

    Heavy flow

    Sep 9, 2024 · Apt BLDG

    Close
  • Plumbing

    Boiler

    Sep 9, 2024 · Apt BLDG

    Close
  • Electric

    Wiring

    Sep 9, 2024 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    Apr 2, 2024 · Apt 1

    Close
  • Paint/plaster

    Wall

    Apr 2, 2024 · Apt 1

    Close
  • Safety

    Fire escape

    Apr 2, 2024 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Apr 2, 2024 · Apt 1

    Close
  • Door/window

    Window pane

    Apr 2, 2024 · Apt 1

    Close
  • Door/window

    Door frame

    Apr 2, 2024 · Apt 1

    Close
  • Plumbing

    Bathtub/shower

    Apr 2, 2024 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B1)
Year built
1910
Floors
2
Residential units
2
Building area
2,280 ft²
Lot area
3,000 ft²
Zoning
R5
Community board
317
Council district
41
Block / lot
4680 / 56
Assessed value
$49,680
Landmark / historic district
No

HPD registration #814376, last renewed Jul 31, 2025.

Questions about 243 East 54 Street

Who owns 243 East 54 Street?

The owner of record in NYC Department of City Planning PLUTO data is 243 Holdings INC.

Does 243 East 54 Street have violations?

Yes. NYC HPD has recorded 219 housing violations at this property.

Is 243 East 54 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 243 East 54 Street built?

City records list 1910 as the year it was built.

How many apartments are in 243 East 54 Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.