roofy

230 East 91 Street

Brooklyn, NY 11212BBL 3-04626-0017Map

Owner of record: Myrtha Boulet

230 East 91 Street is a walk-up apartment building built in 1930 in Brooklyn, 11212. It has 3 residential units across 2 floors. The owner of record is Myrtha Boulet. HPD has recorded 88 housing violations here, most recently on August 13, 2026. 49 of the 50 most recent violations are still open.

HPD violations
88
DOB violations
0
ECB violations
0
HPD complaints
12

What to know

Concern
13 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 13, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 88

  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings [ missing notice ]

    Aug 13, 2026

    Open — Nov sent out
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Aug 13, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Aug 13, 2026

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Aug 13, 2026

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox [ missing notice ] at public hall, 1st story

    Aug 13, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 13, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor [ missing frame ] at public hall, 1st story

    Aug 13, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance , 1st story

    Aug 13, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective 1st, 2nd, and 13th wood tread from bottom at public hall stairs, 1st story

    Jun 21, 2026

    Open — Nov sent out
  • B

    Abate the nuisance consisting of pests. evidence of ants in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Jun 21, 2026 · Apt 2

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Jun 21, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Jun 21, 2026 · Apt 2

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Jun 21, 2026 · Apt 2

    Open — Notice of issuance sent to tenant
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Open — Nov sent out
  • A

    Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also heavy duty deadbolt locking device on door in the entrance located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame, 1st closet from east at south wall door frame in the 2nd private hallway located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall in the bathroom located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door in the 2nd private hallway located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at west wall in the 5th room from east at north located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, west wall, north wall, south wall in the 5th room from east at north located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 5th room from east at north located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the baseboard at west wall in the 5th room from east at north located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, south wall in the 5th room from east at north located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall, 1st radiator from north at east wall in the 1st room from east located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 2nd room from east located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, north wall in the 2nd room from east located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, south wall in the 3rd room from east at south located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door frame, 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st closet from west at north wall door in the 2nd private hallway located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at east wall, ceiling, ceiling in the bathroom located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... (less than 10 sq ft) on ceiling in the bathroom located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling in the bathroom located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinge on door in the entrance located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... (less than 10 sq ft) on ceiling in the bathroom located at apt 1floor, 1st story, 2nd apartment from south at west original violation 18506751 issued 15-dec-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Dec 15, 2025 · Apt 1FLOOR

    Open — First no access to re- inspect violation
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective spring balance at lower sash window, 1st from west at north wall in the 2nd room from east located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective spring balance at upper sash window in the kitchen located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective hinge on door at lower cabinet, east wall in the kitchen located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets continously running cold water at bathtub in the bathroom located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from east at south wall wall, 2nd closet from east at south wall door in the 1st private hallway located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall, 1st radiator from north at east wall in the 2nd room from east located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the baseboard at west wall in the 5th room from east at north located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 5th room from east at north located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st room from east located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall, 1st door from east at south wall, 1st door frame from east at south wall, south wall, 1st window frame from west at north wall in the 2nd room from east located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from west at north wall in the 2nd room from east located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 2nd closet from east at south wall door frame, 1st door frame from south at west wall in the 1st private hallway located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door in the 1st private hallway located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st door frame from south at west wall in the 3rd room from east at south located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall in the 3rd room from east at south located at apt 1floor, 1st story, 2nd apartment from south at west

    Dec 15, 2025 · Apt 1FLOOR

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Water leak

    Heavy flow

    Jun 8, 2026 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Pests

    Jun 8, 2026 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Mold

    Dec 10, 2025 · Apt 1FLOOR

    Close
  • Door/window

    Door

    Nov 24, 2025 · Apt FLOOR1

    Close
  • Unsanitary condition

    Mold

    Nov 24, 2025 · Apt FLOOR1

    Close
  • Paint/plaster

    Wall

    Nov 5, 2024 · Apt 1FL

    Close
  • Unsanitary condition

    Mold

    Nov 5, 2024 · Apt 1FL

    Close
  • Plumbing

    Water-leaks

    Jun 7, 2011 · Apt 1FL

    Close
  • Paint/plaster

    Ceiling

    Jun 7, 2011 · Apt 1FL

    Close
  • General

    Mold

    Jun 7, 2011 · Apt 1FL

    Close
Show 2 more ↓
  • General

    Mold

    Jun 7, 2011 · Apt 1FL

    Close
  • Heating

    Heat related

    Nov 2, 2010 · Apt NA

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1930
Floors
2
Residential units
3
Building area
3,360 ft²
Lot area
2,475 ft²
Zoning
R6
Community board
317
Council district
41
Block / lot
4626 / 17
Assessed value
$57,540
Landmark / historic district
No

HPD registration #364862, last renewed Jan 11, 2008.

Questions about 230 East 91 Street

Who owns 230 East 91 Street?

The owner of record in NYC Department of City Planning PLUTO data is Myrtha Boulet.

Does 230 East 91 Street have violations?

Yes. NYC HPD has recorded 88 housing violations at this property.

Is 230 East 91 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 230 East 91 Street built?

City records list 1930 as the year it was built.

How many apartments are in 230 East 91 Street?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.