58 East 52 Street
Brooklyn, NY 11203BBL 3-04605-0021Map
Owner of record: 58 E 52 St LLC
58 East 52 Street is a walk-up apartment building built in 1930 in Brooklyn, 11203. It has 6 residential units across 3 floors. The owner of record is 58 E 52 St LLC. HPD has recorded 237 housing violations here, most recently on August 10, 2026. 21 of the 50 most recent violations are still open.
- HPD violations
- 237
- DOB violations
- 28
- ECB violations
- 2
- HPD complaints
- 302
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 237
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2r, 2nd story, 1st apartment from south at west
Aug 10, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Aug 10, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door at public hall, 1st story
Aug 10, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balances at lower window sash at fire escape window in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west
Jun 23, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west
Jun 23, 2026 · Apt 2R
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective light fixture at the ceiling in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west
Jun 23, 2026 · Apt 2R
Open — Not complied with - BHazardous
Repair the leaky and/or defective water supply pipe underneath sink in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Jun 23, 2026 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west
Jun 23, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Jun 1, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the private hallway , the 1st room from east, the foyer , the 4th room from east at north, the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Jun 1, 2026 · Apt 2R
Open — Nov sent out
Show 40 more ↓
- BHazardous
Refit the door at north in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Jun 1, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west
Jun 1, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Jun 1, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2r, 2nd story, 1st apartment from south at west
Jun 1, 2026 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west
Jun 1, 2026 · Apt 2R
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2024
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
May 30, 2024
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... sign missing at public hall, 1st story
May 30, 2024
Open — Nov certified late - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 22, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 24, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2021
Closed — Violation dismissed - ANon-hazardous
Remove disused plumbing fixtures and properly seal pipe connections at north wall in at cellar
Mar 30, 2021
Closed — Violation closed - BHazardous
Replace with new the broken or defective rubber gasket at refrigerator door in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Mar 15, 2021 · Apt 2R
Open — First no access to re- inspect violation - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing, and phone # at public hall, 1st story
Dec 3, 2020
Open — Not complied with - CImmediately hazardous
Provide ready access to buildings heating system door locked at public hall, 1st story
Dec 3, 2020
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2r, 2nd story, apartment at west
Dec 3, 2020 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 2r, 2nd story, apartment at west
Dec 3, 2020 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak ceiling in the kitchen located at apt 2r, 2nd story, apartment at west
Dec 3, 2020 · Apt 2R
Closed — Violation closed - BHazardous
Replace with new the broken or defective rubber gasket refrigerator door in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Nov 6, 2020 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Nov 6, 2020 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Nov 6, 2020 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the 1st room from east at south located at apt 2r, 2nd story, 1st apartment from south at west
Nov 6, 2020 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 1st room from east at south located at apt 2r, 2nd story, 1st apartment from south at west
Nov 6, 2020 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of expose electrical wires at the north wall in the 4th room from east at south located at apt 2r, 2nd story, 1st apartment from south at west
Aug 28, 2020 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
Aug 28, 2020
Open — Not complied with - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Aug 28, 2020
Open — Not complied with - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 28, 2020
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Aug 28, 2020 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall and ceiling in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west
Aug 28, 2020 · Apt 2R
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Aug 28, 2020
Open — Not complied with - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 28, 2020
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Aug 28, 2020 · Apt 2R
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 30, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 17, 2018
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 2nd story
Jun 7, 2018
Closed — Violation closed
DOB building violations · 28
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed
Show 18 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Construction other optional
Work w/o a permit. work noted: removal of fl. at 1st. fl level and the const. of a new fl new elect. work at fls. 1-3 new plg. bathrm./kitch en at 1st,2nd, 3rd fl. levels. note bldg. contains 6 apts. and every a pt. is undergoing major renov. remedy- stop all const. work and obtain a permit before any more work can proceed
Feb 17, 1999
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Jul 17, 1991
Vp*-violation unserved ecb- dismissed
ECB violations · 2
- Class - 2
As per class 1 (b265) 28-303.7 failure to file a complete boiler inspection report as per dob records. submit a current b09 report.
May 9, 2017
Resolve - Non-hazardous
Work without a permit: work noted: removal of floor at 1st floor leveland the construction of a new floor, new electrical work at floors 1-3new plumbing, bathroom, kitchen at 1st, 2nd, and 3rd fl levels. note:
Feb 17, 1999
Resolve
Complaints
- Heat/hot water
Apartment only
May 31, 2026 · Apt 2R
Close - Water leak
Heavy flow
May 31, 2026 · Apt 2R
Close - Unsanitary condition
Mold
May 31, 2026 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
Jul 18, 2025 · Apt BLDG
Close - Door/window
Door
Aug 18, 2024 · Apt BUILDI
Close - Water leak
Slow leak
Dec 2, 2020 · Apt 2R
Close - Paint/plaster
Ceiling
Dec 2, 2020 · Apt 2R
Close - Heat/hot water
Apartment only
Dec 2, 2020 · Apt 2R
Close - Appliance
Refrigerator
Nov 1, 2020 · Apt 2R
Close - Heat/hot water
Apartment only
Nov 1, 2020 · Apt 2R
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Nov 1, 2020 · Apt 2R
Close - Heat/hot water
Apartment only
May 4, 2020 · Apt 2R
Close - Heat/hot water
Apartment only
May 4, 2020 · Apt 2R
Close - Heat/hot water
Apartment only
May 4, 2020 · Apt 2R
Close - Heat/hot water
Apartment only
Nov 13, 2019 · Apt 2R
Close - Heat/hot water
Apartment only
Nov 8, 2019 · Apt 2R
Close - Heat/hot water
Apartment only
Jan 11, 2019 · Apt 2R
Close - Heat/hot water
Entire building
Nov 11, 2016 · Apt 2R
Close - Heat/hot water
Entire building
Nov 5, 2016 · Apt 1F
Close - Plumbing
Water supply
Mar 5, 2015 · Apt 2R
Close - Plumbing
Water supply
Mar 5, 2015 · Apt 2R
Close - Heat/hot water
Entire building
Mar 5, 2015 · Apt 2R
Close - General
Cooking gas
Mar 5, 2015 · Apt 2R
Close - Water leak
Slow leak
Mar 5, 2015 · Apt 2R
Close - General
Bell/buzzer/intercom
Mar 5, 2015 · Apt 2R
Close - Paint/plaster
Ceiling
Mar 5, 2015 · Apt 2R
Close - Flooring/stairs
Floor
Mar 4, 2015 · Apt 1F
Close - Unsanitary condition
Pests
Mar 4, 2015 · Apt 1F
Close - Unsanitary condition
Pests
Mar 4, 2015 · Apt 1F
Close - Flooring/stairs
Floor
Mar 4, 2015 · Apt 1F
Close - Plumbing
Basin/sink
Mar 4, 2015 · Apt 1F
Close - Paint/plaster
Ceiling
Mar 4, 2015 · Apt 1F
Close - Heat/hot water
Apartment only
Mar 4, 2015 · Apt 1F
Close - Heat/hot water
Apartment only
Feb 10, 2015 · Apt 1F
Close - Heat/hot water
Entire building
Feb 2, 2015 · Apt 1F
Close - Paint/plaster
Wall
Feb 1, 2015 · Apt 1F
Close - General
Bell/buzzer/intercom
Feb 1, 2015 · Apt 1F
Close - Heat/hot water
Entire building
Feb 1, 2015 · Apt 1F
Close - Water leak
Slow leak
Feb 1, 2015 · Apt 1F
Close - Unsanitary condition
Pests
Feb 1, 2015 · Apt 1F
Close - Unsanitary condition
Pests
Feb 1, 2015 · Apt 1F
Close - Unsanitary condition
Garbage/recycling storage
Feb 1, 2015 · Apt 1F
Close - Paint/plaster
Ceiling
Feb 1, 2015 · Apt 1F
Close - Water leak
Heavy flow
Aug 19, 2014 · Apt 2R
Close - Electric
Lighting
Aug 19, 2014 · Apt 2R
Close - General
Bell/buzzer/intercom
Aug 19, 2014 · Apt 2R
Close - Paint/plaster
Ceiling
Aug 19, 2014 · Apt 2R
Close - General
Bell/buzzer/intercom
Aug 13, 2014 · Apt 2R
Close - Electric
Lighting
Aug 13, 2014 · Apt 2R
Close - Water leak
Heavy flow
Aug 13, 2014 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1930
- Floors
- 3
- Residential units
- 6
- Building area
- 5,694 ft²
- Lot area
- 3,000 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 41
- Block / lot
- 4605 / 21
- Assessed value
- $406,350
- Landmark / historic district
- No
HPD registration #351085, last renewed Feb 26, 2026.
Questions about 58 East 52 Street
Who owns 58 East 52 Street?
The owner of record in NYC Department of City Planning PLUTO data is 58 E 52 St LLC.
Does 58 East 52 Street have violations?
Yes. NYC HPD has recorded 237 housing violations at this property.
Is 58 East 52 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 58 East 52 Street built?
City records list 1930 as the year it was built.
How many apartments are in 58 East 52 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.