HPD housing violations
No HPD violations on record
DOB building violations
The newest 50 of 198 DOB violations. The city keeps the complete history.
- High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - Construction other optional
Failure to maintain building in a code compliant manner. observed missing crack glass panels in multiple location at muliple level of all exposure. damage weathered window frames. remedy: repair and or replace
Apr 22, 2025
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Construction other optional
Failure to maintain building in code compliant manner. note: at time of inspection observed missing/cracked glass panels in multiple locations on multiple facade at all exposures observed damaged window frames at all facades remedy: repair and/or replace
Oct 30, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - Construction other optional
Failure to maintain building in code compliant manner.observed broken/ missing/glass pane at exp1,2,& 4 with defected window frames.roof area :damaged parapet wall.open joints.damaged facade at m/c room with step cracks at sky light.remedy:repair and/or replace
Jun 3, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2022
Apr 22, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - active - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active
ECB violations
44 ECB violations, newest first.
- Class - 2
Temp equipment onsite (sws)-expired permit.observed sws still up@exp1,2,3 temp const equipment requires permit@all times to remain installed.permit340332946-01-eq-sh on bis system expired1/14/22.renew permit.
Apr 19, 2022 · Penalty $3,125
Resolve - Class - 1
Upon inspection device was found out of service. restore to service immediately and contact nycdob at [email protected] for a complete inspection.
Mar 8, 2022 · Penalty $6,250
Active - Class - 2
Failure to file acceptable amended cycle 7c & 8c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#809938. agg1: prior nov#37019109y under 28
Oct 8, 2021 · Penalty $10,000
Active - Class - 2
Failure to file acceptable amended cycle 7c and 8c report indicating correction of unsafe conditions described in initial facade report required by 28-302.5 for control#809938.agg1:prior nov37012232h under 28-3
Jun 3, 2020 · Penalty $3,125
Active - Class - 2
Failure to comply w/ commissioner's order contained in summons/violation#35265284m issued on 1/11/18, and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certifica
Nov 20, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to file acceptable amended cycle 8c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control # 809938. remedy: file acceptable report.
Aug 1, 2018 · Penalty $1,250
Active - Class - 2
Failure to maintain exterior building facade and appurtenances.note:@ the time of inspection observe east elevation exposure #4(courtyard area)crack/chipping/spalling bricks on 9th/10th fl @ several location @
Jan 11, 2018 · Penalty $500
Active - Class - 2
Failure to file annual certification that cooling tower 1000003251 has been inspected,tested & disinfected & that a maintenance plan has been developed & implemented by 11/1/2016. rem: file annual certification
Jun 20, 2017
Resolve - Class - 2
Failure to file acceptable amended report indicating correction of unsafe conditions described in initial local law 11/98 report. agg1 priornov 36027734n under 28-302.5. remedy: file acceptable amended report.
Nov 7, 2016
Resolve - Class - 2
Failure to maintain facade and appurtenances. noted: at east and west exposures cracked, broken and dislodged brickwork was observed, especially at 2 brick thick decorative ribs running vertically.rmdy:maintain
Oct 31, 2015 · Penalty $250
Active - Class - 2
Removal of safety measures w/o dept approval. noted: at facade at westand east exposures cracked,broken and loose brickwork masonry was observed.at time of inspection facade is declared as "unsafe" requiring sa
Oct 31, 2015 · Penalty $400
Active - Class - 2
Failure to file an acceptable amended cycle 7 report to this dept indicating correction of unsafe conditions described in initial local law fisp report. remedy: file an amended report following remedial repair
May 29, 2015 · Penalty $4,000
Active - Class - 1
97l10 car on finals. troubleshoot throughout,make repairs if needed.
Mar 2, 2015 · Penalty $1,000
Resolve - Class - 2
Failure to provide approved/accepted plans @ jobsite,@ time of insp.premises under p.c altii 320815463,l.o.c folder.permit exp 05/01/15.note:application filed for facade repair.no plans presented @ time for ins
Feb 10, 2015
Resolve - Class - 2
61g07,39x10,40i10,23x10,100i10,12l10,67m07,40r09,16l10,37m07,100b10. 61g-provide proper fuse in teh mainline; 39x-repair run box on top fo the car; 40i-repair m.r. floor; 23x-repair light;100i-repair damaged
Dec 23, 2014 · Penalty $500
Active - Class - 2
Failure to file an acceptable amended cycle 7 report to this dept indicating correction of unsafe condition described in initial local law fisp report.rem:file an amended report following remedial repairs of th
Nov 28, 2014 · Penalty $4,000
Active - Class - 2
Electrical work w/o a permit. new electrical work consist of 2 feeders2 panels,branch circuits,fixtures sw's and outlets: 1st flr clinic e. rmdy: obtain a permit.
Jul 16, 2013 · Penalty $2,000
Resolve - Hazardous
Failure to maintain.defects are 1-loose mortar was observed on south exterior wall between 9fl & 10fl.2-loose mortar was observed on southwest corner of exterior wall above 10fl.remedy:repair all defect & provi
Mar 30, 2007 · Penalty $800
Resolve - Non-hazardous
46h12.
Oct 15, 1999 · Penalty $500
Resolve - Non-hazardous
36i11. -36 motor room door falling off hingers.
Oct 15, 1999 · Penalty $500
Resolve - Non-hazardous
75u.
Oct 29, 1996 · Penalty $1,000
Resolve - Non-hazardous
75u.
Oct 29, 1996 · Penalty $1,000
Resolve - Non-hazardous
75u.
Oct 29, 1996 · Penalty $1,000
Resolve - Non-hazardous
75u.
Oct 29, 1996 · Penalty $1,000
Resolve - Non-hazardous
40h,. (renew governor rope)
Oct 31, 1995 · Penalty $200
Resolve - Non-hazardous
39r,. work concucted without permit file "bn" for installation of new traction sheave test must be conducted in resence of a n.y.c. elevator inspector.
Oct 31, 1995 · Penalty $350
Resolve - Non-hazardous
39 - work conducted without permit file "bn" for installation of new traction sheave. test must be conducted in presence of a n.y.c. elevator inspector.
Oct 31, 1995 · Penalty $350
Resolve - Non-hazardous
54m,36d. 54-provice city #device tag. 36-repair door & mount properly make self closing & self locking..
Jan 18, 1995 · Penalty $100
Resolve - Non-hazardous
54-provide city device tag nubmers.
Jan 18, 1995 · Penalty $100
Resolve - Non-hazardous
47h.,54m. 47 renew governor cable. 54 provide city id#.
Jan 18, 1995 · Penalty $100
Resolve - Non-hazardous
39r,46h. file "bn " for mew sheave installatin. 46-renew hoist cable.____________________________________________________________________________________________________________________________________________
Jan 18, 1995 · Penalty $100
Resolve - Non-hazardous
47h. 47-renew governor cable.
Jan 18, 1995 · Penalty $100
Resolve - Non-hazardous
39r. 39- file "bn" with this department for new sheve installation. ____________________________________________________________________________________________________________________________________________
Jan 18, 1995
Resolve - Non-hazardous
73x,return ele to service.
May 5, 1992 · Penalty $75
Resolve - Non-hazardous
09h,16h,73m,(73)five year test. proper tag&file elv3 form
Jul 17, 1991
Resolve - Non-hazardous
09h,16h,73m,(73)five year test. proper tag&file elv3 form
Jul 17, 1991
Resolve - Non-hazardous
09h,16h,55x,73m,(73)five year test. proper tag&file elv3 form
Jul 17, 1991
Resolve - Non-hazardous
09h,16h,73m,(73)five year test. proper tag&file elv3 form
Jul 17, 1991
Resolve - Non-hazardous
09h,16h,73m,(73)five year test. proper tag&file elv3 form
Jul 17, 1991
Resolve - Non-hazardous
09h,14m,73m,(73)five year test. proper tag&file elv3 form
Jul 17, 1991
Resolve - Non-hazardous
Operation of a public assembly without a current permit. remedy - obtain and post p.a. permit for cefeteria/dining hall (p.a. 26/76)
Nov 23, 1990 · Penalty $55
Resolve - Hazardous
Operation of a crane without a certificate of on site inspection obtain on site inspection.
Aug 8, 1990 · Penalty $1,150
Resolve - Hazardous
Operation of a crane wihtout a c of o on site inspection. obtain on site inspection
Aug 8, 1990 · Penalty $1,150
Resolve - Non-hazardous
Pa contrary to approved plans. operation of a pa without a current permit.
Mar 16, 1989 · Penalty $535
Active