roofy

Violations at 86 East 94 Street

Brooklyn, NY 11212 · BBL 3-04596-0043 · Back to the property

HPD housing violations

The newest 50 of 282 HPD violations. The city keeps the complete history.

  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1g, 4th story, 2nd apartment from south at west

    Jun 25, 2026 · Apt 1G

    Closed — Violation dismissed
  • BHazardous

    Repair the roof so that it will not leak ceiling under roof in the 3rd room from east located at apt 1g, 4th story, 2nd apartment from south at west

    Jun 11, 2025 · Apt 1G

    Closed — Violation dismissed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 1g, 4th story, 2nd apartment from south at west

    Jun 11, 2025 · Apt 1G

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective fixtures at ceiling in the 3rd room from east located at apt 1g, 4th story, 2nd apartment from south at west

    Jun 11, 2025 · Apt 1G

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective defective hinges at public hall, 1st story

    Apr 15, 2025

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 4th story, 1st apartment from south at west

    Mar 11, 2025 · Apt 2D

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 2nd apartment from south at west , section at north

    Mar 11, 2025 · Apt 3C

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3g, 4th story, 1st apartment from east at south

    Mar 11, 2025 · Apt 3G

    Open — Not complied with
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 3c, 3rd story, 2nd apartment from south at west , section at north

    Dec 16, 2024 · Apt 3C

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 3c, 3rd story, 2nd apartment from south at west , section at north

    Dec 16, 2024 · Apt 3C

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north at west located at apt 3c, 3rd story, 2nd apartment from south at west , section at north

    Dec 16, 2024 · Apt 3C

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 2nd apartment from south at west , section at north

    Dec 16, 2024 · Apt 3C

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective lockset at door in the bathroom located at apt 3c, 3rd story, 2nd apartment from south at west , section at north

    Dec 16, 2024 · Apt 3C

    Closed — Violation closed
  • ANon-hazardous

    Refit the door in the entrance located at apt 3c, 3rd story, 2nd apartment from south at west , section at north

    Dec 16, 2024 · Apt 3C

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from north at west located at apt 3c, 3rd story, 2nd apartment from south at west , section at north

    Dec 16, 2024 · Apt 3C

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3e, 2nd story, 1st apartment from east at south

    Nov 13, 2024 · Apt 3E

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchen located at apt 3e, 2nd story, 1st apartment from east at south

    Nov 13, 2024 · Apt 3E

    Closed — Violation closed
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at wall cabinet west wall in the kitchen located at apt 3e, 2nd story, 1st apartment from east at south

    Nov 13, 2024 · Apt 3E

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 3e, 2nd story, 1st apartment from east at south

    Nov 12, 2024 · Apt 3E

    Closed — Violation closed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of two protruding nails coming out from hinges on door in the entrance located at apt 3e, 2nd story, 1st apartment from east at south

    Nov 12, 2024 · Apt 3E

    Closed — Violation dismissed
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... (less than 10 sq ft) on west wall in the kitchen located at apt 3e, 2nd story, 1st apartment from east at south

    Nov 12, 2024 · Apt 3E

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at west wall in the kitchen located at apt 3e, 2nd story, 1st apartment from east at south

    Nov 12, 2024 · Apt 3E

    Closed — Violation dismissed
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10 sqf at west wall in the kitchen located at apt 3e, 2nd story, 2nd apartment from west at north

    Oct 9, 2024 · Apt 3E

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of rodents at west yard evidance of rat dropping

    Sep 16, 2024

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt, 4th story, 2nd apartment from south at west

    Sep 16, 2024

    Closed — Violation dismissed
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes house hold items at 4th story balcony at south firescape

    Sep 16, 2024

    Closed — Violation dismissed
  • BHazardous

    Trace and repair the source and abate the visible mold condition... less than 10 sqft ''8'' sqft at west wall in the kitchen located at apt 3e, 2nd story, 1st apartment from east at south original violation 17272774 issued 12-sep-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Sep 12, 2024 · Apt 3E

    Closed — Violation closed
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 4; in the entire apartment located at apt 3e, 2nd story, 1st apartment from east at south

    Sep 12, 2024 · Apt 3E

    Closed — Violation dismissed
  • BHazardous

    Remove all obstructions and repair all defects in bathtub wast line in the bathroom located at apt 3e, 2nd story, 1st apartment from east at south

    Sep 12, 2024 · Apt 3E

    Closed — Violation dismissed
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10 sqft ''8'' sqft at west wall in the kitchen located at apt 3e, 2nd story, 1st apartment from east at south

    Sep 12, 2024 · Apt 3E

    Closed — Violation closed
  • CImmediately hazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1g, 4th story, 2nd apartment from south at west

    Aug 26, 2024 · Apt 1G

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective door in the 3rd room from east located at apt 1g, 4th story, 2nd apartment from south at west

    Aug 26, 2024 · Apt 1G

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective washbasin cabinet in the bathroom located at apt 1g, 4th story, 2nd apartment from south at west

    Aug 26, 2024 · Apt 1G

    Closed — Violation dismissed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st closet from south at west wall door frame in the foyer located at apt 1g, 4th story, 2nd apartment from south at west

    Aug 26, 2024 · Apt 1G

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 2nd room from east at south located at apt 1g, 4th story, 2nd apartment from south at west

    Aug 26, 2024 · Apt 1G

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame in the private hallway located at apt 1g, 4th story, 2nd apartment from south at west

    Aug 26, 2024 · Apt 1G

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st door frame from north at east wall in the 3rd room from east located at apt 1g, 4th story, 2nd apartment from south at west

    Aug 26, 2024 · Apt 1G

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the kitchen located at apt 1g, 4th story, 2nd apartment from south at west

    Aug 26, 2024 · Apt 1G

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the bathroom located at apt 1g, 4th story, 2nd apartment from south at west

    Aug 26, 2024 · Apt 1G

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of rodents rats at center yard

    Aug 26, 2024

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges on door at public hall bulkhead to roof (north section)

    Aug 26, 2024

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges on door at public hall bulkhead to roof (south section)

    Aug 26, 2024

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective rubber gasket on door at refrigerator in the kitchen located at apt 1g, 4th story, 2nd apartment from south at west

    Aug 26, 2024 · Apt 1G

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective connection wasteline under washbasin in the bathroom located at apt 1g, 4th story, 2nd apartment from south at west

    Aug 26, 2024 · Apt 1G

    Closed — Violation dismissed
  • CImmediately hazardous

    Properly repair with similar material the broken or defective ceramic tiles at floor adjacent bathtub and washbasin in the bathroom located at apt 1g, 4th story, 2nd apartment from south at west

    Aug 26, 2024 · Apt 1G

    Closed — Violation closed
  • BHazardous

    Replace the broken or defective washbasin in the bathroom located at apt 1g, 4th story, 2nd apartment from south at west

    Aug 26, 2024 · Apt 1G

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide adequate supply of cold water for the fixtures at washbasin and bathtub in the bathroom located at apt 1g, 4th story, 2nd apartment from south at west

    Aug 26, 2024 · Apt 1G

    Closed — Violation closed
  • CImmediately hazardous

    Provide adequate supply of hot water for the fixtures at washbasin and bathtub in the bathroom located at apt 1g, 4th story, 2nd apartment from south at west

    Aug 26, 2024 · Apt 1G

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective knob assembly on door in the bathroom located at apt 1g, 4th story, 2nd apartment from south at west

    Aug 26, 2024 · Apt 1G

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective electrical outlet at west wall in the 3rd room from east located at apt 1g, 4th story, 2nd apartment from south at west

    Aug 26, 2024 · Apt 1G

    Closed — Violation dismissed

DOB building violations

1 DOB violations, newest first.

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed

ECB violations

1 ECB violations, newest first.

  • Non-hazardous

    Failure to maintain .noted at cellar north west area gas storage room 3 fl. joinsts 3'x10' are rotten at ends have come off sill & out of pockets.at court yard pile of concrete debrid is approx.4 ft height

    Oct 24, 2003 · Penalty $350

    Resolve