228 Linden Boulevard
Brooklyn, NY 11208BBL 3-04482-0018Map
Owner of record: 228 Holly Street Corp
228 Linden Boulevard is a store building built in 1950 in Brooklyn, 11208. It has 2 residential units across 2 floors. The owner of record is 228 Holly Street Corp. HPD has recorded 20 housing violations here, most recently on October 28, 2025. 20 of the 20 most recent violations are still open.
- HPD violations
- 20
- DOB violations
- 18
- ECB violations
- 5
- HPD complaints
- 69
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 20
- CImmediately hazardous
Properly repair or replace the broken or defective glass pane at lower sash window in the 2nd room from east at north located at apt 2, 3rd story, 2nd apartment from west at north
Oct 28, 2025 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 3rd story, 2nd apartment from west at north
Oct 28, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 3rd story, 2nd apartment from west at north
Oct 28, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles. in the kitchen located at apt 2a, 2nd story
Nov 15, 2013 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the entire apartment located at apt 2a, 2nd story
Nov 15, 2013 · Apt 2A
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 12, 2008
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls & ceiling south east room, 2nd story apt. #02.
Jul 2, 2005
Open — Nov sent out - BHazardous
Properly repair the broken or defective wood floor southeast room, 2nd story south apt 2.
Jul 19, 2004
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets sink kitchen 2nd story apt. #02.
Jul 19, 2004
Open — Nov sent out - ANon-hazardous
Abate the nuisance consisting of mildew walls & ceiling bathroom & northeast room, 2nd story apt. #02.
Jul 19, 2004
Open — Nov sent out
Show 10 more ↓
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls & ceiling throughout 2nd story apt. #02.
Jul 19, 2004
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls & ceiling throughout 2nd story apt. #02.
Jul 19, 2004
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures kitchen & bathroom 2nd story apt. #02.
Jul 19, 2004
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over skylight at bathroom, 2nd story south apt 2. er1
Jul 19, 2004
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over west room ceiling, 2nd story south apt 2. er1
Jul 19, 2004
Open — Nov sent out - ANon-hazardous
Repair leaky water closet flush pipe connection bathroom, 2nd story south apt 2.
Jul 19, 2004
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings and walls throughout 2nd story south apt 2.
Jul 19, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color wall around entrance door to 2nd story south apt 2.
Jul 19, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice and roaches, throughout 2nd story south apt 2.
Jul 19, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color north wall under kitchen sink, 2nd story south apt 2.
Jul 19, 2004
Open — Nov sent out
DOB building violations · 18
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active
Show 8 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Construction other optional
C-construction other optional
Mar 15, 2001
Dob violation - active - Construction other optional
Work without a permit. work noted: removal and rearangement of parti- tion stairs, removal of partition walls at 1st floor center, around interior stairs suggested remedy: obtain a permit or restore the premises to prior legal condition
Mar 15, 2001
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active
ECB violations · 5
- Class - 1
Observed wire for lights switch location behind counter hanging from drop ceiling. no permit on record for this work., obtain permit
Jun 4, 2026 · Penalty $12,500
Active - Class - 1
Observed sections of ceiling with water damage at cellar level of commercial space inside boiler room and out of boiler room. also observe exterior awning state with several torn sections of fabric., repair and
Jun 4, 2026 · Penalty $12,500
Active - Class - 1
Observed 20 lb. propane tank store behind counter and small kerosene tank also, behind counter. not property stored, maintain storage in compliance with fire code
Jun 4, 2026 · Penalty $12,500
Active - Non-hazardous
Failure to maintain building interior.defect are.broken and missing fire retarden plasted at cellar ceiling and partition walls at first and second floor at various locations.suggested remedy:repair the defecti
Mar 15, 2001 · Penalty $180
Active - Non-hazardous
Work without a permit:work noted removeal and rearranged of portion of stairs.removal of partitions walls at first floor center, around interior stairs.suggested remedy:obtain a permit or restore the premises
Mar 15, 2001
Resolve
Complaints
- Unsanitary condition
Pests
Sep 18, 2026 · Apt 2
Open - Unsanitary condition
Pests
Aug 9, 2026 · Apt 2
Close - Unsanitary condition
Pests
May 19, 2026 · Apt 2
Close - Unsanitary condition
Pests
May 19, 2026 · Apt 2
Close - Heat/hot water
Entire building
Nov 24, 2025 · Apt 2
Close - Unsanitary condition
Pests
Oct 25, 2025 · Apt 2
Close - Paint/plaster
Wall
Oct 25, 2025 · Apt 2
Close - Paint/plaster
Wall
Oct 25, 2025 · Apt 2
Close - Door/window
Window pane
Oct 25, 2025 · Apt 2
Close - Unsanitary condition
Pests
Jul 28, 2023 · Apt 2
Close
Show 40 more ↓
- Unsanitary condition
Pests
Jan 23, 2023 · Apt 2
Close - Unsanitary condition
Pests
Dec 17, 2022 · Apt 2
Close - Electric
Power outage
Jan 31, 2022 · Apt 2
Close - Water leak
Slow leak
Dec 19, 2020 · Apt 2
Close - Outside building
Pavement
Jun 23, 2020 · Apt 2
Close - Electric
Outlet/switch
Jul 21, 2019 · Apt 2F
Close - Heating
Heat related
Jan 16, 2014 · Apt 2
Close - Paint/plaster
Ceiling
Nov 12, 2013 · Apt 2A
Close - Paint/plaster
Wall
Nov 12, 2013 · Apt 2A
Close - Appliance
Refrigerator
Nov 12, 2013 · Apt 2A
Close - Plumbing
Water-leaks
Nov 12, 2013 · Apt 2A
Close - Paint/plaster
Ceiling
Nov 12, 2013 · Apt 2A
Close - General
Floor
Nov 12, 2013 · Apt 2A
Close - Paint/plaster
Wall
Nov 12, 2013 · Apt 2A
Close - Plumbing
Radiator
Nov 12, 2013 · Apt 2A
Close - Heating
Heat related
Nov 12, 2013 · Apt 2A
Close - General
Mold
Nov 12, 2013 · Apt 2A
Close - Plumbing
Water-leaks
Oct 30, 2013 · Apt 2A
Close - Heating
Heat related
Oct 30, 2013 · Apt 2A
Close - General
Floor
Oct 30, 2013 · Apt 2A
Close - Plumbing
Basin/sink
Oct 30, 2013 · Apt 2A
Close - Paint/plaster
Wall
Oct 30, 2013 · Apt 2A
Close - Plumbing
Water-leaks
Oct 30, 2013 · Apt 2A
Close - General
Floor
Oct 30, 2013 · Apt 2A
Close - Plumbing
Water-leaks
Oct 30, 2013 · Apt 2A
Close - Paint/plaster
Wall
Oct 30, 2013 · Apt 2A
Close - Paint/plaster
Wall
Oct 30, 2013 · Apt 2A
Close - General
Mold
Oct 30, 2013 · Apt 2A
Close - Paint/plaster
Wall
Oct 11, 2013 · Apt 2A
Close - General
Mold
Oct 11, 2013 · Apt 2A
Close - Plumbing
Water-leaks
Oct 11, 2013 · Apt 2A
Close - General
Floor
Oct 11, 2013 · Apt 2A
Close - Paint/plaster
Wall
Oct 11, 2013 · Apt 2A
Close - Paint/plaster
Wall
Oct 11, 2013 · Apt 2A
Close - Paint/plaster
Ceiling
Oct 11, 2013 · Apt 2A
Close - Paint/plaster
Ceiling
Oct 11, 2013 · Apt 2A
Close - Paint/plaster
Ceiling
Oct 11, 2013 · Apt 2A
Close - Plumbing
Water-leaks
Jul 8, 2013 · Apt 2A
Close - General
Mold
Jul 8, 2013 · Apt 2A
Close - Paint/plaster
Wall
Jul 8, 2013 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K4)
- Year built
- 1950
- Floors
- 2
- Residential units
- 2
- Building area
- 3,789 ft²
- Lot area
- 8,120 ft²
- Zoning
- M1-1
- Community board
- 305
- Council district
- 42
- Block / lot
- 4482 / 18
- Assessed value
- $190,800
- Landmark / historic district
- No
Questions about 228 Linden Boulevard
Who owns 228 Linden Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 228 Holly Street Corp.
Does 228 Linden Boulevard have violations?
Yes. NYC HPD has recorded 20 housing violations at this property.
Is 228 Linden Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 228 Linden Boulevard built?
City records list 1950 as the year it was built.
How many apartments are in 228 Linden Boulevard?
It has 2 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.