Violations at 1080 Barbey Street
Brooklyn, NY 11207 · BBL 3-04421-0019 · Back to the property
HPD housing violations
12 HPD violations, newest first.
- CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at cellar apt cellar
Feb 14, 2016 · Apt CELLAR
Closed — Violation dismissed - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible stove in the entire apartment located at cellar apt cellar
Feb 14, 2016 · Apt CELLAR
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections class ''a'' apartment created at cellar in the entire apartment located at cellar apt cellar
Feb 14, 2016 · Apt CELLAR
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double-cylinder key operated lock installed at iron door at entrance to building located at apt 2ndfl, 2nd story
May 27, 2014 · Apt 2NDFL
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at sink in the kitchen located at apt 2ndfl, 2nd story
May 27, 2014 · Apt 2NDFL
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in waste line at wash basin in the bathroom, upper level, located at apt 2ndfl, 2nd story
May 27, 2014 · Apt 2NDFL
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures located at apt 2ndfl, 2nd story
May 27, 2014 · Apt 2NDFL
Open — Nov sent out - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the dried sewage at cellar throughout
May 27, 2014
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story
Feb 18, 2014 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from east located at apt 2 upper level, 2nd story
Feb 18, 2014 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures bathroom and in the kitchen located at apt 2, 2nd story
Feb 18, 2014 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story
Feb 18, 2014 · Apt 2
Closed — Violation dismissed
DOB building violations
No DOB violations on record
ECB violations
1 ECB violations, newest first.
- Class - 2
Occupancy contrary to that allowed by c of o and dept of bldgs recordspartitions erected creating illegal use of rooms for living in cellar unlawful gas range. also full bathroom completed with water-closet was
Feb 14, 2016 · Penalty $1,200
Active