roofy

Violations at 829 Schenck Avenue

Brooklyn, NY 11207 · BBL 3-04355-0001 · Back to the property

HPD housing violations

The newest 50 of 755 HPD violations. The city keeps the complete history.

  • BHazardous

    Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 4c, 4th story, 1st apartment from west at north

    Oct 28, 2026 · Apt 4C

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchen located at apt 4c, 4th story, 1st apartment from west at north

    Oct 28, 2026 · Apt 4C

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north

    Oct 28, 2026 · Apt 4C

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north

    Oct 28, 2026 · Apt 4C

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 5g, 5th story, 1st apartment from north at east

    Oct 27, 2026 · Apt 5G

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department ,all walls and ceiling in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north

    Sep 18, 2026 · Apt 4C

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules ,missing in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north

    Sep 18, 2026 · Apt 4C

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations ,missing in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north

    Sep 18, 2026 · Apt 4C

    Open — Nov sent out
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north

    Sep 18, 2026 · Apt 4C

    Open — Nov sent out
  • BHazardous

    Replace with new the missing entrance door in the 1st room from north at west located at apt 4c, 4th story, 1st apartment from west at north

    Sep 18, 2026 · Apt 4C

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north

    Sep 18, 2026 · Apt 4C

    Open — Notice of issuance sent to tenant
  • BHazardous

    Properly secure the loose ,west electrical wall outlet in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north

    Sep 18, 2026 · Apt 4C

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north

    Sep 18, 2026 · Apt 4C

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Properly repair or replace the broken or defective heavy dutylock at building entrance door , 1st story

    Sep 8, 2026

    Open — Nov certified on time
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance , 1st story

    Sep 7, 2026

    Closed — Violation closed
  • BHazardous

    Abate the infestation consisting of bedbugs in the entire apartment located at apt 3b, 3rd story, 2nd apartment from south at west , section ''842''

    Sep 7, 2026 · Apt 3B

    Open — Civ14 mailed
  • CImmediately hazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 11b, 11th story, 3rd apartment from north at east

    Aug 31, 2026 · Apt 11B

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from south at west wall door frame, 1st door frame from west at north wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 3rd room from north at west located at apt 11b, 11th story, 3rd apartment from north at east

    Aug 31, 2026 · Apt 11B

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from west at north wall door frame in the 3rd room from north at east located at apt 11b, 11th story, 3rd apartment from north at east

    Aug 31, 2026 · Apt 11B

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall in the bathroom located at apt 11b, 11th story, 3rd apartment from north at east

    Aug 31, 2026 · Apt 11B

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the kitchen located at apt 11b, 11th story, 3rd apartment from north at east

    Aug 31, 2026 · Apt 11B

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from east at south wall door frame, 1st closet from north at east wall door frame in the foyer located at apt 11b, 11th story, 3rd apartment from north at east

    Aug 31, 2026 · Apt 11B

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the private hallway located at apt 11b, 11th story, 3rd apartment from north at east

    Aug 31, 2026 · Apt 11B

    Open — Nov sent out
  • BHazardous

    Properly repair and abate unsafe electric wiring condition consisting of exposed electric wires at ceiling in the 1st room from north located at apt 11b, 11th story, 3rd apartment from north at east

    Aug 31, 2026 · Apt 11B

    Open — Civ14 mailed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 11b, 11th story, 3rd apartment from north at east

    Aug 31, 2026 · Apt 11B

    Open — Not complied with
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall, north wall, 1st closet from south at west wall door, south wall in the 3rd room from north at west located at apt 11b, 11th story, 3rd apartment from north at east

    Aug 31, 2026 · Apt 11B

    Open — Nov sent out
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 3rd room from north at west located at apt 11b, 11th story, 3rd apartment from north at east

    Aug 31, 2026 · Apt 11B

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at 1st door frame from south at west wall, 1st window frame from north at east wall, 1st radiator from north at east wall, 1st closet from west at north wall door, north wall, east wall, west wall in the 3rd room from north at east located at apt 11b, 11th story, 3rd apartment from north at east

    Aug 31, 2026 · Apt 11B

    Open — Nov sent out
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the 1st door frame from south at west wall, 1st window frame from north at east wall, 1st radiator from north at east wall in the 3rd room from north at east located at apt 11b, 11th story, 3rd apartment from north at east

    Aug 31, 2026 · Apt 11B

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at 1st door from south at west wall, ceiling in the bathroom located at apt 11b, 11th story, 3rd apartment from north at east

    Aug 31, 2026 · Apt 11B

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at west wall, east wall, north wall, south wall, 1st closet from west at north wall door, 1st closet from north at east wall door, 1st closet from east at south wall door in the foyer located at apt 11b, 11th story, 3rd apartment from north at east

    Aug 31, 2026 · Apt 11B

    Open — Nov sent out
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the 1st door from south at west wall, 1st door frame from south at west wall, 1st closet from west at north wall door frame in the foyer located at apt 11b, 11th story, 3rd apartment from north at east

    Aug 31, 2026 · Apt 11B

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at east wall in the kitchen located at apt 11b, 11th story, 3rd apartment from north at east

    Aug 31, 2026 · Apt 11B

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of pests. evidence of house flies in the entire apartment located at apt 8g, 8th story, 1st apartment from north at east

    Aug 25, 2026 · Apt 8G

    Open — Civ14 mailed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from north at east located at apt 8g, 8th story, 1st apartment from north at east

    Aug 25, 2026 · Apt 8G

    Open — Civ14 mailed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north

    Aug 12, 2026 · Apt 4C

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north

    Aug 12, 2026 · Apt 4C

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 1st room from north, the 4th room from north located at apt 4c, 4th story, 1st apartment from west at north

    Jul 27, 2026 · Apt 4C

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 4c, 4th story, 1st apartment from west at north

    Jul 27, 2026 · Apt 4C

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective door at entrance in the bathroom located at apt 4c, 4th story, 1st apartment from west at north

    Jul 27, 2026 · Apt 4C

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north

    Jul 27, 2026 · Apt 4C

    Open — Notice of issuance sent to tenant
  • BHazardous

    Properly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchen located at apt 4c, 4th story, 1st apartment from west at north

    Jul 27, 2026 · Apt 4C

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north

    Jul 27, 2026 · Apt 4C

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north

    Jun 10, 2026 · Apt 4C

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north

    Jun 10, 2026 · Apt 4C

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroom located at apt 4c, 4th story, 1st apartment from west at north

    Jun 10, 2026 · Apt 4C

    Closed — Violation dismissed
  • ANon-hazardous

    Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroom located at apt 4c, 4th story, 1st apartment from west at north

    Jun 10, 2026 · Apt 4C

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 4c, 4th story, 1st apartment from east at south

    May 18, 2026 · Apt 4C

    Open — Violation will be reinspected
  • ANon-hazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4c, 4th story, 1st apartment from east at south

    May 18, 2026 · Apt 4C

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south

    May 18, 2026 · Apt 4C

    Open — Notice of issuance sent to tenant

DOB building violations

The newest 50 of 94 DOB violations. The city keeps the complete history.

  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)

    Jun 23, 2024

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - dismissed
  • Nycha elev annual inspection/test elevatorrequired

    Vio issued to nycha elevator-failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - dismissed
  • Nycha elev annual inspection/test elevatorrequired

    Vio issued to nycha elevator-failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - dismissed
  • Nycha elev annual inspection/test elevatorrequired

    Vio issued to nycha elevator-failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - dismissed
  • Nycha elev annual inspection/test elevatorrequired

    Vio issued to nycha elevator-failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)

    Mar 27, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)

    Feb 16, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Nycha elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Jun 1, 2016

    Dob violation - dismissed
  • Nycha elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Jun 1, 2016

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2015

    Mar 14, 2016

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Dec 4, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Dec 4, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Dec 4, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Dec 4, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Dec 4, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Dec 4, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    May 24, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    May 24, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    May 24, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    May 24, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7a technical report by 02/21/2012

    Jan 31, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7a technical report by 02/21/2012

    Jan 31, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7a technical report by 02/21/2012

    Jan 31, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7a technical report by 02/21/2012

    Jan 31, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7a technical report by 02/21/2012

    Jan 31, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7a technical report by 02/21/2012

    Jan 31, 2013

    Dob violation - dismissed

ECB violations

The newest 50 of 132 ECB violations. The city keeps the complete history.

  • Class - 2

    At time of inspection observed no suspended scaffold equipment on site. notification n000005060 n000005178. upon reviewing dob system no notification on record/found for removal of electric c-hook.

    Sep 21, 2026 · Penalty $2,500

    Resolve
  • Class - 2

    Summons issued for failure to maintain due to several lose bricks with missing mortar joints at the sitting area where the benches are in front yard of structure., repair and/or replace

    Sep 20, 2026 · Penalty $1,250

    Active
  • Class - 2

    1) provide access to mr to conduct a proper elevator inspection. 2) adjust car door scrapping facia on 5th floor. 3) provide correct superintendent identification posting in lobby of building number not working

    Aug 25, 2026

    Resolve
  • Class - 1

    Failure to maintain bldg exterior facade and appurtenances.-note: at time of inspection i observed at exp #1 west (1)cracked/broken window 2fl above over hang.-exp #1 west, #4 south, #3 east-cracked/spalled con

    Aug 18, 2025 · Penalty $5,000

    Resolve
  • Class - 2

    For failure to maintain building in code-compliant manner at time of inspection observed on the first floor building entrance door lobby electrical box left open without cover box,or wire plugs also wires hango

    Dec 17, 2024 · Penalty $312

    Resolve
  • Class - 2

    At time of inspection observed at roof level electric extension cord wire split and connected to 4 electric bathroom fans, conduit pipe open and exposed unprotected wire., repair and/or replace

    May 7, 2024 · Penalty $625

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909807. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909804. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909803. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909802. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909806. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909805. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909811. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909812. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909810. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909808. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Class 2: phone missing install phone & program to 24 hr emergency operator. car button station not tagged with device number. provide nyc id # tag. car door misaligned causing rubbing/scrapping. adjust door to

    Jul 18, 2023 · Penalty $625

    Resolve
  • Class - 1

    During inspection of a housing complex with active construction throughout, i observed an area with construction material and concrete mixing going on without any debris netting surrounding the chain link fence

    Apr 18, 2023 · Penalty $2,500

    Resolve
  • Class - 2

    Exit door not self-closing.noted:exterior door at classroom 2, exit 4 not closing.creating hazardous condition in event of fire.remedy:repair/replace door

    Jan 20, 2023 · Penalty $625

    Resolve
  • Class - 2

    Clean pit., provide in-car emergency phone., provide in-car push and pull emergency stop switch., service motor room fire extinguisher., properly secure top of car door operator cover., provide top of car elect

    Dec 27, 2022 · Penalty $625

    Resolve
  • Class - 2

    Provide push and pull in-car emergency stop switch., provide in-car emergency phone., clean pit., provide in-car device #., provide in-case of fire signs all floors., provide up to date maintenance log book., p

    Dec 8, 2022 · Penalty $625

    Resolve
  • Class - 2

    Provide push and pull in-car emergency stop switch., provide in-car emergency phone., clean pit., provide in-car device #., provide in-case of fire signs all floors., provide up to date maintenance log book., p

    Dec 8, 2022 · Penalty $625

    Resolve
  • Class - 2

    In cellar new domestic hot water system with mixing valve and storage tanks being installed without a dob permit, obtain all permits; correct violation and submit the certificate of correction

    Oct 13, 2022 · Penalty $1,250

    Resolve
  • Class - 3

    In the buildings steam distribution room in cellar the vacuum system pump is leaking, maintain boiler; correct violation and submit the certificate of correction

    Oct 13, 2022 · Penalty $500

    Resolve
  • Class - 1

    This device is being used to transport men and materials in an unsafe manner. i observed residents and construction materials riding together. this is an illegal conversion

    Sep 19, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    This device is being used to transport men and materials in an unsafe manner. i observed residents and construction materials riding together. this is an illegal conversion

    Sep 19, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Exit door not self closing. noted: premises day care (school) at 1st floor classrooms doors missing door check. doors not self closing. remedy: repair/replace doors.

    Jul 2, 2015

    Resolve
  • Class - 2

    Failure to file an amended 5th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report.remedy:file an amended report following remedial repair

    Sep 17, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable 6th round technical report in compliancewith code provisions:periodic insp of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.36011196z

    Aug 19, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable 6th round technical report in compliancewith code provisions:periodic insp of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.36011225z

    Aug 19, 2010

    Resolve
  • Class - 2

    Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedial repa

    Jul 16, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Jan 7, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Jan 7, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Jan 7, 2010

    Resolve
  • Class - 2

    Failure to file an amended fifth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report remedy:file an amended report following repairs of th

    Oct 23, 2009

    Resolve
  • Class - 2

    Failure to file an amended fifth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report remedy:file an amended report following repairs of th

    Oct 23, 2009

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remed

    Oct 23, 2009

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report.remedy:file an amended report following remedial repa

    May 28, 2009

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Apr 24, 2009

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Apr 24, 2009

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Apr 24, 2009

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Apr 24, 2009

    Resolve
  • Class - 2

    14h11.60q03.60m07.

    Jan 27, 2009

    Resolve
  • Class - 2

    Failure to amended fifth round report acceptable to this dept. indicating correction of unsafe conditions described in initial local law 11/98 report.remedy:file an amended report following remedial repairs of

    Jan 9, 2009

    Resolve
  • Class - 2

    14h11/05m070/17h11/52o02/ (14h)replace mirror(05m)provide zone restrictor(17h)replace where needed (520)clean build-up.

    Dec 30, 2008

    Resolve
  • Class - 2

    60q03/05m07/17h11/52o02/05i11/72h11/(60q)guard m.r. lights(05m)provide door restrictor(17h)replace where needed (520)clean hoist rope build-up(05i)replace vision panel(72h)replace pit stop switch

    Dec 30, 2008

    Resolve
  • Class - 2

    62h10/75k10/72k11/60q03/ 62-h arcing.

    Dec 30, 2008

    Resolve
  • Class - 2

    14h11/10h11/17h11/72h/1105m07/(14h)replace(10,17h)replace where needed (72m)replace (05m)provide zone restrictor

    Dec 29, 2008

    Resolve
  • Class - 2

    60q03/17h11/10h11/72h11/05m07/ (16h)(10h) replace where needed (72h) replace pit stop switch (05m) provide zone restrictors.

    Dec 29, 2008

    Resolve
  • Class - 2

    989m05/60q03/ (98m) 5 yr tag missing.

    Dec 29, 2008

    Resolve