roofy

Violations at 600 Euclid Avenue

Brooklyn, NY 11208 · BBL 3-04292-0061 · Back to the property

HPD housing violations

14 HPD violations, newest first.

  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the west wall in the bathroom located at apt 10e, 1st story, 1st apartment from north at east

    Dec 19, 2018 · Apt 10E

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the south wall in the 3rd room from north located at apt 10e, 1st story, 1st apartment from north at east

    Dec 19, 2018 · Apt 10E

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the east wall, west wall in the foyer located at apt 10e, 1st story, 1st apartment from north at east

    Dec 19, 2018 · Apt 10E

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the west wall in the private hallway located at apt 10e, 1st story, 1st apartment from north at east

    Dec 19, 2018 · Apt 10E

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the north wall in the 1st room from north located at apt 10e, 1st story, 1st apartment from north at east

    Dec 19, 2018 · Apt 10E

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the bathroom located at apt 10e, 1st story, 1st apartment from north at east

    Dec 19, 2018 · Apt 10E

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 3rd room from north located at apt 10e, 1st story, 1st apartment from north at east

    Dec 19, 2018 · Apt 10E

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the foyer located at apt 10e, 1st story, 1st apartment from north at east

    Dec 19, 2018 · Apt 10E

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the private hallway located at apt 10e, 1st story, 1st apartment from north at east

    Dec 19, 2018 · Apt 10E

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 1st room from north located at apt 10e, 1st story, 1st apartment from north at east

    Dec 19, 2018 · Apt 10E

    Closed — Violation closed
  • BHazardous

    Abate the nuisance consisting of roaches located at apt 6d, 6th story

    Aug 23, 2016 · Apt 6D

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 6d, 6th story, 1st apartment from east at south

    Aug 23, 2016 · Apt 6D

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective locking device at entrance door at lobby, 1st story

    Aug 23, 2016

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective intercom located at apt 6d, 6th story, 1st apartment from east at south

    Aug 23, 2016 · Apt 6D

    Open — Nov sent out

DOB building violations

The newest 50 of 181 DOB violations. The city keeps the complete history.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Failure to correct swarmp conditions (facade) facade required

    Cycle 9 failure to correct swarmp conditions

    May 7, 2025

    Dob violation - active
  • Failure to correct swarmp conditions (facade) facade required

    Cycle 9 failure to correct swarmp conditions

    May 7, 2025

    Dob violation - active
  • Failure to correct swarmp conditions (facade) facade required

    Cycle 9 failure to correct swarmp conditions

    May 7, 2025

    Dob violation - active
  • Failure to correct swarmp conditions (facade) facade required

    Cycle 9 failure to correct swarmp conditions

    May 7, 2025

    Dob violation - active
  • Failure to correct swarmp conditions (facade) facade required

    Cycle 9 failure to correct swarmp conditions

    May 7, 2025

    Dob violation - active
  • Failure to correct swarmp conditions (facade) facade required

    Cycle 9 failure to correct swarmp conditions

    May 7, 2025

    Dob violation - active
  • Failure to correct swarmp conditions (facade) facade required

    Cycle 9 failure to correct swarmp conditions

    May 7, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 internal hgh pressure inspection

    Sep 23, 2024

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 external hgh pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Failure to correct swarmp conditions (facade) facade required

    Failure to correct swarmp conditions

    Aug 1, 2024

    Dob violation - active
  • Failure to correct swarmp conditions (facade) facade required

    Failure to correct swarmp conditions

    Aug 1, 2024

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2023

    Jun 23, 2024

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • Hazardous condition (facade) facade required

    Nycha cycle 9c unsafe report filed

    Aug 8, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2021 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2021 external hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2020 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2020 external hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2019 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2019 external hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 external hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 external high pressure inspection

    Apr 25, 2023

    Dob violation - active

ECB violations

The newest 50 of 96 ECB violations. The city keeps the complete history.

  • Class - 2

    Failure to maintain building in code-compliant manner. entrance wall is in disrepair. cracked plaster from water damage, peeling paint. remedy: comply with code.

    Mar 31, 2026 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain building facade wall"s" and appurtenances. note: at the time of inspection i observed at ex #1, north elevation, cracked/broken glass window at 7th floor. unsecured objects attached to windo

    Dec 29, 2025 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to maintain exterior building facade and appurtenances.note:atthe time of inspection:observed at exp#1 and #4 in secure flower pots at the window at 4 floor north and west elevation.rem:maintain exterio

    Jul 25, 2025 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. exterior walls have become porous and pipe leaking in hallway well. causing damage tointerior wall of class room and hallway. remedy: repair and/or replace

    Jul 17, 2025 · Penalty $1,250

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner. observed spalling paint from meter damage at front entrance, class room 1, 3 and hallway inside upn center. remedy: repair and/or replace.

    Jul 17, 2025 · Penalty $1,250

    Active
  • Class - 2

    Failure to maintain building exterior wall(s) or appurtenances. note:-at the time of inspection observed at expo #1, 2 and 3 north, east andsouth elevation damaged/deteriorating mortar joint at several location

    Aug 19, 2024 · Penalty $1,250

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner illumination forexit discharges and public corridors per bc 1006.1;27-381.existing emergency light are not operational when tested at outside of kitchen,cla

    Feb 7, 2022 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner:at classroom#1 rear exit door toward schoolyard/playground does not class properly.reissue#35560830m(4/20/2021)rem:repair and/or replace.

    Feb 7, 2022 · Penalty $1,562

    Resolve
  • Class - 2

    Exit door not self closing.noted:at classroom 2 door check disrepair/non operational when tested.remedy:repair/replace door.

    Apr 20, 2021 · Penalty $625

    Resolve
  • Class - 2

    Failure to maitain building in code compliant manner.illumination for exits.exit discharge and public corridors per bc1006.1/27-381.noted:throughout entire emergency lights were non operational in various locat

    Apr 20, 2021 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain building in code complaliant manner.noted:at classroom 1 and rear exit doors are in disrepair/cracked.remedy:repair and/or replace.

    Apr 20, 2021 · Penalty $625

    Resolve
  • Class - 2

    Reissue ecb#35383960x.failure to maintain building in code compliant manner use it prohibited door and/or hardware per bc1008.1.8/27-371(j),noted:at rear exit door with haumg slide bolt lock and key locking dev

    Apr 20, 2021 · Penalty $625

    Resolve
  • Class - 2

    At time of inspection,observed construction activities contrary to mayors emergency executive order 120 & subsequent orders incorporating requirements of governors executive order 202.34 & subsequent orders &

    Sep 23, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    At time of inspection,observed construction activities contrary to mayors emergency executive order 120 & subsequent orders incorpating requirements of governors executive order 202.34 & subsequent orders and

    Sep 23, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements. attime of inspection on a active jobsite alt-2,observed numerous area(basement)w/large amounts of debris & garbage create a tripping hazard.

    Mar 4, 2020

    Resolve
  • Class - 1

    Work does not conform to approved design drawing/plans. at time of inspection on a active jobsite alt-2,observed that hoist beam(structure entry)installed at exp#2 for removal of demolished material from boiler

    Mar 4, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Construction daily log book. at time of inspection on an active jobsite alt-2,upon request to see construction super daily log book,it was observed page date 3/3/20 missing address(bldg #),job #,superintendent

    Mar 4, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner: use of prohibited door and/or hardware per bc 1008.1.8. 27-371g) 2 exit doors one in the rear and front entrance doro has illegal hardware rear door has

    Feb 12, 2019

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner:lack of emergency lighting for exit, exit discharges and public corridors per 1006-1;27-542. note: the day care "colony-south brooklyn houses inc" at 1st flr

    Apr 14, 2016 · Penalty $250

    Resolve
  • Class - 2

    Failure to maintain bldg in code-compliant manner: failure to provide wired glass vision panels.per 27-371(b) noted: the daycare colony south brooklyn houses,inc at first floor of this building do not have wire

    Apr 14, 2016

    Resolve
  • Class - 2

    17h11,10h11,17d06,100m07,14h11. 100m-provide in case of fire signage on all floors.

    Sep 25, 2015

    Resolve
  • Class - 2

    Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. 36013965z. remedy: file an amended report following

    Dec 17, 2010

    Resolve
  • Class - 2

    Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. 36013924r. remedy: file an amended report following

    Dec 17, 2010

    Resolve
  • Class - 2

    Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. 36013923p. remedy: file an amended report following

    Dec 17, 2010

    Resolve
  • Class - 2

    14h11,56y13,42i11,17h11,17m07,60q03,05i11,100l10,16j01 14h-dirty mirror 56y-seal leaks 17h-replace where needed 17m-rear gib 4fl 05i-vision panel 100l-adjust operator limms door does not close during fire servi

    Sep 17, 2010

    Resolve
  • Class - 2

    17h11,17d06,10h11,60q03,61p16,56y13,42g11,14h11,21j01. 61p- remove padlock. 42g- unreadable fuses. 14h- replace mirror. 20j- adjust 3 fl interlock

    Sep 7, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable 6th round technical report in compliancewith code provisions:periodic insp of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.36011223p

    Aug 19, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable 6th round technical report in compliancewith code provisions:periodic insp of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.36011222n

    Aug 19, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable 6th round technical report in compliancewith code provisions:periodic insp of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.36011221l

    Aug 19, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable 6th round technical report in compliancewith code provisions:periodic insp of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.36011220j

    Aug 19, 2010

    Resolve
  • Class - 2

    Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98report.36011482j.rem:file an amended report following remedial

    Jun 25, 2010

    Resolve
  • Class - 2

    Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98report.36011481h.rem:file an amended report following remedial

    Jun 25, 2010

    Resolve
  • Class - 2

    Failure to file an amended 6th round report acceptable to this dept indicating corrections of unsafe conditions described in initial local law 11/98report.36011480x.rem:file an amended report following remedial

    Jun 25, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Jan 7, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Jan 7, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Jan 7, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Jan 7, 2010

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report rem: file an amended report following remedial repair

    Dec 23, 2009

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report rem: file an amended report following remedial repair

    Dec 23, 2009

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report rem: file an amended report following remedial repair

    Dec 23, 2009

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Apr 24, 2009

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Apr 24, 2009

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Apr 24, 2009

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Apr 24, 2009

    Resolve
  • Class - 2

    14h11.17h11.100h11.42d06.05m07.98m15.56y13.39m07.60q03.14h replace where needed 100h toe guard 42d timer relay 05m door restrictor 98m 5yr tag missing 56y seal leaks 39m box cover

    Jan 7, 2009

    Resolve
  • Class - 2

    14h11.10h11.17h11.17d06.98m15.05m07.60q03.38e01.56y13.14h replace 10h replace 17h replace secure where needed 98m 5yr tag missing 05m door restrictor 60q supply guards 38e travelers rubbing tail rope 56y seal

    Jan 7, 2009

    Resolve
  • Class - 2

    03i10.05m05.14h11.58h10.98m05.40i10.60q03.17h11.03i cab fl damaged 05m door restrictor 14h replace mirror 58h noise in bearings 98m 5yr tag missing 40i repair window leak 17h replace where needed

    Jan 7, 2009

    Resolve
  • Class - 2

    77x10.29m07.20i11.77x under car light 29m car door restrictor 20i car door vision glass

    Jan 7, 2009

    Resolve
  • Class - 2

    42o06.21l10.05m07.98m15.42d secure car door motor overload 21l shaking 6fl door stops car 05m car door restrictor

    Jan 7, 2009

    Resolve
  • Class - 2

    05m07.98m15.05m car door restrictor

    Jan 7, 2009

    Resolve