Violations at 543 Autumn Avenue
Brooklyn, NY 11208 · BBL 3-04237-0010 · Back to the property
HPD housing violations
The newest 50 of 71 HPD violations. The city keeps the complete history.
- IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts vacate order # 240761 apt 1c east 1
Oct 18, 2023
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 1c, 1st story, 1st apartment from north at east
Sep 28, 2023 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening padlock at gate at building front at north at fire passage way
Sep 19, 2023
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening key operated lock at bulkhead door
Sep 19, 2023
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household goods at public hall, 1st story
Jul 12, 2023
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective at ceiling , 3rd story
Jul 12, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling , 3rd story
Jul 12, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at building front entrance door
Jun 12, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective bulkhead door at public hall stairs, 3rd story
Jun 12, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 1b, 1st story, 2nd apartment from west at north
Jun 12, 2023 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 17, 2017
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 17, 2017
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective lock on building entrance door
May 31, 2017
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 1st story
May 31, 2017
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retarding ceiling at public hall, 1st story
May 31, 2017
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak ceiling at public hall, 1st story
May 31, 2017
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective wire glass in skylight at public hall stairs bulkhead , 3rd story
May 31, 2017
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 3b, 3rd story, 1st apartment from north at east
May 31, 2017 · Apt 3B
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 3b, 3rd story, 1st apartment from north at east
May 31, 2017 · Apt 3B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 1st story
Apr 4, 2017
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Apr 4, 2017
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retarding / plaster / ceiling at public hall, 1st story
Apr 4, 2017
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Mar 30, 2017
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective at ceiling at public hall, 1st story
Mar 30, 2017
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Mar 30, 2017
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 1st story
Mar 28, 2017
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant ceiling at public hall, 1st story
Mar 28, 2017
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling at public hall, 1st story
Mar 28, 2017
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north wall at vestiuble , 1st story
Feb 27, 2017
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at vestibule , 1st story
Feb 27, 2017
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department fire retadant material at ceiling and east wall, east section at public hall, 1st story
Feb 27, 2017
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retadant material at ceiling and east wall, east section at public hall, 1st story
Feb 27, 2017
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling, east section at public hall, 1st story
Feb 27, 2017
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of furniture obstructed fire escape gate in the 1st room from east at north located at apt 1c, 1st story, 1st apartment from north at east
Feb 9, 2017 · Apt 1C
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south passage way yard
Feb 2, 2017
Closed — Violation closed - BHazardous
Properly repair the broken or defective mailbox for apt 1c at public hall, 1st story
Feb 2, 2017
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Jan 25, 2017
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material ceiling at public hall, 1st story
Jan 25, 2017
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 1b, 1st story, 1st apartment from west at north
Dec 16, 2016 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east located at apt 1b, 1st story, 1st apartment from west at north
Dec 16, 2016 · Apt 1B
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective door handles at entrance to bldg , 1st story
Aug 5, 2016
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of refrigerator with door attach at public hall, 1st story
Aug 3, 2016
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening padlock gate at north fire passageway west at bldg. front
Jun 17, 2016
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. in the 1st room from east at north located at apt 1c, 1st story, apartment at east
Jun 14, 2016 · Apt 1C
Closed — Violation closed - BHazardous
Replace with new the missing lock at mailbox (for apt. 1c) at public hall, 1st story
Jun 14, 2016
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceilings and walls in the entire apartment located at apt 1c, 1st story, apartment at east
Jun 14, 2016 · Apt 1C
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 1c, 1st story, apartment at east
Jun 14, 2016 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective glass window pane lower sash in the kitchen located at apt 1c, 1st story, apartment at east
Jun 14, 2016 · Apt 1C
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1c, 1st story, apartment at east
Jun 14, 2016 · Apt 1C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective caulking around sink in the kitchen located at apt 1c, 1st story, apartment at east
Jun 14, 2016 · Apt 1C
Closed — Violation dismissed
DOB building violations
8 DOB violations, newest first.
- Plumbing none
Access to premise to inspect approved plumbing work under permit #321338067 denied. need access to verify plumbing work
Jan 27, 2018
Dob violation - active - Plumbing none
Access to premise to inspect approved plumbing work under permit #321338174 denied. need access to verify plumbing work
Jan 27, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 23, 2017
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations
2 ECB violations, newest first.
- Class - 1
Work without permit.noted:at cellar,install waste water and gas creating a 2 bedroom class a apt.installed waste and water for 3 piece bath toilet,sink,tub and residential kitchen sink.installed gas line for
May 28, 2017
Resolve - Class - 2
Resience altered for occupancy for more than the legally approved number of families.noted:nine family building altered to ten families withcellar rear convert to a class'a'apt.the 2 bedroom apt has a 3 piece
May 28, 2017
Resolve