Violations at 461 Crescent Street
Brooklyn, NY 11208 · BBL 3-04216-0018 · Back to the property
HPD housing violations
21 HPD violations, newest first.
- BHazardous
Abate the nuisance consisting of wall erected creating partition at public hall, 2nd story
Mar 23, 2005
Open — Nov sent out - BHazardous
Replace with new the missing doors entrance from public hall to kitchen and in the 1st room from north at east located at apt 2fl, 2nd story
Mar 23, 2005 · Apt 2FL
Open — Nov sent out - BHazardous
Replace with new the missing metal cover electical light switch south wall in the bathroom located at apt 2fl, 2nd story
Mar 23, 2005 · Apt 2FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of expose electrical wires west wall in the bathroom located at apt 2fl, 2nd story
Mar 23, 2005 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls vestibule at public hall, 1st story
Mar 23, 2005
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls in the entire apartment located at apt 2fl, 2nd story
Mar 23, 2005 · Apt 2FL
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story
Mar 23, 2005 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line sink in the kitchen located at apt 2fl, 2nd story
Mar 23, 2005 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective connection air valve radiator in the 2nd room from north at west located at apt 2fl, 2nd story
Mar 23, 2005 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective wood panelling east and south walls in the kitchen located at apt 2fl, 2nd story
Mar 23, 2005 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls at lobby, 1st story
Feb 18, 2005
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective water damager sheetrock ceiling and west wall at lobby, 1st story
Feb 18, 2005
Open — Nov sent out - BHazardous
Replace with new the broken or defective scuttle cover at 2nd story public hall of roof
Mar 3, 2004
Open — Nov sent out - BHazardous
Replace with new the missing winow stops of window sashes at front room 2nd story apt
Mar 3, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective celotex celing front and rear rooms --2nd story apt
Mar 3, 2004
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets wash basin 2nd story apt bathroom
Mar 3, 2004
Open — Nov sent out - BHazardous
Repair by closing so as to be gas tight all openings in the waste pipe of waste basin 2nd story apt bathroom
Mar 3, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective tile board above bathtub 2nd story apt bathroom
Mar 3, 2004
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak at ceilings frontand rear rooms 2nd story apt
Mar 3, 2004
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in waste pipe of bathtub 2nd story at bathroom
Mar 3, 2004
Open — Nov sent out - ANon-hazardous
Refit entrance door located at apt 2fl, 2nd story
Feb 10, 2002 · Apt 2FL
Open — Nov sent out
DOB building violations
No DOB violations on record
ECB violations
No ECB violations on record