978 Glenmore Avenue
Brooklyn, NY 11208BBL 3-04211-0022Map
Owner of record: Glenmore Apartments LLC
978 Glenmore Avenue is a mixed residential and retail building built in 1925 in Brooklyn, 11208. It has 4 residential units across 3 floors. The owner of record is Glenmore Apartments LLC. HPD has recorded 63 housing violations here, most recently on January 10, 2026. 12 of the 50 most recent violations are still open.
- HPD violations
- 63
- DOB violations
- 0
- ECB violations
- 3
- HPD complaints
- 83
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 63
- CImmediately hazardous
Properly repair with similar material the broken or defective metal entrance door
Jan 10, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Jan 5, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Jan 5, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Jan 5, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective spring balance at lower sash window in the 1st room from north located at apt 3r, 3rd story, 1st apartment from south at west
Jun 12, 2025 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Jan 31, 2025 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement
Jan 31, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at north wall in the 1st room from north located at apt 3r, 3rd story, 1st apartment from south at west
Jan 31, 2025 · Apt 3R
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hotwater fixtures in the kitchen located at apt 3r, 3rd story, 1st apartment from south at west
Jan 31, 2025 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature 0f 130 degrees at all hot water fixture at sink in the kitchen located at apt 3r, 3rd story, 1st apartment from east at south
Jan 20, 2025 · Apt 3R
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective lower window sash spring balance at north wall in the 1st room from north at west located at apt 3r, 3rd story, 1st apartment from east at south
Jan 20, 2025 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire door at south at public hall, 3rd story
May 3, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire door at south at public hall, 2nd story
May 3, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at vestibule door at public hall, 1st story
May 3, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
May 3, 2024
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in entire apt. in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Mar 26, 2024 · Apt 3R
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood window stool in the kitchen located at apt 3r, 3rd story, 1st apartment from south at west
Mar 26, 2024 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lower sash window at south wall in the kitchen located at apt 3r, 3rd story, 1st apartment from south at west
Mar 26, 2024 · Apt 3R
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective counter balance at lower sash window at north wall in the 1st room from north located at apt 3r, 3rd story, 1st apartment from south at west
Mar 26, 2024 · Apt 3R
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Mar 26, 2024 · Apt 3R
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Mar 26, 2024 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Mar 26, 2024 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Mar 26, 2024 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire door leading to south at public hall, 2nd story
Mar 26, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story
Mar 26, 2024
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds maximum temperature of 130 degrees in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Mar 4, 2024 · Apt 3R
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Mar 4, 2024 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Mar 4, 2024 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Mar 4, 2024 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Mar 4, 2024 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Mar 4, 2024 · Apt 3R
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 23, 2021
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at vestibule at public hall, 1st story
Apr 23, 2021
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Apr 23, 2021
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items on 2nd story balcony at south side of building
Nov 2, 2018
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing hand rail on 3rd story balcony at south side of building
Nov 2, 2018
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the walls in the kitchen located at apt 3r, 3rd story, apartment at west
Oct 24, 2018 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 3rd room from north located at apt 3r, 3rd story, apartment at west , section ''438''
Oct 24, 2018 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective bell buzzer at front entrance to building leading to intercom box at the north wall in the 4th room from north located at apt 3r, 3rd story, apartment at west , section ''438''
Oct 24, 2018 · Apt 3R
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 4th room from north located at apt 3r, 3rd story, apartment at west , section ''438''
Oct 24, 2018 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective south wooden window frame in the kitchen located at apt 3r, 3rd story, apartment at west
Oct 24, 2018 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Refit lower sash counter balance at south window in the bathroom located at apt 3r, 3rd story, apartment at west , section ''438''
Oct 24, 2018 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Oct 18, 2018
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Oct 18, 2018 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Aug 4, 2017 · Apt 2R
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Aug 4, 2017 · Apt 2R
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Aug 4, 2017 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Aug 4, 2017 · Apt 2R
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of air conditioner blocking egress to fire escape in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Aug 4, 2017 · Apt 2R
Open — First no access to re- inspect violation - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 4, 2017
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 3
- Class - 2
Failure to maintain building in a code compliant manner. noted:at fireescape, window a/c unit installed at egress window. material(stool,tire,broom,etc.) stored at fire escape. remedy:building must be maintaine
Nov 3, 2018 · Penalty $625
Resolve - Class - 3
Fail to maintain bldg walls. at left side of the premises stucco wall 1st fl level has numerous of cracks & pulling out from the base. remedy: maintain exterior bldg walls.
May 28, 2010 · Penalty $100
Resolve - Non-hazardous
Failure to maintain bldg exteror walls defect is missing siding at west and rear, loose plywood at 3rd story west center. remedy:replace the missing sideing at rear and west
Dec 9, 1998
Resolve
Complaints
- Heat/hot water
Entire building
Jan 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 1, 2026 · Apt BLDG
Close - Door/window
Window frame
Jul 2, 2025 · Apt 3R
Close - Door/window
Window frame
Jun 28, 2025 · Apt 3R
Close - Door/window
Window frame
Jun 7, 2025 · Apt 3R
Close - Door/window
Window frame
Jun 7, 2025 · Apt 3R
Close
Show 40 more ↓
- Door/window
Window frame
May 30, 2025 · Apt 3R
Close - Door/window
Window frame
May 30, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Feb 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 30, 2025 · Apt 2R
Close - Flooring/stairs
Floor
Jan 30, 2025 · Apt 2R
Close - Paint/plaster
Wall
Jan 30, 2025 · Apt 2R
Close - Door/window
Window frame
Jan 30, 2025 · Apt 2R
Close - Paint/plaster
Wall
Jan 30, 2025 · Apt 2R
Close - Heat/hot water
Apartment only
Jan 29, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Jan 28, 2025 · Apt 2R
Close - Heat/hot water
Entire building
Jan 19, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 15, 2025 · Apt 2R
Close - Heat/hot water
Entire building
Jul 25, 2024 · Apt 3R
Close - Heat/hot water
Apartment only
Mar 2, 2024 · Apt 3R
Close - Heat/hot water
Entire building
Feb 23, 2023 · Apt 3R
Close - Heat/hot water
Entire building
Apr 22, 2021 · Apt 3R
Close - Heat/hot water
Entire building
Apr 17, 2021 · Apt 3R
Close - Electric
Power outage
Jul 7, 2019 · Apt 3R
Close - Heat/hot water
Entire building
Mar 18, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2019 · Apt 3R
Close - Heat/hot water
Entire building
Jan 13, 2019 · Apt 3FL
Close - Paint/plaster
Wall
Oct 17, 2018 · Apt 3R
Close - Paint/plaster
Window/frame
Oct 17, 2018 · Apt 3R
Close - Door/window
Window frame
Oct 17, 2018 · Apt 3R
Close - Electric
Power outage
Oct 17, 2018 · Apt 3R
Close - Heat/hot water
Entire building
Oct 17, 2018 · Apt 3R
Close - Paint/plaster
Ceiling
Dec 23, 2012 · Apt 1R
Close - Nonconst
Vermin
Jun 21, 2009 · Apt 2L
Close - Nonconst
Vermin
Jun 21, 2009 · Apt 2L
Close - General
Doors
Nov 14, 2006 · Apt 2F
Close - Appliance
Refrigerator
Nov 14, 2006 · Apt 2F
Close - General
Floor
Nov 14, 2006 · Apt 2F
Close - General
Floor
Nov 14, 2006 · Apt 2F
Close - General
Cabinet
Oct 23, 2006 · Apt 2F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S4)
- Year built
- 1925
- Floors
- 3
- Residential units
- 4
- Building area
- 4,755 ft²
- Lot area
- 2,500 ft²
- Zoning
- R5B
- Community board
- 305
- Council district
- 42
- Block / lot
- 4211 / 22
- Assessed value
- $304,650
- Landmark / historic district
- No
HPD registration #329565, last renewed Sep 17, 2025.
Questions about 978 Glenmore Avenue
Who owns 978 Glenmore Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Glenmore Apartments LLC.
Does 978 Glenmore Avenue have violations?
Yes. NYC HPD has recorded 63 housing violations at this property.
Is 978 Glenmore Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 978 Glenmore Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 978 Glenmore Avenue?
It has 4 residential units and 5 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.