417 Grant Avenue
Brooklyn, NY 11208BBL 3-04183-0022Map
Owner of record: Chopra Usha
417 Grant Avenue is a walk-up apartment building built in 1921 in Brooklyn, 11208. It has 8 residential units across 4 floors. The owner of record is Chopra Usha. HPD has recorded 466 housing violations here, most recently on September 26, 2026. 50 of the 50 most recent violations are still open.
- HPD violations
- 466
- DOB violations
- 5
- ECB violations
- 2
- HPD complaints
- 383
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 466
- CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 3rd room from east at north located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 4th room from east located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 3rd room from east at south located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 2nd room from east at south located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall, south wall in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from west at north wall in the 4th room from east located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall, north wall, ceiling in the 4th room from east located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from west at north wall, 1st radiator from west at north wall in the 3rd room from east at south located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from east at south wall door, east wall in the 3rd room from east at south located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in clogged surface drain at building 's east yard
Sep 26, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective glass pane at window to north wall at public hall, 1st story
Sep 26, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door basement is locked at public hall, 1st story
Sep 26, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door at, entrance door, at north wall , 1st from west in the 3rd room from east at south located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective cracked wood door at entrance in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at bathtub waste line in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balances at lower sash window at north wall in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl at west wall in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet underneath sink at east wall in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink east wall in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Repair the leaky and/or defective faucets at bathtub west wall in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective reglalze the porcelain paint at bathtub west wall in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall in the 3rd room from east at north located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the 3rd room from east at north located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 3rd room from east at north located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, ceiling in the 4th room from east located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the 4th room from east located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, 1st closet from east at south wall door in the 3rd room from east at south located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, south wall in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqt observed at west wall in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall, ceiling in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Sep 26, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt 6, 3rd story, 1st apartment from south at west
Sep 16, 2026 · Apt 6
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch assembly device at vestibule at public hall, 1st story
Sep 16, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th story
Sep 16, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th story
Sep 16, 2026
Open — Nov sent out
DOB building violations · 5
- Construction other optional
Requesting an engineer report due to a section of facade collapsing onto public sidewalk wat exposure#4. an engineering report is required to assess and rectify the damages property has sustained
Jun 27, 2025
Dob violation - active - Immediate emergency anythingoptional
Install a sidewalk shed totaling approx. 145 linear feet at exposure#1 and #4, including corner wrap-around. this includes approx. 100 linear feet along exp #1 (mckinley ave) & approx. 45 linear along exp#4(grand ave). the sidewalk shed must be fully decked & tightly sheeted to the building facade. note: sidewalk shed required dimensions should accoun
Jun 27, 2025
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active
ECB violations · 2
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dept. of buildings for violation #39152168j., file a certificate of correction
Jan 15, 2026 · Penalty $6,250
Active - Class - 1
Observe above the 4fl window the soldier course brick on the lintel are leaning forward at all windows on mckinley ave above the 4fl the same condition at the grant avenue side of the building. also observed sp
Jun 27, 2025 · Penalty $2,500
Active
Complaints
- Heat/hot water
Entire building
Oct 23, 2026 · Apt BLDG
Open - General
Cabinet
Oct 15, 2026 · Apt 4
Open - Unsanitary condition
Mold
Oct 15, 2026 · Apt 4
Open - Unsanitary condition
Pests
Sep 14, 2026 · Apt 7
Close - Door/window
Door
Sep 14, 2026 · Apt 7
Close - Safety
Smoke detector
Sep 14, 2026 · Apt 7
Close - Safety
Carbon monoxide detector
Sep 14, 2026 · Apt 7
Close - Safety
Fire escape
Sep 14, 2026 · Apt 6
Close - Unsanitary condition
Pests
Sep 14, 2026 · Apt 6
Close - Unsanitary condition
Pests
Sep 14, 2026 · Apt 6
Close
Show 40 more ↓
- Unsanitary condition
Pests
Sep 14, 2026 · Apt 1
Close - Unsanitary condition
Pests
Sep 14, 2026 · Apt 1
Close - Safety
Smoke detector
Sep 14, 2026 · Apt 1
Close - Safety
Carbon monoxide detector
Sep 14, 2026 · Apt 1
Close - Paint/plaster
Wall
Sep 14, 2026 · Apt 1
Close - Paint/plaster
Ceiling
Sep 14, 2026 · Apt 1
Close - Paint/plaster
Wall
Sep 14, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
Sep 14, 2026 · Apt BLDG
Close - Safety
Fire escape
Sep 14, 2026 · Apt BLDG
Close - Safety
Fire escape
Sep 14, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Sep 14, 2026 · Apt 7
Close - Plumbing
Basin/sink
Sep 8, 2026 · Apt 1
Close - Plumbing
Bathtub/shower
Sep 8, 2026 · Apt 1
Close - Unsanitary condition
Pests
Sep 8, 2026 · Apt 1
Close - Unsanitary condition
Mold
Sep 8, 2026 · Apt 1
Close - Plumbing
Basin/sink
Jun 20, 2026 · Apt 1
Close - Plumbing
Basin/sink
Jun 20, 2026 · Apt 1
Close - Unsanitary condition
Pests
Jun 20, 2026 · Apt 1
Close - Paint/plaster
Wall
Jun 20, 2026 · Apt 1
Close - Unsanitary condition
Mold
Jun 20, 2026 · Apt 1
Close - Appliance
Electric/gas range
Nov 24, 2025 · Apt 7
Close - Heat/hot water
Entire building
Nov 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 23, 2025 · Apt BLDG
Close - Appliance
Refrigerator
Nov 21, 2025 · Apt 2
Close - Heat/hot water
Entire building
Nov 18, 2025 · Apt BLDG
Close - Door/window
Door
Nov 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Nov 17, 2025 · Apt 8
Close - Safety
Fire escape
May 22, 2025 · Apt BLDG
Close - Door/window
Door
May 22, 2025 · Apt BLDG
Close - Outside building
Roofing
May 22, 2025 · Apt BLDG
Close - Outside building
Roof door/hatch
May 22, 2025 · Apt BLDG
Close - Door/window
Window pane
May 22, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
May 21, 2025 · Apt 6
Close - Unsanitary condition
Mold
May 21, 2025 · Apt 2
Close - Unsanitary condition
Pests
May 21, 2025 · Apt 2
Close - Unsanitary condition
Pests
May 21, 2025 · Apt 2
Close - Unsanitary condition
Pests
May 21, 2025 · Apt 8
Close - Safety
Carbon monoxide detector
May 21, 2025 · Apt 6
Close - Safety
Smoke detector
May 21, 2025 · Apt 6
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1921
- Floors
- 4
- Residential units
- 8
- Building area
- 6,624 ft²
- Lot area
- 1,840 ft²
- Zoning
- R5
- Community board
- 305
- Council district
- 37
- Block / lot
- 4183 / 22
- Assessed value
- $413,550
- Landmark / historic district
- No
HPD registration #306949, last renewed Aug 25, 2025.
Questions about 417 Grant Avenue
Who owns 417 Grant Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Chopra Usha.
Does 417 Grant Avenue have violations?
Yes. NYC HPD has recorded 466 housing violations at this property.
Is 417 Grant Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 417 Grant Avenue built?
City records list 1921 as the year it was built.
How many apartments are in 417 Grant Avenue?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.