403 Crescent Street
Brooklyn, NY 11208BBL 3-04170-0001Map
Owner of record: 403 Crescent LLC
403 Crescent Street is a mixed residential and retail building built in 1910 in Brooklyn, 11208. It has 2 residential units across 3 floors. The owner of record is 403 Crescent LLC. HPD has recorded 99 housing violations here, most recently on May 4, 2026. 16 of the 50 most recent violations are still open.
- HPD violations
- 99
- DOB violations
- 21
- ECB violations
- 22
- HPD complaints
- 160
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 99
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 22, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 24, 2022
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Oct 22, 2021
Open — Invalid certification - BHazardous
M/d law abate the nuisance consisting of rubbish obstructing the drop ladder at south exterior wall fire escape
Aug 18, 2021
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the ... yard at south
Aug 18, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jun 14, 2020
Open — Nov sent out
Show 40 more ↓
- BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Jun 14, 2020
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Jun 14, 2020
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Jun 14, 2020
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 14, 2020
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jun 14, 2020
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jun 14, 2020
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 29, 2019
Closed — Violation dismissed - BHazardous
Remove the illegal fastening lockable slide bolt at bulkhead door to roof
Oct 26, 2018
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors .. at boiler room
Oct 26, 2018
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors at bulkhead roof
Oct 26, 2018
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2017
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 2nd window frame from east at south wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 2nd window frame from east at south wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 5th room from east at north, the 5th room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective glass pane at lower sash of 2nd window at south in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 5th room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, west wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall, 1st door frame from south at west wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from east at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Dec 31, 2016 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile and sagging subfloor in the bathroom located at apt 2, 2nd story, apartment at east
Dec 27, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective window pane in the lower sash of the west window on the south wall in the 4th room from east located at apt 2, 2nd story, apartment at east
Dec 27, 2016 · Apt 2
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Dec 27, 2016
Open — Not complied with - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box (missing) at public hall, 1st story
Dec 27, 2016
Open — Not complied with - CImmediately hazardous
Remove the illegal fastening double cylinder key-operated locking device on gate at front areaway, 1st story
Dec 27, 2016
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ... in the entire apartment located at apt 2, 2nd story, apartment at east
Dec 27, 2016 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the smoke detector (defective) at entire apartment, 2nd story, apartment
Dec 27, 2016 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). (missing) at entire apartment, 2nd story, apartment
Dec 27, 2016 · Apt 2
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6; wg to replace = 0; wg to repair = 2; window guards must be installed with one-way screws and stops at entire apartment, 2nd story, apartment
Dec 27, 2016 · Apt 2
Closed — Violation closed
DOB building violations · 21
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 30, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 30, 2022
Dob violation - dismissed
Show 11 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 30, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 4, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 26, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed
ECB violations · 22
- Class - 2
Wwop. at time of inspection observed from exterior sidewalk cellar door, a male and female working in cellar level below store front installing full height partitions with sheetrock and insulation. (denied acce
Jul 26, 2022 · Penalty $1,280
Active - Class - 2
Work does not conform to approved construction documents.note:at the time of my inspection of a 3 story bldg w/an erected sidewalk shed at the bldgs exp.#1 & #4 w/an erected supported scaffold at the bldgs exp
Mar 18, 2022
Resolve - Class - 2
Pedestrian protection does not meet code specification.note:at the of my inspection of a 3 story bldg w/an erected sidewalk shed at the bldgs exp.#1 & #4 w/an erected supported scaffold on top of sidewalk.i obs
Mar 18, 2022
Resolve - Class - 1
Bc3307.2.1 obstruction of street w/o dot permit.at time of inspection of 4 story building observed debris container/dumpster on street at exp #4.reseach in dept records revealed no dot permit issued for obstruc
Dec 27, 2021 · Penalty $2,500
Resolve - Class - 1
Unqualified supervisor or workers performing work on scaffold.at time of inspection of active jobsite observed work in progress on supported scaffold at exp #4 for facade alteration.request for scaffold user ce
Dec 27, 2021 · Penalty $5,000
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order.at time of inspection of active jobsite observed workers performing work on supported scaffold at exp #4 for facade repair.check in bis alerted me
Dec 27, 2021 · Penalty $5,000
Active - Class - 2
Failure to comply w/the comm's order contained in summons/vio#39046175z issued on 08/18/21 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a cert of c
Oct 8, 2021 · Penalty $3,125
Resolve - Class - 1
At exposure 4, fire escape drop ladder obstructed with debris at base of ladder, also noted drop ladder directly above metal fence with zero clearance., remove obstruction
Aug 18, 2021 · Penalty $625
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons#violation#35507927x issued on 05-25-21 and to file a certificate or correction pursuan to 28-201.1 and 1rcny 102-01.for: failure to maintain
Jul 23, 2021 · Penalty $1,280
Resolve - Class - 1
Failure to maintain building in compliant manner at the time of my inspection observed at exp #4 fire escape stored flower pots,household items broeken.remove or repair
May 25, 2021 · Penalty $1,250
Resolve
Show 12 more ↓
- Class - 1
Unlawfully continued work while in notice of a stop work order.noted at time of inspection observed work in progress on facade at exp4.the brick work is being done by 3 workers who leave the site when i arrived
May 7, 2021 · Penalty $5,000
Resolve - Class - 2
Work without a permit.note:at time of inspection observed brick work approx 4ft height by 15ft wide at above premise with no footing detailsand hanging details.no permit on file with the dept of buildings to at
May 5, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35407876r issued on 04-02-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to provide unobstructed exit passageway. remedy: comply
Jun 8, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted;at time of inspection found fire escape at exposure 4 right side of building fire escape ladder drops directly onto metal fence w/ zero clearance w/ restau
Apr 2, 2019 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35372545p issued on 11/29/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for obstructing the egres
Jan 4, 2019 · Penalty $3,125
Resolve - Class - 1
Failure to maintain egress clear & unobstructed: at rear of premises adrop ladder of fire escape there are multiple garbage cans directly under ladder. remedy: comply with code
Nov 29, 2018
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35355779n issued on 9/5/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. failure to maintain egress
Oct 20, 2018 · Penalty $625
Resolve - Class - 1
Sec. 1001.34;27-361 failure to maintain egress clear & unobstructed. noted: at rear of premises approx 20cu ft of house hold debris & trash obstructs passageway from 401 crescent street rear fire escape to the
Sep 5, 2018 · Penalty $1,250
Resolve - Class - 2
Unapproved unsafe unsuitable electrical equipment apparatus devices materials appliances wiring in use. 8'indoor fluorescent fixtures use outdoor under awning. rmdy: comply with ec code.
Dec 31, 2013 · Penalty $400
Active - Non-hazardous
B4a,19b,32a,50a,b,c,d,36. 50a no fusable link fire damper on fresh airintake. 50b. pipe back flow preventor discharge down mid threaded end 50c. relocate backflow preventor. 50d. boiler room not a storage room.
Feb 12, 2008 · Penalty $350
Active - Non-hazardous
19b5050a. 50 missing discharge pipe on pop safety value. 50a missing backflow/ check valve on boiler feed line.
Jan 28, 2008
Resolve - Non-hazardous
Work without a permit owrk noted: construction of 244 and plywood floor 1st at rear of store creating a loft. remedy: obtain a permit if feasible or remove the illegal floor
Apr 9, 1997
Resolve
Complaints
- Unsanitary condition
Sewage
Aug 27, 2021 · Apt BLDG
Close - Safety
Fire escape
Aug 27, 2021 · Apt BLDG
Close - Outside building
Roof door/hatch
Aug 27, 2021 · Apt BLDG
Close - Safety
Fire escape
Aug 11, 2021 · Apt BLDG
Close - Outside building
Roof door/hatch
Jun 2, 2020 · Apt BLDG
Close - Outside building
Roof door/hatch
Jun 2, 2020 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 8, 2019 · Apt BLDG
Close - Safety
Window guard broken/missing
Oct 29, 2018 · Apt 2
Close - Door/window
Door
Oct 16, 2018 · Apt 1R
Close - Door/window
Door
Dec 23, 2016 · Apt 2
Close
Show 40 more ↓
- Safety
Fire escape
Dec 23, 2016 · Apt 2
Close - Safety
Smoke detector
Dec 23, 2016 · Apt 2
Close - Safety
Carbon monoxide detector
Dec 23, 2016 · Apt 2
Close - Safety
Window guard broken/missing
Dec 23, 2016 · Apt 2
Close - Heating
Heat related
Feb 8, 2010 · Apt 2
Close - General
Doors
Feb 8, 2010 · Apt 2
Close - General
Floor
Feb 8, 2010 · Apt 2
Close - Paint/plaster
Wall
Feb 8, 2010 · Apt 2
Close - Appliance
Electric/gas range
Feb 8, 2010 · Apt 2
Close - Appliance
Electric/gas range
Jan 18, 2010 · Apt 2
Close - Heating
Heat related
Jan 18, 2010 · Apt 2
Close - Heating
Heat related
Feb 13, 2009 · Apt 2FL
Close - Heating
Heat-plant
Dec 30, 2008 · Apt 1R
Close - Heating
Heat related
Dec 30, 2008 · Apt 1R
Close - Heating
Heat related
Dec 4, 2008 · Apt 2
Close - General
Floor
Apr 11, 2008 · Apt 1R
Close - General
Floor
Apr 11, 2008 · Apt 1R
Close - General
Windows
Apr 7, 2008 · Apt 1R
Close - Electric
Wiring
Apr 7, 2008 · Apt 1R
Close - General
Windows
Apr 7, 2008 · Apt 1R
Close - General
Windows
Apr 7, 2008 · Apt 1R
Close - Plumbing
Toilet
Apr 7, 2008 · Apt 1R
Close - Nonconst
Vermin
Apr 7, 2008 · Apt 1R
Close - Nonconst
Vermin
Apr 7, 2008 · Apt 1R
Close - Plumbing
Basin/sink
Apr 7, 2008 · Apt 1R
Close - Appliance
Electric/gas range
Apr 7, 2008 · Apt 1R
Close - General
Floor
Apr 7, 2008 · Apt 1R
Close - General
Floor
Apr 7, 2008 · Apt 1R
Close - Plumbing
Water-leaks
Apr 7, 2008 · Apt 1R
Close - Electric
Wiring
Apr 7, 2008 · Apt 1R
Close - Heating
Heat related
Apr 7, 2008 · Apt 1R
Close - Electric
Wiring
Apr 7, 2008 · Apt 1R
Close - Heating
Heat related
Mar 8, 2008 · Apt 2
Close - Heating
Heat related
Feb 19, 2008 · Apt 2
Close - Heating
Heat related
Feb 6, 2008 · Apt 1R
Close - Plumbing
Radiator
Dec 17, 2007 · Apt 1R
Close - Heating
Heat related
Dec 17, 2007 · Apt 1R
Close - Heating
Heat related
Dec 7, 2007 · Apt 1R
Close - General
Stairs
Dec 7, 2007 · Apt 1R
Close - Nonconst
Vermin
Dec 7, 2007 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1910
- Floors
- 3
- Residential units
- 2
- Building area
- 3,120 ft²
- Lot area
- 1,700 ft²
- Zoning
- R5
- Community board
- 305
- Council district
- 37
- Block / lot
- 4170 / 1
- Assessed value
- $47,880
- Landmark / historic district
- No
HPD registration #307826, last renewed Jul 3, 2025.
Questions about 403 Crescent Street
Who owns 403 Crescent Street?
The owner of record in NYC Department of City Planning PLUTO data is 403 Crescent LLC.
Does 403 Crescent Street have violations?
Yes. NYC HPD has recorded 99 housing violations at this property.
Is 403 Crescent Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 403 Crescent Street built?
City records list 1910 as the year it was built.
How many apartments are in 403 Crescent Street?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.