roofy

403 Crescent Street

Brooklyn, NY 11208BBL 3-04170-0001Map

Owner of record: 403 Crescent LLC

403 Crescent Street is a mixed residential and retail building built in 1910 in Brooklyn, 11208. It has 2 residential units across 3 floors. The owner of record is 403 Crescent LLC. HPD has recorded 99 housing violations here, most recently on May 4, 2026. 16 of the 50 most recent violations are still open.

HPD violations
99
DOB violations
21
ECB violations
22
HPD complaints
160

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 99

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 9, 2025

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 9, 2024

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 22, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 24, 2022

    Closed — Violation dismissed
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Oct 22, 2021

    Open — Invalid certification
  • B

    M/d law abate the nuisance consisting of rubbish obstructing the drop ladder at south exterior wall fire escape

    Aug 18, 2021

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the ... yard at south

    Aug 18, 2021

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 8, 2021

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Jun 14, 2020

    Open — Nov sent out
Show 40 more ↓
  • B

    Remove all encumbrances consisting of household items at public hall, 3rd story

    Jun 14, 2020

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story

    Jun 14, 2020

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story

    Jun 14, 2020

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jun 14, 2020

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Jun 14, 2020

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Jun 14, 2020

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 29, 2019

    Closed — Violation dismissed
  • B

    Remove the illegal fastening lockable slide bolt at bulkhead door to roof

    Oct 26, 2018

    Open — Nov sent out
  • B

    Arrange and make self-closing the doors .. at boiler room

    Oct 26, 2018

    Open — Nov sent out
  • B

    Arrange and make self-closing the doors at bulkhead roof

    Oct 26, 2018

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 21, 2017

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 2nd window frame from east at south wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 2nd window frame from east at south wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 5th room from east at north, the 5th room from east at south located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • C

    Replace with new the broken or defective glass pane at lower sash of 2nd window at south in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 5th room from east at north located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, west wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall, 1st door frame from south at west wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from east at north located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from east at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    Dec 31, 2016 · Apt 2

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tile and sagging subfloor in the bathroom located at apt 2, 2nd story, apartment at east

    Dec 27, 2016 · Apt 2

    Closed — Violation closed
  • C

    Replace with new the broken or defective window pane in the lower sash of the west window on the south wall in the 4th room from east located at apt 2, 2nd story, apartment at east

    Dec 27, 2016 · Apt 2

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Dec 27, 2016

    Open — Not complied with
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box (missing) at public hall, 1st story

    Dec 27, 2016

    Open — Not complied with
  • C

    Remove the illegal fastening double cylinder key-operated locking device on gate at front areaway, 1st story

    Dec 27, 2016

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ... in the entire apartment located at apt 2, 2nd story, apartment at east

    Dec 27, 2016 · Apt 2

    Closed — Violation closed
  • B

    Repair or replace the smoke detector (defective) at entire apartment, 2nd story, apartment

    Dec 27, 2016 · Apt 2

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). (missing) at entire apartment, 2nd story, apartment

    Dec 27, 2016 · Apt 2

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6; wg to replace = 0; wg to repair = 2; window guards must be installed with one-way screws and stops at entire apartment, 2nd story, apartment

    Dec 27, 2016 · Apt 2

    Closed — Violation closed

DOB building violations · 21

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 30, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 30, 2022

    Dob violation - dismissed
Show 11 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 30, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 4, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 26, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 28, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed

ECB violations · 22

  • Class - 2

    Wwop. at time of inspection observed from exterior sidewalk cellar door, a male and female working in cellar level below store front installing full height partitions with sheetrock and insulation. (denied acce

    Jul 26, 2022 · Penalty $1,280

    Active
  • Class - 2

    Work does not conform to approved construction documents.note:at the time of my inspection of a 3 story bldg w/an erected sidewalk shed at the bldgs exp.#1 & #4 w/an erected supported scaffold at the bldgs exp

    Mar 18, 2022

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specification.note:at the of my inspection of a 3 story bldg w/an erected sidewalk shed at the bldgs exp.#1 & #4 w/an erected supported scaffold on top of sidewalk.i obs

    Mar 18, 2022

    Resolve
  • Class - 1

    Bc3307.2.1 obstruction of street w/o dot permit.at time of inspection of 4 story building observed debris container/dumpster on street at exp #4.reseach in dept records revealed no dot permit issued for obstruc

    Dec 27, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Unqualified supervisor or workers performing work on scaffold.at time of inspection of active jobsite observed work in progress on supported scaffold at exp #4 for facade alteration.request for scaffold user ce

    Dec 27, 2021 · Penalty $5,000

    Resolve
  • Class - 1

    Unlawfully continued work while on notice of a stop work order.at time of inspection of active jobsite observed workers performing work on supported scaffold at exp #4 for facade repair.check in bis alerted me

    Dec 27, 2021 · Penalty $5,000

    Active
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#39046175z issued on 08/18/21 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a cert of c

    Oct 8, 2021 · Penalty $3,125

    Resolve
  • Class - 1

    At exposure 4, fire escape drop ladder obstructed with debris at base of ladder, also noted drop ladder directly above metal fence with zero clearance., remove obstruction

    Aug 18, 2021 · Penalty $625

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons#violation#35507927x issued on 05-25-21 and to file a certificate or correction pursuan to 28-201.1 and 1rcny 102-01.for: failure to maintain

    Jul 23, 2021 · Penalty $1,280

    Resolve
  • Class - 1

    Failure to maintain building in compliant manner at the time of my inspection observed at exp #4 fire escape stored flower pots,household items broeken.remove or repair

    May 25, 2021 · Penalty $1,250

    Resolve
Show 12 more ↓
  • Class - 1

    Unlawfully continued work while in notice of a stop work order.noted at time of inspection observed work in progress on facade at exp4.the brick work is being done by 3 workers who leave the site when i arrived

    May 7, 2021 · Penalty $5,000

    Resolve
  • Class - 2

    Work without a permit.note:at time of inspection observed brick work approx 4ft height by 15ft wide at above premise with no footing detailsand hanging details.no permit on file with the dept of buildings to at

    May 5, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35407876r issued on 04-02-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to provide unobstructed exit passageway. remedy: comply

    Jun 8, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway. noted;at time of inspection found fire escape at exposure 4 right side of building fire escape ladder drops directly onto metal fence w/ zero clearance w/ restau

    Apr 2, 2019 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order contained in summons/violation#35372545p issued on 11/29/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for obstructing the egres

    Jan 4, 2019 · Penalty $3,125

    Resolve
  • Class - 1

    Failure to maintain egress clear & unobstructed: at rear of premises adrop ladder of fire escape there are multiple garbage cans directly under ladder. remedy: comply with code

    Nov 29, 2018

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order contained in summons/violation#35355779n issued on 9/5/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. failure to maintain egress

    Oct 20, 2018 · Penalty $625

    Resolve
  • Class - 1

    Sec. 1001.34;27-361 failure to maintain egress clear & unobstructed. noted: at rear of premises approx 20cu ft of house hold debris & trash obstructs passageway from 401 crescent street rear fire escape to the

    Sep 5, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Unapproved unsafe unsuitable electrical equipment apparatus devices materials appliances wiring in use. 8'indoor fluorescent fixtures use outdoor under awning. rmdy: comply with ec code.

    Dec 31, 2013 · Penalty $400

    Active
  • Non-hazardous

    B4a,19b,32a,50a,b,c,d,36. 50a no fusable link fire damper on fresh airintake. 50b. pipe back flow preventor discharge down mid threaded end 50c. relocate backflow preventor. 50d. boiler room not a storage room.

    Feb 12, 2008 · Penalty $350

    Active
  • Non-hazardous

    19b5050a. 50 missing discharge pipe on pop safety value. 50a missing backflow/ check valve on boiler feed line.

    Jan 28, 2008

    Resolve
  • Non-hazardous

    Work without a permit owrk noted: construction of 244 and plywood floor 1st at rear of store creating a loft. remedy: obtain a permit if feasible or remove the illegal floor

    Apr 9, 1997

    Resolve

Complaints

  • Unsanitary condition

    Sewage

    Aug 27, 2021 · Apt BLDG

    Close
  • Safety

    Fire escape

    Aug 27, 2021 · Apt BLDG

    Close
  • Outside building

    Roof door/hatch

    Aug 27, 2021 · Apt BLDG

    Close
  • Safety

    Fire escape

    Aug 11, 2021 · Apt BLDG

    Close
  • Outside building

    Roof door/hatch

    Jun 2, 2020 · Apt BLDG

    Close
  • Outside building

    Roof door/hatch

    Jun 2, 2020 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 8, 2019 · Apt BLDG

    Close
  • Safety

    Window guard broken/missing

    Oct 29, 2018 · Apt 2

    Close
  • Door/window

    Door

    Oct 16, 2018 · Apt 1R

    Close
  • Door/window

    Door

    Dec 23, 2016 · Apt 2

    Close
Show 40 more ↓
  • Safety

    Fire escape

    Dec 23, 2016 · Apt 2

    Close
  • Safety

    Smoke detector

    Dec 23, 2016 · Apt 2

    Close
  • Safety

    Carbon monoxide detector

    Dec 23, 2016 · Apt 2

    Close
  • Safety

    Window guard broken/missing

    Dec 23, 2016 · Apt 2

    Close
  • Heating

    Heat related

    Feb 8, 2010 · Apt 2

    Close
  • General

    Doors

    Feb 8, 2010 · Apt 2

    Close
  • General

    Floor

    Feb 8, 2010 · Apt 2

    Close
  • Paint/plaster

    Wall

    Feb 8, 2010 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Feb 8, 2010 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Jan 18, 2010 · Apt 2

    Close
  • Heating

    Heat related

    Jan 18, 2010 · Apt 2

    Close
  • Heating

    Heat related

    Feb 13, 2009 · Apt 2FL

    Close
  • Heating

    Heat-plant

    Dec 30, 2008 · Apt 1R

    Close
  • Heating

    Heat related

    Dec 30, 2008 · Apt 1R

    Close
  • Heating

    Heat related

    Dec 4, 2008 · Apt 2

    Close
  • General

    Floor

    Apr 11, 2008 · Apt 1R

    Close
  • General

    Floor

    Apr 11, 2008 · Apt 1R

    Close
  • General

    Windows

    Apr 7, 2008 · Apt 1R

    Close
  • Electric

    Wiring

    Apr 7, 2008 · Apt 1R

    Close
  • General

    Windows

    Apr 7, 2008 · Apt 1R

    Close
  • General

    Windows

    Apr 7, 2008 · Apt 1R

    Close
  • Plumbing

    Toilet

    Apr 7, 2008 · Apt 1R

    Close
  • Nonconst

    Vermin

    Apr 7, 2008 · Apt 1R

    Close
  • Nonconst

    Vermin

    Apr 7, 2008 · Apt 1R

    Close
  • Plumbing

    Basin/sink

    Apr 7, 2008 · Apt 1R

    Close
  • Appliance

    Electric/gas range

    Apr 7, 2008 · Apt 1R

    Close
  • General

    Floor

    Apr 7, 2008 · Apt 1R

    Close
  • General

    Floor

    Apr 7, 2008 · Apt 1R

    Close
  • Plumbing

    Water-leaks

    Apr 7, 2008 · Apt 1R

    Close
  • Electric

    Wiring

    Apr 7, 2008 · Apt 1R

    Close
  • Heating

    Heat related

    Apr 7, 2008 · Apt 1R

    Close
  • Electric

    Wiring

    Apr 7, 2008 · Apt 1R

    Close
  • Heating

    Heat related

    Mar 8, 2008 · Apt 2

    Close
  • Heating

    Heat related

    Feb 19, 2008 · Apt 2

    Close
  • Heating

    Heat related

    Feb 6, 2008 · Apt 1R

    Close
  • Plumbing

    Radiator

    Dec 17, 2007 · Apt 1R

    Close
  • Heating

    Heat related

    Dec 17, 2007 · Apt 1R

    Close
  • Heating

    Heat related

    Dec 7, 2007 · Apt 1R

    Close
  • General

    Stairs

    Dec 7, 2007 · Apt 1R

    Close
  • Nonconst

    Vermin

    Dec 7, 2007 · Apt 1R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S2)
Year built
1910
Floors
3
Residential units
2
Building area
3,120 ft²
Lot area
1,700 ft²
Zoning
R5
Community board
305
Council district
37
Block / lot
4170 / 1
Assessed value
$47,880
Landmark / historic district
No

HPD registration #307826, last renewed Jul 3, 2025.

Questions about 403 Crescent Street

Who owns 403 Crescent Street?

The owner of record in NYC Department of City Planning PLUTO data is 403 Crescent LLC.

Does 403 Crescent Street have violations?

Yes. NYC HPD has recorded 99 housing violations at this property.

Is 403 Crescent Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 403 Crescent Street built?

City records list 1910 as the year it was built.

How many apartments are in 403 Crescent Street?

It has 2 residential units and 3 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.