227 Richmond Street
Brooklyn, NY 11208BBL 3-04141-0009Map
Owner of record: Nachlas Richmond LLC
227 Richmond Street is a walk-up apartment building built in 1915 in Brooklyn, 11208. It has 4 residential units across 2 floors. The owner of record is Nachlas Richmond LLC. HPD has recorded 32 housing violations here, most recently on May 5, 2026. 9 of the 32 most recent violations are still open.
- HPD violations
- 32
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 19
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 32
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north
Feb 6, 2024 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north
Feb 6, 2024 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 6, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2023
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from south at west
Aug 30, 2023 · Apt 1L
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from south at west
Aug 30, 2023 · Apt 1L
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 6sqft at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from south at west
Aug 30, 2023 · Apt 1L
Closed — Violation closed
Show 22 more ↓
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 1l, 1st story, 1st apartment from south at west
Aug 30, 2023 · Apt 1L
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 6sqft at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from south at west original violation 16197336 issued 30-aug-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 30, 2023 · Apt 1L
Open — First no access to re- inspect violation - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 1, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 19, 2018
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceilings throughout in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north
Sep 17, 2006 · Apt 1L
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration accoustic suspended ceilings through out apartment in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north
Jun 21, 2006 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, 1st door frame from east at south wall, 2nd door frame from east at south wall, 1st radiator from west at north wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at north located at apt 1l, 1st story, 1st apartment from west at north
Jun 21, 2006 · Apt 1L
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the bathroom located at apt 1l, 1st story, 1st apartment from west at north
Jun 21, 2006 · Apt 1L
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, 1st door frame from east at south wall, 1st door frame from north at east wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 4th room from east located at apt 1l, 1st story, 1st apartment from west at north
Jun 21, 2006 · Apt 1L
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st door frame from south at west wall in the 3rd room from east located at apt 1l, 1st story, 1st apartment from west at north
Jun 21, 2006 · Apt 1L
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, 1st door frame from south at west wall in the 2nd room from east located at apt 1l, 1st story, 1st apartment from west at north
Jun 21, 2006 · Apt 1L
Open — Defect letter issued - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling west room 1 sty north apt 1r located at apt 1r, 1st story, section '' ''
Sep 30, 1999 · Apt 1R
Closed — Violation closed - BHazardous
Provide ventilation louvre boiler room cellar
Oct 22, 1990
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective plaster board ceiling thru out cellar
Oct 22, 1990
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of mattresses stored rear south cellar
Oct 22, 1990
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar thru out
Oct 22, 1990
Closed — Violation closed - BHazardous
Provide metal cover masonry pit front cellar
Oct 22, 1990
Closed — Violation closed - BHazardous
Properly repair the broken or defective paving rear yard
Oct 22, 1990
Closed — Violation closed - BHazardous
Install and maintain sufficient light or lights of at least 100 watts incandescent or equivalent each, to light adequately from sunset to sunrise the rear yard
Oct 22, 1990
Closed — Violation closed - BHazardous
Provide wire screen under skylight roof
Oct 22, 1990
Open — Not complied with - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system 1 sty public hall and on boiler room door
Oct 22, 1990
Open — Not complied with - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts night inspection
Oct 16, 1990
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Non-hazardous
Failure to maintain building. defect is: front step cracked, metal newel post for handrail loose and being held by hose clamp to fence. remedy: properly repair or replace metal newel post and cracked step.
Sep 6, 2000
Resolve
Complaints
- Heat/hot water
Entire building
Feb 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2024 · Apt BLDG
Close - General
Cooking gas
Jan 24, 2024 · Apt BLDG
Close - Paint/plaster
Ceiling
Aug 27, 2023 · Apt 1L
Close - Water leak
Slow leak
Aug 27, 2023 · Apt 1L
Close - Unsanitary condition
Mold
Aug 27, 2023 · Apt 1L
Close - Paint/plaster
Wall
Aug 27, 2023 · Apt 1L
Close - Door/window
Door
Jun 10, 2021 · Apt 2
Close - Door/window
Door
Jun 10, 2021 · Apt 2
Close - Unsanitary condition
Pests
Jun 10, 2021 · Apt 1R
Close
Show 9 more ↓
- Flooring/stairs
Stairs
Jul 8, 2019 · Apt 1L
Close - Paint/plaster
Ceiling
Jun 19, 2006 · Apt 1L
Close - General
Cabinet
Jun 19, 2006 · Apt 1L
Close - General
Windows
Jun 19, 2006 · Apt 1L
Close - General
Mold
Jun 19, 2006 · Apt 1L
Close - Electric
Wiring
Jun 19, 2006 · Apt 1L
Close - Electric
Wiring
Jun 19, 2006 · Apt 1L
Close - Nonconst
Vermin
Jun 19, 2006 · Apt 1L
Close - Nonconst
Vermin
Jun 19, 2006 · Apt 1L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1915
- Floors
- 2
- Residential units
- 4
- Building area
- 2,750 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6A
- Community board
- 305
- Council district
- 37
- Block / lot
- 4141 / 9
- Assessed value
- $222,750
- Landmark / historic district
- No
HPD registration #312897, last renewed Oct 29, 2025.
Questions about 227 Richmond Street
Who owns 227 Richmond Street?
The owner of record in NYC Department of City Planning PLUTO data is Nachlas Richmond LLC.
Does 227 Richmond Street have violations?
Yes. NYC HPD has recorded 32 housing violations at this property.
Is 227 Richmond Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 227 Richmond Street built?
City records list 1915 as the year it was built.
How many apartments are in 227 Richmond Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.