126 Grant Avenue
Brooklyn, NY 11208BBL 3-04122-0031Map
Owner of record: Chopra Parveen
126 Grant Avenue is a walk-up apartment building built in 1930 in Brooklyn, 11208. It has 20 residential units across 4 floors. The owner of record is Chopra Parveen. HPD has recorded 971 housing violations here, most recently on August 26, 2026. 33 of the 50 most recent violations are still open.
- HPD violations
- 971
- DOB violations
- 6
- ECB violations
- 3
- HPD complaints
- 1,860
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 971
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall, south wall, 1st window frame from west at north wall, 1st window frame from south at west wall in the 1st room from north located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall, south wall in the bathroom located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, 1st window frame from south at west wall in the bathroom located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from south at west wall in the 3rd room from north located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the foyer located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, north wall, 1st window frame from south at west wall in the kitchen located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at north wall, ceiling in the 1st room from north located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, west wall, east wall in the kitchen located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the bathroom located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wood door at entrance in the 1st room from north located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective door knob in the entrance located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperative in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperative in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by the method of reglazing at bathtub in the bathroom located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from south at west wall, 2nd window frame from south at west wall in the 3rd room from north located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st closet from west at north wall door in the foyer located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall, east wall in the kitchen located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over ceiling ceiling in the 1st room from north located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at north wall in the 1st room from north located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 4d, 4th story, 1st apartment from west at north
Aug 26, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower window sash spring balance at intermediate landing between 2nd and 3rd story ,southwall at public hall stairs, 3rd story
Aug 20, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire rated material at ceiling all troughout at cellar
Aug 17, 2026
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at light fixtures at ceiling in the public hall located at public parts 2c, 3rd story, 1st public parts from east at south
Aug 17, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective connection under lower kitchen sink in the kitchen located at apt 2c, 3rd story, 1st apartment from east at south
Aug 17, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at kitchen sink in the kitchen located at apt 2c, 3rd story, 1st apartment from east at south
Aug 17, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2c, 3rd story
Aug 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch at vestibule door at public hall, 1st story
Mar 14, 2026
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room, 1st story
Mar 14, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Mar 14, 2026 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches at public hall, 1st story
Mar 14, 2026
Open — Defect letter issued - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement
Dec 6, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Dec 6, 2025 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective apartments 1d, d2, and 1b mailboxes at public hall, 1st story
Aug 29, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at 1st public hall bulkhead from east
Aug 29, 2025
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling at 1st public hall bulkhead from east
Aug 29, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at 1st public hall bulkhead from east
Aug 29, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock at the building entrance door at public hall, 1st story
Aug 21, 2025
Closed — Violation closed - CImmediately hazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at the rear yard
Aug 21, 2025
Closed — Violation closed - CImmediately hazardous
Replace with new the missing building entrance door knob at public hall, 1st story
Aug 19, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective vestibule door lock at public hall, 1st story
Aug 19, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective at vestibule entrance door lock at public hall, 1st story
Jul 14, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective vestibule door lock at public hall, 1st story
Jun 23, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock set at the vestibule door at public hall, 1st story
May 20, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from east at south located at apt 1a, 1st story, 1st apartment from north at east
Apr 21, 2025 · Apt 1A
Open — Nov sent out - BHazardous
Replace with new the missing escutcheon plate around steam pipe at ceiling and floor in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Apr 21, 2025 · Apt 1A
Open — Nov sent out
DOB building violations · 6
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 16, 2022
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active
ECB violations · 3
- Class - 1
Failure to maintain building in code-compliant manner. at time of inspection observed cracks on walls, majority of floors are uneven & slopping with deflection. at expos #2/3 fire escape pathway obstructed by c
Dec 22, 2021 · Penalty $312
Resolve - Non-hazardous
34a,34b,32a,32b,50.b4a. install pigtail on steam guage pipe hot water relief discharge down no threaded end holes in boiler room walls & ceiling med to be sealed. flue pipe meed support screws, fumes already fi
Dec 10, 2003 · Penalty $350
Active - Non-hazardous
Failure to maintain building interior defect is:cracked and missing plaster ceiling in bathroom apt.5a first floor north east,remedy:replace the missing ceiling
Nov 13, 2001
Resolve
Complaints
- Heat/hot water
Entire building
Oct 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2026 · Apt BLDG
Close - Water leak
Slow leak
Oct 16, 2026 · Apt 1A
Close - Plumbing
Bathtub/shower
Sep 9, 2026 · Apt 1A
Close - Plumbing
Bathtub/shower
Sep 8, 2026 · Apt 1A
Close - Plumbing
Bathtub/shower
Sep 7, 2026 · Apt 1A
Close - Unsanitary condition
Sewage
Sep 5, 2026 · Apt 1A
Close - Plumbing
Bathtub/shower
Sep 3, 2026 · Apt 1A
Close - General
Janitor/super
Sep 1, 2026 · Apt 1A
Close - Unsanitary condition
Sewage
Sep 1, 2026 · Apt 1A
Close
Show 40 more ↓
- Plumbing
Basin/sink
Aug 31, 2026 · Apt 1A
Close - Unsanitary condition
Sewage
Aug 29, 2026 · Apt 1A
Close - Plumbing
Bathtub/shower
Aug 29, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Aug 23, 2026 · Apt 4D
Close - Plumbing
Bathtub/shower
Aug 23, 2026 · Apt 4D
Close - Heat/hot water
Entire building
Aug 18, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Aug 17, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Aug 17, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Aug 17, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Aug 16, 2026 · Apt 1A
Close - Plumbing
Water supply
Aug 15, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Aug 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 15, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Aug 15, 2026 · Apt 1A
Close - Appliance
Refrigerator
Aug 4, 2026 · Apt 5C
Close - Heat/hot water
Apartment only
Jul 30, 2026 · Apt 1A
Close - Plumbing
Water supply
Jul 29, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Jul 28, 2026 · Apt 1A
Close - Plumbing
Water supply
Jul 27, 2026 · Apt 1A
Close - Plumbing
Toilet
Jun 11, 2026 · Apt 4A
Close - Plumbing
Toilet
Jun 1, 2026 · Apt 4A
Close - Unsanitary condition
Mold
Jun 1, 2026 · Apt 4A
Close - Door/window
Window frame
Jun 1, 2026 · Apt 4A
Close - Paint/plaster
Wall
Jun 1, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Apr 11, 2026 · Apt 1A
Close - Paint/plaster
Wall
Apr 6, 2026 · Apt 4A
Close - Paint/plaster
Wall
Mar 31, 2026 · Apt 4A
Close - Heat/hot water
Entire building
Mar 27, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Mar 13, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Mar 3, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Mar 2, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Mar 2, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Feb 16, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 9, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Feb 9, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Feb 1, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 29, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1930
- Floors
- 4
- Residential units
- 20
- Building area
- 15,600 ft²
- Lot area
- 5,000 ft²
- Zoning
- R5
- Community board
- 305
- Council district
- 37
- Block / lot
- 4122 / 31
- Assessed value
- $393,300
- Landmark / historic district
- No
HPD registration #302376, last renewed Aug 25, 2025.
Questions about 126 Grant Avenue
Who owns 126 Grant Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Chopra Parveen.
Does 126 Grant Avenue have violations?
Yes. NYC HPD has recorded 971 housing violations at this property.
Is 126 Grant Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 126 Grant Avenue built?
City records list 1930 as the year it was built.
How many apartments are in 126 Grant Avenue?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.