roofy

126 Grant Avenue

Brooklyn, NY 11208BBL 3-04122-0031Map

Owner of record: Chopra Parveen

126 Grant Avenue is a walk-up apartment building built in 1930 in Brooklyn, 11208. It has 20 residential units across 4 floors. The owner of record is Chopra Parveen. HPD has recorded 971 housing violations here, most recently on August 26, 2026. 33 of the 50 most recent violations are still open.

HPD violations
971
DOB violations
6
ECB violations
3
HPD complaints
1,860

What to know

Concern
15 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 26, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 971

  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall, south wall, 1st window frame from west at north wall, 1st window frame from south at west wall in the 1st room from north located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall, south wall in the bathroom located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, 1st window frame from south at west wall in the bathroom located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from south at west wall in the 3rd room from north located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the foyer located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, north wall, 1st window frame from south at west wall in the kitchen located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the baseboard at north wall, ceiling in the 1st room from north located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the south wall, west wall, east wall in the kitchen located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the west wall in the bathroom located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective wood door at entrance in the 1st room from north located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair or replace the broken or defective door knob in the entrance located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperative in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperative in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish by the method of reglazing at bathtub in the bathroom located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 2nd window frame from south at west wall, 2nd window frame from south at west wall in the 3rd room from north located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st closet from west at north wall door in the foyer located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall, east wall in the kitchen located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • C

    Repair the roof so that it will not leak over ceiling ceiling in the 1st room from north located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the baseboard at north wall in the 1st room from north located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 4d, 4th story, 1st apartment from west at north

    Aug 26, 2026 · Apt 4D

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective lower window sash spring balance at intermediate landing between 2nd and 3rd story ,southwall at public hall stairs, 3rd story

    Aug 20, 2026

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire rated material at ceiling all troughout at cellar

    Aug 17, 2026

    Open — Nov sent out
  • B

    Provide a safe and adequate supply of electric service to the fixtures at light fixtures at ceiling in the public hall located at public parts 2c, 3rd story, 1st public parts from east at south

    Aug 17, 2026 · Apt 2C

    Open — Nov sent out
  • B

    Repair the broken or defective connection under lower kitchen sink in the kitchen located at apt 2c, 3rd story, 1st apartment from east at south

    Aug 17, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures at kitchen sink in the kitchen located at apt 2c, 3rd story, 1st apartment from east at south

    Aug 17, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2c, 3rd story

    Aug 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective latch at vestibule door at public hall, 1st story

    Mar 14, 2026

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room, 1st story

    Mar 14, 2026

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east

    Mar 14, 2026 · Apt 1A

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches at public hall, 1st story

    Mar 14, 2026

    Open — Defect letter issued
  • C

    Provide ready access to buildings heating system door locked at basement

    Dec 6, 2025

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east

    Dec 6, 2025 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective apartments 1d, d2, and 1b mailboxes at public hall, 1st story

    Aug 29, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at 1st public hall bulkhead from east

    Aug 29, 2025

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at ceiling at 1st public hall bulkhead from east

    Aug 29, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at 1st public hall bulkhead from east

    Aug 29, 2025

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective mortise lock at the building entrance door at public hall, 1st story

    Aug 21, 2025

    Closed — Violation closed
  • C

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at the rear yard

    Aug 21, 2025

    Closed — Violation closed
  • C

    Replace with new the missing building entrance door knob at public hall, 1st story

    Aug 19, 2025

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective vestibule door lock at public hall, 1st story

    Aug 19, 2025

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective at vestibule entrance door lock at public hall, 1st story

    Jul 14, 2025

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective vestibule door lock at public hall, 1st story

    Jun 23, 2025

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 9, 2025

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective mortise lock set at the vestibule door at public hall, 1st story

    May 20, 2025

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective wood floor in the 3rd room from east at south located at apt 1a, 1st story, 1st apartment from north at east

    Apr 21, 2025 · Apt 1A

    Open — Nov sent out
  • B

    Replace with new the missing escutcheon plate around steam pipe at ceiling and floor in the bathroom located at apt 1a, 1st story, 1st apartment from north at east

    Apr 21, 2025 · Apt 1A

    Open — Nov sent out

DOB building violations · 6

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 16, 2022

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active

ECB violations · 3

  • Class - 1

    Failure to maintain building in code-compliant manner. at time of inspection observed cracks on walls, majority of floors are uneven & slopping with deflection. at expos #2/3 fire escape pathway obstructed by c

    Dec 22, 2021 · Penalty $312

    Resolve
  • Non-hazardous

    34a,34b,32a,32b,50.b4a. install pigtail on steam guage pipe hot water relief discharge down no threaded end holes in boiler room walls & ceiling med to be sealed. flue pipe meed support screws, fumes already fi

    Dec 10, 2003 · Penalty $350

    Active
  • Non-hazardous

    Failure to maintain building interior defect is:cracked and missing plaster ceiling in bathroom apt.5a first floor north east,remedy:replace the missing ceiling

    Nov 13, 2001

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Oct 21, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2026 · Apt BLDG

    Close
  • Water leak

    Slow leak

    Oct 16, 2026 · Apt 1A

    Close
  • Plumbing

    Bathtub/shower

    Sep 9, 2026 · Apt 1A

    Close
  • Plumbing

    Bathtub/shower

    Sep 8, 2026 · Apt 1A

    Close
  • Plumbing

    Bathtub/shower

    Sep 7, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Sewage

    Sep 5, 2026 · Apt 1A

    Close
  • Plumbing

    Bathtub/shower

    Sep 3, 2026 · Apt 1A

    Close
  • General

    Janitor/super

    Sep 1, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Sewage

    Sep 1, 2026 · Apt 1A

    Close
Show 40 more ↓
  • Plumbing

    Basin/sink

    Aug 31, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Sewage

    Aug 29, 2026 · Apt 1A

    Close
  • Plumbing

    Bathtub/shower

    Aug 29, 2026 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Aug 23, 2026 · Apt 4D

    Close
  • Plumbing

    Bathtub/shower

    Aug 23, 2026 · Apt 4D

    Close
  • Heat/hot water

    Entire building

    Aug 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Aug 17, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Aug 17, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Aug 17, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Aug 16, 2026 · Apt 1A

    Close
  • Plumbing

    Water supply

    Aug 15, 2026 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Aug 15, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Aug 15, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Aug 15, 2026 · Apt 1A

    Close
  • Appliance

    Refrigerator

    Aug 4, 2026 · Apt 5C

    Close
  • Heat/hot water

    Apartment only

    Jul 30, 2026 · Apt 1A

    Close
  • Plumbing

    Water supply

    Jul 29, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Jul 28, 2026 · Apt 1A

    Close
  • Plumbing

    Water supply

    Jul 27, 2026 · Apt 1A

    Close
  • Plumbing

    Toilet

    Jun 11, 2026 · Apt 4A

    Close
  • Plumbing

    Toilet

    Jun 1, 2026 · Apt 4A

    Close
  • Unsanitary condition

    Mold

    Jun 1, 2026 · Apt 4A

    Close
  • Door/window

    Window frame

    Jun 1, 2026 · Apt 4A

    Close
  • Paint/plaster

    Wall

    Jun 1, 2026 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Apr 11, 2026 · Apt 1A

    Close
  • Paint/plaster

    Wall

    Apr 6, 2026 · Apt 4A

    Close
  • Paint/plaster

    Wall

    Mar 31, 2026 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Mar 27, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Mar 13, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Mar 3, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Mar 2, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Mar 2, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Feb 16, 2026 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 9, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Feb 9, 2026 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt 2C

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Jan 29, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Jan 28, 2026 · Apt 1A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1930
Floors
4
Residential units
20
Building area
15,600 ft²
Lot area
5,000 ft²
Zoning
R5
Community board
305
Council district
37
Block / lot
4122 / 31
Assessed value
$393,300
Landmark / historic district
No

HPD registration #302376, last renewed Aug 25, 2025.

Questions about 126 Grant Avenue

Who owns 126 Grant Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Chopra Parveen.

Does 126 Grant Avenue have violations?

Yes. NYC HPD has recorded 971 housing violations at this property.

Is 126 Grant Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 126 Grant Avenue built?

City records list 1930 as the year it was built.

How many apartments are in 126 Grant Avenue?

It has 20 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.