631 Hendrix Street
Brooklyn, NY 11207BBL 3-04075-0001Map
Owner of record: Hendrix Realty LLC
631 Hendrix Street is a two-family home built in 1901 in Brooklyn, 11207. It has 2 residential units across 2 floors. The owner of record is Hendrix Realty LLC. HPD has recorded 216 housing violations here, most recently on April 4, 2026. 44 of the 50 most recent violations are still open.
- HPD violations
- 216
- DOB violations
- 12
- ECB violations
- 51
- HPD complaints
- 150
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 216
- BHazardous
Replace with new the missing base cabinet doors west in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Apr 4, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Apr 4, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at west and north walls in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Apr 4, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Apr 4, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures no volume in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Apr 4, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Apr 4, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Apr 4, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Apr 4, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Mar 5, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Mar 5, 2026 · Apt 1
Closed — Violation dismissed
Show 40 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jan 12, 2026
Open — Info nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and all walls in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Jan 9, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and all walls in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Jan 9, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Jan 9, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the private hallway located at apt 1, 1st story, 1st apartment from north at east
Jan 9, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the 3rd room from east located at apt 1, 1st story, 1st apartment from north at east
Jan 9, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and all walls in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Jan 9, 2026 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jan 9, 2026 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jan 9, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jan 9, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jan 9, 2026 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jan 9, 2026 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at cieling and all walls in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Jan 9, 2026 · Apt 1
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Sep 26, 2024
Open — Info nov sent out - CImmediately hazardous
Provide temporary seal up to all accessible openings in the entire apartment located at apt cc
Sep 23, 2024 · Apt CC
Closed — Violation closed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts # 4 vacate # 258770 at 5th cellar from east
Sep 13, 2024
Open — Info nov sent out - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts # 1 vacate # 258770 at 1st cellar from east at north
Sep 13, 2024
Open — Info nov sent out - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts #3 vacate # 258770 at 4th cellar from east
Sep 13, 2024
Open — Info nov sent out - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts # 2 vacate # 258770 at 3rd cellar from east
Sep 13, 2024
Open — Info nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections water closet , wash basin, bathtub and sink at cellar
Sep 4, 2024
Open — Nov sent out - BHazardous
Discontinue the rooming unit at 5th room from east at cellar
Sep 4, 2024
Open — Nov sent out - BHazardous
Discontinue the rooming unit at 6th room from east at cellar
Sep 4, 2024
Open — Nov sent out - BHazardous
Discontinue the rooming unit at 4th room from east at cellar
Sep 4, 2024
Open — Nov sent out - BHazardous
Discontinue the rooming unit at 1st room from east at south at cellar
Sep 4, 2024
Open — Nov sent out - BHazardous
§ 9, 170, 171, 300, 301, 302 m.d.law-file plans and application and obtain a certificate of occupancy to legalize the conversion from a private dwelling to multiple dwelling use if lawfully feasible or restore to lawful occupancy
Sep 4, 2024
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas stove at cellar
Sep 4, 2024
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective base cabinets at sink in the kitchen located at apt 1fl, 1st story, 1st apartment from north at east
Aug 20, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east
Aug 20, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from east at south located at apt 1fl, 1st story, 1st apartment from north at east
Aug 20, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 1fl, 1st story, 1st apartment from north at east
Aug 20, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 1fl, 1st story, 1st apartment from north at east
Aug 20, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1fl, 1st story, 1st apartment from north at east
Aug 20, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 1fl, 1st story, 1st apartment from north at east
Aug 20, 2024 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceilings and all walls in the entire apartment located at apt 1fl, 1st story, 1st apartment from north at east
Aug 20, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt 1fl, 1st story, 1st apartment from north at east
Aug 20, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1fl, 1st story, 1st apartment from north at east
Aug 20, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1fl, 1st story, 1st apartment from north at east
Aug 20, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling less than 20 sq ft in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east
Aug 20, 2024 · Apt 1FL
Open — First no access to re- inspect violation - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north at west located at apt 2, 2nd story
Nov 16, 2022 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 2, 2nd story
Nov 16, 2022 · Apt 2
Open — Nov sent out
DOB building violations · 12
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 19, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 25, 2018
Dob violation - dismissed - Construction other optional
Failure to maitnain building in a code comlaint manner. noted: occupancy does not comply with hmc 27-2075 in that there is not 80 sq ft of livable space per person throughout building current livable space/ sq ft is approximately 2080 sq ft & observed occupant load of 26 beds occupancy should not exceed maximum capacity of 16 beds
Apr 30, 2018
Dob violation - active - Construction other optional
Discontinue illegal use or amend c/o
Apr 6, 2017
Vp-violation unserved ecb-active - Construction other optional
Obtain all required permits or restore prior legal condition
Apr 6, 2017
Vpw-violation unserved ecb-work without permit-active - Construction other optional
@ time of inspection observed @ 1st floor level kitchen water damage & peneration on ceiling & water, also floor has a 1/2 sink hole near rear yard door
Jan 17, 2017
Dob violation - active - Construction other optional
Failure to maintain building in code complaint manner, use of prohibited door &/or hardware per bc1008.1.8. 23-371(j), note: on door through-out the basement, 1st & 2nd floor illegal hardward deadbolt & other locking devices
Jan 17, 2017
Dob violation - active
Show 2 more ↓
- Construction other optional
Note: @ basement level (2) additional lighting fixtures created spliced from exisiting fixtures
Jan 17, 2017
Vw-violation work without permit - active - Construction other optional
Occupancy contrary to that allowed by c of o or building department records. note: hpd records #310538 indicate (2) a units on 1st & 2nd floor @ inspection @ basement level half kitchen, full bath & bedroom with electrical appliances & personal effects. as also 27 beds observed 16 max occupancy exceeds maz limits
Jan 17, 2017
Dob violation - active
ECB violations · 51
- Class - 1
Failure to maintain building in code compliant manner; observed servere cracks in interior walls at first floor. multiple voids in fireproofing exposing floor joists. flooring at 2nd floor concaving., repair an
Oct 7, 2026 · Penalty $6,250
Active - Class - 1
Failure to obey a vacate order from the commissioner; observed 4 male and 1 female occupants occupying the entire house., comply with vacate order
Oct 7, 2026 · Penalty $25,000
Active - Class - 2
Failure to maintain building in code compliant manner; at exp 3 (rear yard) observed stucco is dislodged from building exposing brick and mortar to weather elements., repair and/or replace
Oct 7, 2026 · Penalty $1,250
Active - Class - 1
Failure to provide unobstructed exit passageway; observed exit from cellar obstructed by 55 gallon drum. also found fire escape at exp 3 obstructed with house hold items., remove obstruction
Oct 7, 2026 · Penalty $6,250
Active - Class - 1
Failure to maintain building in code-compliant manner. observed breaches in fire stopping in cellar bathroom, cellar boiler room with exposed bx cable. cracks in sheetrock at 1st and 2nd floor., repair and/repl
Apr 29, 2026 · Penalty $25,000
Active - Class - 1
Failure to provide unobstructed exit passageway. observed at cellar level door leading to front of house blocked with large amounts of household items and garbage barricading egress door., remove obstruction
Apr 29, 2026 · Penalty $12,500
Active - Class - 1
Failure to obey a vacate order from the commissioner per 28-207.4. premises has partial vacate order vac b116/17 for cellar at time of inspection cellar occupied with 1 male, 2 beds, kitchen and 3 piece bathroo
Apr 29, 2026 · Penalty $25,000
Active - Class - 1
Failure to maintain building in code compliant manner; observed in illegal class a apartment in cellar a gas leak due to faulty gas connections to gas stove. effecting tenants in cellar and floors 1 and 2. this
Apr 29, 2026 · Penalty $12,500
Active - Class - 1
At time of inspection, observed a first-floor level above basement entrance is a cracked stone lintel, and at second floor-level is an ac unit installed without a bracket. conditions are causing possible overhe
Oct 27, 2025 · Penalty $12,500
Active - Class - 2
Failure to certify correction. failure to comply with commissioner's order to file a certificate of correction with the department of buildings, contained in summons 35483403l., file a certificate of correction
Oct 23, 2025 · Penalty $6,250
Active
Show 40 more ↓
- Class - 2
Failure to certify correction. failure to comply with commissioner's order to file a certificate of correction with the department of buildings, contained in summons 39072803j., file a certificate of correction
Oct 23, 2025 · Penalty $6,250
Active - Class - 2
Failure to certify correction. failure to comply with commissioner's order to file a certificate of correction with the department of buildings, contained in summons 39121444p., file a certificate of correction
Oct 23, 2025 · Penalty $6,250
Active - Class - 1
Failure to maintain building in code-compliant manner. noted: 1st flr bthrm and part of kitchen ceiling collapsed due to water damage, ceiling throughout has water damage, extensive cracks throughout hallway, d
Sep 3, 2025 · Penalty $12,500
Active - Class - 1
Failure to obey a vacate order from the commissioner per 28-207.4. premises has partial vacate order vac b116/17 for basement. at time of inspection basement occupied with 2 males and 2 females with 4 beds, clo
Sep 3, 2025 · Penalty $25,000
Active - Class - 1
Occupancy contrary to that allowed by cofo and/or the department of buildings records.partition erected such as illegal sro room at cellar.rooms used for living.unlawful gas running on kitchen sink present also
Sep 4, 2024 · Penalty $12,500
Active - Class - 2
Failure to maintain building in code-compliant manner. at 1st floor kitchen and hallway doorways and ceiling multiple cracks, ceiling also has water penetration and mold, posing hazards., repair and/or replace
Aug 9, 2024 · Penalty $3,125
Active - Class - 2
Observed at cellar level, the room at the front of the building have 2 electrical panels that are missing covers. leaving the wires and components exposed. creating a hazardous condition and risk for electrocut
Oct 26, 2022 · Penalty $3,125
Active - Class - 2
Failure to maintain building in code compliant manner.at time of inspection noted:at 2nd floor missing section of ceiling aprox 5 sq ft dur to ongoing water penetration also at 2nd fl kitchen area has flooring
Dec 1, 2021 · Penalty $3,125
Active - Class - 2
Occupancy contrary to that allowed by the c of o or dob records. failure to comply w/the comm's order contained in summons/vio#35461184n issued on 10/29/19 & to file a cert of correction pursuant to 28-201.1 &
Aug 18, 2021 · Penalty $5,000
Resolve - Class - 1
Work w/o a permit. failure to comply w/the comm's order contained in summons/vio#35422430h issued on 05/08/19 & to file a cert of correctionpursuant to 28-201.1 & 1rcny 102-01. previous ecb#35532114n.
Aug 18, 2021 · Penalty $12,500
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/v35461184n issued10/29/19&to file c/c pursuant to28-201.1&1rcny102-01.comply w/commissioner's order &/or file c/c.
Jun 22, 2021 · Penalty $3,125
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#35422430h issued on 5/8/2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for b101:work w/o permit
Jun 8, 2021 · Penalty $12,500
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#35422430h issued on 5/8/2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for work without a permi
Apr 14, 2021 · Penalty $12,500
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35461184n issued on 10/29/2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for illegal occupancy
Apr 8, 2021 · Penalty $3,125
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#35422430h issued on 5/8/2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for work without a permi
Mar 2, 2021 · Penalty $12,500
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35461184n issued on 10/29/2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for occupancy contrary
Feb 9, 2021 · Penalty $3,125
Resolve - Class - 1
Work w/out a permit failure to comply w/the commissioner's order contained in summons/violation #35422430h issued on 05/08/19 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.previous
Nov 6, 2020 · Penalty $12,500
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/vio#35461184n issued on 10/29/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. occupancy contrary. remedy:comp
Oct 20, 2020 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/the commissioner's order contained in summons/violation #35461184n issued on 10/29/19 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.for occupancy contrary at cell
Sep 14, 2020 · Penalty $3,125
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35422430h issued on 05/08/19 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. for work w/o permit @ cellar level. remedy: comply
Aug 20, 2020 · Penalty $12,500
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35461184n issued on 10-29-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. occupancy contrary to that allowed by the c of o of dob records
Jan 31, 2020 · Penalty $3,125
Resolve - Class - 1
Failure to comply with commissioners order contained in summons/violation #35422430h issued on 05-08-2019 and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01.at cellar level erected fu
Jan 4, 2020 · Penalty $12,500
Resolve - Class - 2
Failure to maintain building in code compliant manner.at time of inspection at 2nd floor kitchen was exposed sub working new flooring with 2 ceiling located units are damaged due to water subtraition at 2nd fl
Dec 18, 2019 · Penalty $3,125
Active - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35422430h issued on 05/08/19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit at cellar level. remedy: comply w/comm's orde
Oct 29, 2019 · Penalty $12,500
Resolve - Class - 1
Occupancy contrary to that allowed by the cofc of dob records.noted:legal 2 family(1st & 2nd floors)cellar(boiler,storage only)premises now occupied as a 3/4 house program.illegally occupied in cellar w/3pc bat
Oct 29, 2019 · Penalty $25,000
Active - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35422432l issued on 05-08-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. occupancy contrary to that allowed by cert of occupancy or dob
Sep 10, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35422430h issued on 05/08/19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit at cellar level. remedy: comply w/comm's orde
Sep 10, 2019 · Penalty $12,500
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons violation #35422432l issued on 5/8/19 and to file a cert.of correction pursuant to 28-201.1 and 1rcny 102-01.occupancy contrary to that allow
Jul 17, 2019 · Penalty $3,125
Resolve - Class - 1
Removed or defaced a written posted vacate order.noted:for vacate order #b116/17 issued/posted 4/6/17.at time of inspection,i observed vacate order posting removed/none.i reposted vacate order.rem:comply with c
Jul 17, 2019 · Penalty $25,000
Active - Class - 2
Failure to comply with the commissioner's order contained in summons violation #35422431j issued on 5/8/19 and to file a cert.of correction pursuant to 28-201.1 and 1rcny 102-01.failure to obey vacate order fro
Jul 17, 2019 · Penalty $3,125
Resolve - Class - 2
Failure to maintain building in code compliant manner.noted:at 2nd floor skylight and cellar water penetration damage with starring at wallsand cieling also at cellar with holes in circle and boiler room throug
May 8, 2019 · Penalty $6,250
Active - Class - 1
Work without a permit.noted:at cellar level erected full height partitions creating rooms installed water and waste lines for 3 pc bathroom (toilet,sink,shower) and plumbing (roughing )for kitchen area sink and
May 8, 2019 · Penalty $12,500
Active - Class - 1
Occupancy contrary to that allowed by c of o or dob records. noted:legal 2 family(1st+2nd fl) cellar(boiler,storage) premises now occupied as 3/4 house program illegal occupancy. noted:at cellar converted/arran
May 8, 2019 · Penalty $12,500
Active - Class - 1
Failure to obey vacate order from the commissioner per 28-207.4. noted: for vacate order #b116/17 issued 4/6/17 at time of inspection i observed the cellar reoccupied by male. remedy: comply with vacate order
May 8, 2019 · Penalty $24,000
Active - Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation#35330680m issued on 4/30/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. note:no document file for
Dec 15, 2018
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35330680m issued on 04/30/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o permit. note installed electrical outlets & switches
Nov 3, 2018
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation#35330680m issued on 4/30/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for:work w/o a permit(elec
Sep 11, 2018
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio #35330680m issued on 04/30/18 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01.work w/out permit:note @1st fl electrical work bein
Jul 27, 2018
Resolve - Class - 1
Work without a permit.noted:on the first floor observed electrical work being done,new switches and outlets being installed.rem:obtain all required permits.
Apr 30, 2018
Resolve - Class - 2
Failure to maintain building in code compliant manner.noted:in the basement there are holes in the ceiling,also in the boiler room there areholes and the electrical box is open exposing the electrical wires.rem
Apr 30, 2018 · Penalty $3,125
Active
Complaints
- Heat/hot water
Entire building
Apr 2, 2026 · Apt 1
Close - Heat/hot water
Entire building
Mar 2, 2026 · Apt 1
Close - Heat/hot water
Entire building
Feb 26, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Feb 17, 2026 · Apt FIRSTF
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt 1
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 11, 2025 · Apt BASEME
Close - Electric
Power outage
Jan 11, 2025 · Apt BASEME
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Jan 11, 2025 · Apt BASEME
Close - Unsanitary condition
Pests
Jan 11, 2025 · Apt BASEME
Close - Paint/plaster
Ceiling
Jan 11, 2025 · Apt BASEME
Close - Paint/plaster
Wall
Jan 11, 2025 · Apt BASEME
Close - Unsanitary condition
Garbage/recycling storage
Aug 21, 2024 · Apt C
Close - Paint/plaster
Wall
Aug 14, 2024 · Apt 1FL
Close - Paint/plaster
Ceiling
Aug 14, 2024 · Apt 1FL
Close - Water leak
Slow leak
Aug 14, 2024 · Apt 1FL
Close - Unsanitary condition
Mold
Aug 14, 2024 · Apt 1FL
Close - Door/window
Door
Aug 14, 2024 · Apt 1FL
Close - Door/window
Door frame
Aug 14, 2024 · Apt 1FL
Close - Unsanitary condition
Pests
Aug 14, 2024 · Apt 1FL
Close - Unsanitary condition
Pests
Aug 14, 2024 · Apt 1FL
Close - Unsanitary condition
Pests
Aug 14, 2024 · Apt 1FL
Close - Electric
No lighting
Dec 28, 2022 · Apt 2NDFLO
Close - Electric
No lighting
Dec 11, 2022 · Apt ROOM2
Close - Water leak
Heavy flow
Dec 11, 2022 · Apt ROOM2
Close - Door/window
Door
Nov 16, 2022 · Apt 2
Close - Door/window
Door frame
May 17, 2022 · Apt 1
Close - Door/window
Window frame
May 17, 2022 · Apt 1
Close - Water leak
Heavy flow
May 17, 2022 · Apt 1
Close - Water leak
Heavy flow
May 17, 2022 · Apt 1
Close - Water leak
Slow leak
Mar 9, 2022 · Apt 2FL
Close - General
Ventilation system
Mar 2, 2022 · Apt 2
Close - Electric
Outlet/switch
Mar 2, 2022 · Apt 2
Close - Flooring/stairs
Floor
Mar 2, 2022 · Apt 2
Close - Flooring/stairs
Floor
Mar 2, 2022 · Apt 2
Close - Unsanitary condition
Mold
Mar 2, 2022 · Apt 2
Close - Plumbing
Basin/sink
Mar 2, 2022 · Apt 2
Close - Electric
No lighting
Mar 2, 2022 · Apt 2
Close - Door/window
Door
Mar 1, 2022 · Apt 1
Close - Electric
Wiring
Mar 1, 2022 · Apt 1
Close - Electric
Outlet/switch
Mar 1, 2022 · Apt 1
Close - Paint/plaster
Ceiling
Mar 1, 2022 · Apt 1
Close - Paint/plaster
Ceiling
Mar 1, 2022 · Apt 1
Close - Paint/plaster
Wall
Mar 1, 2022 · Apt 1
Close - Paint/plaster
Wall
Mar 1, 2022 · Apt 1
Close - Door/window
Window frame
Mar 1, 2022 · Apt 1
Close - Plumbing
Basin/sink
Mar 1, 2022 · Apt 1
Close - Plumbing
Basin/sink
Mar 1, 2022 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1901
- Floors
- 2
- Residential units
- 2
- Building area
- 2,000 ft²
- Lot area
- 2,000 ft²
- Zoning
- R5
- Community board
- 305
- Council district
- 42
- Block / lot
- 4075 / 1
- Assessed value
- $61,980
- Landmark / historic district
- No
Questions about 631 Hendrix Street
Who owns 631 Hendrix Street?
The owner of record in NYC Department of City Planning PLUTO data is Hendrix Realty LLC.
Does 631 Hendrix Street have violations?
Yes. NYC HPD has recorded 216 housing violations at this property.
Is 631 Hendrix Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 631 Hendrix Street built?
City records list 1901 as the year it was built.
How many apartments are in 631 Hendrix Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.