Violations at 435 Warwick Street
Brooklyn, NY 11207 · BBL 3-04015-0013 · Back to the property
HPD housing violations
13 HPD violations, newest first.
- CImmediately hazardous
Abate the nuisnace consisting of rodents in 2nd story apt.
Nov 28, 2005
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of double cylinder key operated lock at entrance door vestibule to 1st story public hall.
Nov 28, 2005
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures bathroom & kitchen 1st story apt. er-1
Nov 28, 2005
Open — Nov sent out - CImmediately hazardous
Replace with new the missing glass lower sash at window of south west room, 2nd story apt. #2. er-1
Nov 28, 2005
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures kitchen and bathroom, 2nd story apt. #2.
Nov 28, 2005
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room, cellar
Oct 28, 2004
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Oct 28, 2004 · Apt 2
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at main entrance door at public hall, 1st story
Sep 2, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Sep 2, 2004 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Sep 2, 2004 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east
Sep 2, 2004 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective counter balance lower sash at east window in the 1st room from north located at apt 2, 2nd story, 1st apartment from north at east
Sep 2, 2004 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling at west window in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east
Sep 2, 2004 · Apt 2
Open — Nov sent out
DOB building violations
1 DOB violations, newest first.
- Construction other optional
C-construction other optional
Aug 26, 1998
Dob violation - active
ECB violations
1 ECB violations, newest first.
- Non-hazardous
Failure to maintain building exterior wall defect is: cracked and loose stucco plaster at south rear and south center, adjacent to public school yard.
Aug 26, 1998 · Penalty $180
Active