Violations at 2904 Atlantic Avenue
Brooklyn, NY 11207 · BBL 3-03966-0019 · Back to the property
HPD housing violations
The newest 50 of 226 HPD violations. The city keeps the complete history.
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to building rear, at public hall, 1st story
Jun 8, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective broken glass at vestibule door at public hall, 1st story
Apr 23, 2026
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperative in the entire apartment located at apt 6, 2nd story, 1st apartment from west at north
Apr 23, 2026 · Apt 6
Open — First no access to re- inspect violation - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperative in the entire apartment located at apt 6, 2nd story, 1st apartment from west at north
Apr 23, 2026 · Apt 6
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the foyer located at apt 6, 2nd story, 1st apartment from west at north
Apr 23, 2026 · Apt 6
Open — First no access to re- inspect violation - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling in the foyer located at apt 6, 2nd story, 1st apartment from west at north
Apr 23, 2026 · Apt 6
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 6, 2nd story, 1st apartment from west at north
Apr 23, 2026 · Apt 6
Open — First no access to re- inspect violation - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at north at fire escape, 2nd story
May 30, 2025
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall in the bathroom located at apt 2, 1st story, 1st apartment from east at south original violation 17508299 issued 04-dec-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Dec 4, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective metal cornice at roof
Dec 4, 2024
Open — Not complied with - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following one or more light with and aggregate of not less than 100 watts incandescent of equivalent.
Dec 4, 2024
Open — Not complied with - BHazardous
M/d law abate the nuisance consisting of metal storage shed blocking gate at lot line leading to south yard
Dec 4, 2024
Open — Not complied with - BHazardous
Remove the illegal fastening lockable hasp at gate at lot line leading to south yard
Dec 4, 2024
Closed — Violation closed - BHazardous
Provide heavy duty lock and latch assembly at building entrance door
Dec 4, 2024
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of in the event of a power outage provide security and remove illegal electromagnetic locking device on door at building entrance
Dec 4, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at door leading to west yard at public hall, 1st story
Dec 4, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective missing latch set at vestibule door at public hall, 1st story
Dec 4, 2024
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall in the bathroom located at apt 2, 1st story, 1st apartment from east at south
Dec 4, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department south and west walls in the kitchen located at apt 2, 1st story, 1st apartment from east at south
Dec 4, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2, 1st story, 1st apartment from east at south
Dec 4, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 2, 1st story, 1st apartment from east at south
Jul 31, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective the upper sash window spring balance at 1st window from east at north in the 1st room from north located at apt 15, 4th story, 1st apartment from west at north
Apr 15, 2024 · Apt 15
Closed — Violation closed - BHazardous
Properly secure the loose basecabinet at west wall in the kitchenette located at apt 15, 4th story, 1st apartment from west at north
Apr 15, 2024 · Apt 15
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wall tiles at south and north walls at bathtub in the bathroom located at apt 15, 4th story, 1st apartment from west at north
Apr 15, 2024 · Apt 15
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective broken ceramic floor tiles in the bathroom located at apt 15, 4th story, 1st apartment from west at north
Apr 15, 2024 · Apt 15
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 15, 4th story, 1st apartment from west at north
Apr 15, 2024 · Apt 15
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of rodents rats in the entire apartment located at apt 15, 4th story, 1st apartment from west at north
Apr 15, 2024 · Apt 15
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 15, 4th story, 1st apartment from west at north
Apr 15, 2024 · Apt 15
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2024
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the entire apartment located at apt 2, 1st story, 1st apartment from east at south
Mar 8, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective glass at building entrance door at public hall, 1st story
Feb 11, 2024
Closed — Violation closed - BHazardous
Provide wired glass at vestibule door at public hall, 1st story
Feb 11, 2024
Closed — Violation closed - BHazardous
Provide wired glass at building front entrance at public hall, 1st story
Feb 11, 2024
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of plexi glass at vestibule door at public hall, 1st story
Feb 11, 2024
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of plexi glass at building front entrance at public hall, 1st story
Feb 11, 2024
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east and south wall in the 2nd room from east located at apt 1, 1st story, 1st apartment from west at north
Feb 11, 2024 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 3rd room from east located at apt 1, 1st story, 1st apartment from west at north
Feb 11, 2024 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Feb 11, 2024 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling north wall and south wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Feb 11, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 1, 1st story, 1st apartment from west at north
Feb 11, 2024 · Apt 1
Closed — Violation closed - BHazardous
Refit door in the entrance located at apt 1, 1st story, 1st apartment from west at north
Feb 11, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 1, 1st story, 1st apartment from west at north
Feb 11, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Feb 11, 2024 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Feb 11, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Feb 11, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Nov 2, 2023 · Apt 15
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Nov 2, 2023 · Apt 15
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 2, 1st story, 1st apartment from east at south
May 26, 2022 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 2, 1st story, 1st apartment from east at south
May 26, 2022 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2, 1st story, 1st apartment from east at south
May 26, 2022 · Apt 2
Closed — Violation closed
DOB building violations
1 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed
ECB violations
6 ECB violations, newest first.
- Class - 3
Work w/o permit.noted installed accessory business sign awning 35'x4'x4' (approx) & projecting sign approx 2'x3' on each side.rem obtain necessary permits if feasible,or restore premises to legal condition.
Jul 1, 2015 · Penalty $100
Resolve - Class - 1
Provision of law 28-201.1 failure to comply with comm-order to obtain a permit per violation 347072755 for work done on propery without a permit. rem: correct conditions cited in
Mar 30, 2009
Resolve - Class - 1
Failure to maintain building in code complaint manner. defects noted: front entry door to apt #2 1st flr not self closing. missing railing at stair (cmla) beyond lobby door exiting to rear corridor. broken & de
Sep 19, 2008 · Penalty $1,000
Resolve - Class - 1
Occupancy contrary to that allowed by department records or hpd. notedbuilding is arranged and occupied as multiple dwelling with commercial store on the 1st flr contrary to department records and hpd which spe
Sep 19, 2008
Resolve - Class - 1
Work w/o a permit. illegal work noted: building found to be modified at 1st flr in that room @ rear for apt #2 omitted and added to apt #1 for more square footage commercial store create at 1st flr and ac unit
Sep 19, 2008
Resolve - Hazardous
Failure to maintqan exterior building wall. defect are: keystones and masonry units at fornt facade (facing atlantic ave) at 2nd and 31 floors (corner) are loose, sagging and in danger of falling. remainder of
Feb 15, 1998 · Penalty $800
Resolve