104 Sunnyside Avenue
Brooklyn, NY 11207BBL 3-03896-0012Map
Owner of record: Deutsche Bank National Trust Company
104 Sunnyside Avenue is a two-family home built in 1910 in Brooklyn, 11207. It has 2 residential units across 2 floors. The owner of record is Deutsche Bank National Trust Company. HPD has recorded 268 housing violations here, most recently on November 5, 2025. 47 of the 50 most recent violations are still open.
- HPD violations
- 268
- DOB violations
- 5
- ECB violations
- 24
- HPD complaints
- 289
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 268
- BHazardous
Properly repair or replace the broken or defective wooden base cabinet and counter top at sink in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Nov 5, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at east wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Nov 5, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Nov 5, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Oct 19, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north, south, east, and west wall and at ceiling in the 2nd private hallway from north at west located at apt 2, 2nd story, 1st apartment from east at south
Oct 19, 2025 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective countertop at base cabinet at kitchen sink in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Oct 19, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes conducive to pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls,ceilings, floors, fixing leaks and manage garbage in public areas. evidence found at kitchen in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Oct 19, 2025 · Apt 2
Open — Notice of issuance sent to tenant - CImmediately hazardous
Repair the broken or defective connection at wash bain in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Oct 19, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st wall cabinet from west at north wall in the 1st room from north at east located at apt 2ndflo, 2nd story, 1st apartment from east at south
Sep 6, 2025 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixturer on west wall in the 1st room from north at east located at apt 2ndflo, 2nd story, 1st apartment from east at south
Sep 6, 2025 · Apt 2NDFLO
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective door at 1st wall cabinet from west at north in the 1st room from north at east located at apt 2ndflo, 2nd story, 1st apartment from east at south
Sep 6, 2025 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at 1st wall cabinet from west at north wall in the 1st room from north at east located at apt 2ndflo, 2nd story, 1st apartment from east at south
Sep 6, 2025 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective floor and counter top at base cabinet on east wall in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from east at south
Sep 6, 2025 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Jun 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective marble saddle at entrance in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jun 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective countertop at sink in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jun 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor at base cabinet at sink in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jun 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Jun 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Jun 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the east , west , north , south walls and at closet ceiling at north wall in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from east at south
Jun 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from east at south
Jun 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from east at south
Jun 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the east wall in the 1st private hallway from north at east located at apt 2, 2nd story, 1st apartment from east at south
Jun 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at south , north , east and west wall in the 1st private hallway from north at west located at apt 2, 2nd story, 1st apartment from east at south
Jun 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the south , north , east and west wall in the 1st private hallway from north at west located at apt 2, 2nd story, 1st apartment from east at south
Jun 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Jun 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective cracked glass at skylight at public hall, 2nd story
Jun 15, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 2, 2nd story, 1st apartment from east at south
Jun 7, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Jun 7, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter top and base cabinet at sink in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jun 7, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from north at west located at apt 2, 2nd story, 1st apartment from east at south
Jun 7, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from east at south
Jun 7, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the west wall in the private hallway located at apt 2, 2nd story, 1st apartment from east at south
Jun 7, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the south wall in the private hallway located at apt 2, 2nd story, 1st apartment from east at south
Jun 7, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the east wall in the private hallway located at apt 2, 2nd story, 1st apartment from east at south
Jun 7, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the north wall in the private hallway located at apt 2, 2nd story, 1st apartment from east at south
Jun 7, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at east, the private hallway located at apt 2, 2nd story, 1st apartment from east at south
Jun 7, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the south wall in the 3rd private hallway located at apt 2floor, 2nd story, 1st apartment from east at south
May 21, 2025 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall wall in the 1st room from north at east located at apt 2floor, 2nd story, 1st apartment from east at south
May 21, 2025 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the 1st closet from west at north wall ceiling in the 1st room from north at east located at apt 2floor, 2nd story, 1st apartment from east at south
May 21, 2025 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north at east located at apt 2floor, 2nd story, 1st apartment from east at south
May 21, 2025 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, 1st closet from west at north wall wall, 1st closet from west at north wall ceiling, ceiling, 1st closet from west at north wall wall, 1st closet from west at north wall ceiling, ceiling in the 1st room from north at east located at apt 2floor, 2nd story, 1st apartment from east at south
May 21, 2025 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the east wall in the 2nd private hallway located at apt 2floor, 2nd story, 1st apartment from east at south
May 21, 2025 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the north wall in the 3rd private hallway located at apt 2floor, 2nd story, 1st apartment from east at south
May 21, 2025 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the east wall in the 3rd private hallway located at apt 2floor, 2nd story, 1st apartment from east at south
May 21, 2025 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the 1st closet from west at north wall wall in the 1st room from north at east located at apt 2floor, 2nd story, 1st apartment from east at south
May 21, 2025 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2floor, 2nd story, 1st apartment from east at south
May 21, 2025 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north at west located at apt 2floor, 2nd story, 1st apartment from east at south
May 21, 2025 · Apt 2FLOOR
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the 1st room from north at east located at apt 2floor, 2nd story, 1st apartment from east at south
May 21, 2025 · Apt 2FLOOR
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from north, the 2nd private hallway , the 3rd private hallway , the 1st room from north at west located at apt 2floor, 2nd story, 1st apartment from east at south
May 21, 2025 · Apt 2FLOOR
Open — Nov sent out
DOB building violations · 5
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 11, 2012
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 11, 2012
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 7, 2012
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 28, 2011
Dob violation - active
ECB violations · 24
- Class - 1
Failure to maintain building: the front porch roof and 2nd floor cornice roof and decorative horizontal wood members defective with holes in both roofs and rotted wood in various locations at exposure one at ti
Sep 3, 2024 · Penalty $6,250
Active - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34930222h issued on 12/15/11. for const work etc done w/o a permit. remedy: comply w/the comm's order.
Dec 9, 2013 · Penalty $12,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34930222h issued on 12.15.11 for construction work etc done w/o a permit. remedy: comply w/the commissioner's order.
Nov 14, 2013 · Penalty $24,000
Active - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34930222h issued on 12/15/11. for construction work etc done w/o a permit. remedy: comply w/the comm's order.
Oct 7, 2013 · Penalty $12,000
Active - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34930222h issued on 12/15/11. for work etc done w/o a permit.remedy: comply w/the comm's order.
Sep 17, 2013 · Penalty $24,000
Active - Class - 2
Failure to comply w/the commissioner's order to file a c/c w/the dob for nov #34995891m issued on 10.11.12 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c/c.
Aug 14, 2013 · Penalty $4,000
Resolve - Class - 1
Fail to comply w/commissioner's order contained in nov #34930222h issued on 12/15/11 for creating class 'a' apt etc in basement w/o a permit. rem:comply w/commissioner's order.
Aug 14, 2013 · Penalty $12,000
Active - Class - 2
Failure to maintain. noted: at basement level,entire portions of ceiling missing - exposing joists etc,due to water damage. section of ceiling also in a state of collasping w/hanging pieces of sheet rock dangli
Oct 11, 2012 · Penalty $5,000
Active - Class - 2
Residence altered for occupancy as a dwelling for more than the legal # of families. dob records (hpd also) indicates bldg to be legal 2 families. alteration work noted: at basement level,created class'a' apt
Oct 11, 2012 · Penalty $10,000
Active - Class - 1
Failure to comply w/commissioner's order contained in nov#34930222h issued on 12/15/11.for creating class"a" apt @basement w/o a permit. remedy: comply w/commissioner's order.
Oct 11, 2012 · Penalty $24,000
Resolve
Show 14 more ↓
- Class - 1
Failure to maintain. noted: porch erected at 2nd fl rear apt,has rotted & defective/missing railings. poorly constructed wooden rail system is rotted & loose. said structure may collaspe is presure is applied.
Oct 11, 2012 · Penalty $10,000
Active - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34930222h issued on 12/15/11. for creating class'a' apt @ cellar w/o a permit. remedy: comply w/the comm's order.
Aug 10, 2012 · Penalty $24,000
Active - Class - 1
Failure to comply w/the commissioner's order contained in nov #34930222h issued on 12.15.11. for creating class 'a' apt etc w/o a permit. remedy: comply w/the commissioner's order
Jun 5, 2012 · Penalty $24,000
Resolve - Class - 1
Failure to correct conditions cited in nov 34930222h on 12/15/11 for creating class'a' apt @ basement w/o a permit. remedy: correct conditions cited.
Apr 27, 2012 · Penalty $24,000
Resolve - Class - 1
Failure to maintain building exterior noted:at front porch/landing concrete area approx 2 1/2 x 2 1/2 has collapsed & fallen onto basement level. rem:repair defects forthwith & obtain permit maintain building.
Apr 19, 2012 · Penalty $5,000
Active - Class - 1
Failure to maintain building in code compliant manner. defect:front concrete stood at 1sty is defective 3x4' section missing at center rotteed,rusted steel support remaining sections cracked,(wrong iron)railing
Apr 18, 2012 · Penalty $5,000
Active - Class - 2
Failure to maintain building in a code compliant manner. defect is 2nd flr joists & flr framing are rotted & defective due to extreme water leak from 2nd flr bathroom down to 1st flr bathroom. rem:stop water le
Apr 18, 2012 · Penalty $2,500
Active - Class - 1
Failure to comply w/the commissioner's order contained in nov #34930222h issued on 12.15.11 for creating class 'a' apt @ basement w/o a permit. remedy: comply w/the commissionser's order.
Feb 16, 2012 · Penalty $24,000
Resolve - Class - 2
Failure to comply with the commissioner's order to file a cert of corrections with the d.o.b. noted:no cert of correction has been filed forecb violation #34747431z issued on 8-31-11. rem:file cert of correctio
Dec 30, 2011 · Penalty $4,000
Resolve - Class - 2
Failure to maintain building in code compliant manner defects are in basement bathroom had backed up and raw sewage is all over bathroom floor. there are numerous water leaks from above causing water damage thr
Dec 15, 2011 · Penalty $2,500
Active - Class - 2
Occupancy contrary to building department records hpd #379567 indicates building to be a legal two family in the basement there is a illegalclass "a" apartment full kitchen with gas stove 3pc bathroom livingroo
Dec 15, 2011 · Penalty $6,000
Active - Class - 1
Work without a permit. work noted:in that basement had a class "a" apartment full kitchen with gas stove. 3pc bathroom livingroom and one bedroom and furance room apartment was occupied at time of inspection al
Dec 15, 2011 · Penalty $8,000
Active - Class - 2
Occuancy contrary to that allowed by cofo & dept of bldgs records. class "a" apt created at cellar. partitions erected creating rooms. full 3pc bathroom with water closet wash basin & stall shower also kitchen
Dec 8, 2011 · Penalty $6,000
Active - Class - 1
Occupancy contrary to that allowed by c/o and dob records class a apt created at cellar partition erected creating rooms full ktcn present w/ sink and gas range also full 3pc btrm present w/ water closet washba
Aug 31, 2011 · Penalty $12,000
Active
Complaints
- Water leak
Heavy flow
Aug 10, 2026 · Apt FIRSTF
Close - Unsanitary condition
Garbage/recycling storage
Aug 10, 2026 · Apt FIRSTF
Close - Heat/hot water
Entire building
Nov 12, 2025 · Apt 2
Close - Plumbing
Basin/sink
Oct 31, 2025 · Apt 2
Close - General
Ventilation system
Oct 31, 2025 · Apt 2
Close - Safety
Window guard broken/missing
Oct 31, 2025 · Apt 2
Close - Flooring/stairs
Floor
Oct 31, 2025 · Apt 2
Close - Unsanitary condition
Pests
Oct 31, 2025 · Apt 2
Close - Paint/plaster
Wall
Oct 31, 2025 · Apt 2
Close - Plumbing
Basin/sink
Oct 27, 2025 · Apt SECOND
Close
Show 40 more ↓
- Plumbing
Bathtub/shower
Oct 22, 2025 · Apt 2
Close - Flooring/stairs
Floor
Oct 15, 2025 · Apt 2
Close - Plumbing
Basin/sink
Oct 15, 2025 · Apt 2
Close - Unsanitary condition
Pests
Oct 15, 2025 · Apt 2
Close - Paint/plaster
Wall
Sep 4, 2025 · Apt 2NDFLO
Close - General
Cabinet
Sep 4, 2025 · Apt 2NDFLO
Close - Paint/plaster
Door/frame
Sep 4, 2025 · Apt 2NDFLO
Close - Door/window
Window frame
Sep 4, 2025 · Apt 2NDFLO
Close - Safety
Window guard broken/missing
Sep 4, 2025 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Jun 10, 2025 · Apt 2
Close - Paint/plaster
Wall
Jun 10, 2025 · Apt 2
Close - Water leak
Slow leak
Jun 10, 2025 · Apt 2
Close - Unsanitary condition
Pests
Jun 10, 2025 · Apt 2
Close - Water leak
Heavy flow
Jun 2, 2025 · Apt 2
Close - Plumbing
Basin/sink
Jun 2, 2025 · Apt 2
Close - Unsanitary condition
Pests
Jun 2, 2025 · Apt 2
Close - Unsanitary condition
Mold
Jun 2, 2025 · Apt 2
Close - Paint/plaster
Door/frame
Jun 2, 2025 · Apt 2
Close - Unsanitary condition
Pests
Jun 2, 2025 · Apt 2
Close - Paint/plaster
Wall
Jun 2, 2025 · Apt 2
Close - Unsanitary condition
Mold
May 20, 2025 · Apt 2FLOOR
Close - Flooring/stairs
Floor
May 20, 2025 · Apt 2FLOOR
Close - Plumbing
Basin/sink
May 20, 2025 · Apt 2FLOOR
Close - Paint/plaster
Ceiling
May 20, 2025 · Apt 2FLOOR
Close - Unsanitary condition
Pests
May 20, 2025 · Apt 2FLOOR
Close - Paint/plaster
Wall
Feb 24, 2025 · Apt 2
Close - Paint/plaster
Ceiling
Feb 24, 2025 · Apt 2
Close - Unsanitary condition
Pests
Feb 24, 2025 · Apt 2
Close - Unsanitary condition
Pests
Feb 24, 2025 · Apt 2
Close - Unsanitary condition
Pests
Jan 8, 2025 · Apt 2
Close - Paint/plaster
Wall
Jan 8, 2025 · Apt 2
Close - Unsanitary condition
Mold
Jan 8, 2025 · Apt 2
Close - Unsanitary condition
Pests
Jan 8, 2025 · Apt 2
Close - Plumbing
Basin/sink
Jan 8, 2025 · Apt 2
Close - Safety
Smoke detector
Jan 8, 2025 · Apt 2
Close - Safety
Carbon monoxide detector
Jan 8, 2025 · Apt 2
Close - Safety
Window guard broken/missing
Jan 8, 2025 · Apt 2
Close - Unsanitary condition
Pests
Jan 8, 2025 · Apt 2
Close - Paint/plaster
Ceiling
Jan 8, 2025 · Apt 2
Close - Plumbing
Basin/sink
Dec 17, 2024 · Apt 2
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Oct 16, 2025 | $500 | Two family dwellings | 2 |
Building details
- Building type
- Two-family home (B1)
- Year built
- 1910
- Floors
- 2
- Residential units
- 2
- Building area
- 1,912 ft²
- Lot area
- 1,660 ft²
- Zoning
- R4
- Community board
- 305
- Council district
- 37
- Block / lot
- 3896 / 12
- Assessed value
- $54,120
- Landmark / historic district
- No
Questions about 104 Sunnyside Avenue
Who owns 104 Sunnyside Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Deutsche Bank National Trust Company.
Does 104 Sunnyside Avenue have violations?
Yes. NYC HPD has recorded 268 housing violations at this property.
Is 104 Sunnyside Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 104 Sunnyside Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 104 Sunnyside Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.