roofy

Violations at 679 Van Sinderen Avenue

Brooklyn, NY 11207 · BBL 3-03850-7501 · Back to the property

HPD housing violations

The newest 50 of 121 HPD violations. The city keeps the complete history.

  • CImmediately hazardous

    Provide ready access to buildings heating system lock door at cellar at boiler room

    Mar 28, 2026

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 219, 2nd story, 9th apartment from north at east

    Mar 28, 2026 · Apt 219

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide ready access to buildings heating system locked door at cellar at boiler room

    Nov 18, 2025

    Closed — Violation closed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 410, 4th story, 10th apartment from south at west

    Nov 18, 2025 · Apt 410

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide ready access to buildings heating system locked door at cellar at boiler room

    Nov 18, 2025

    Closed — Violation closed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 419, 4th story, 9th apartment from north at east

    Nov 18, 2025 · Apt 419

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 5th room from east located at apt 419, 4th story, 9th apartment from north at east

    Nov 18, 2025 · Apt 419

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 219, 2nd story, 9th apartment from north at east

    Oct 13, 2025 · Apt 219

    Closed — Violation closed
  • CImmediately hazardous

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Oct 13, 2025

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide ready access to buildings heating system door locked at basement at public hall, 1st story

    Oct 13, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended celing. at public hall, 1st story

    Sep 18, 2025

    Closed — Violation dismissed
  • BHazardous

    Refit base cabinet door in the kitchen located at apt 219, 2nd story, 9th apartment from north at east

    Aug 3, 2025 · Apt 219

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide ready access to buildings heating system locked door at south at boiler room

    Aug 3, 2025

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 219, 2nd story, 9th apartment from north at east

    Aug 3, 2025 · Apt 219

    Closed — Violation dismissed
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from north located at apt 305, 5th story, 5th apartment from south at west

    Mar 13, 2025 · Apt 305

    Closed — Violation dismissed
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from north located at apt 305, 5th story, 5th apartment from south at west

    Mar 13, 2025 · Apt 305

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 312, 3rd story, 2nd apartment from north at east

    Feb 8, 2025 · Apt 312

    Closed — Violation dismissed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of key fob operated bulkhead door at staircase a at public hall, 7th story

    Feb 2, 2025

    Closed — Violation dismissed
  • CImmediately hazardous

    Remove device preventing door from being self-closing fire extinguisher at door at laundry room, 7th story

    Feb 2, 2025

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches at compactor closet, 1st story

    Oct 23, 2024

    Closed — Violation dismissed
  • ANon-hazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the compactor closet at east at public hall, 2nd story

    Oct 23, 2024

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall and ceiling in the 2nd room from north located at apt 306, 3rd story, 6th apartment from south at west

    Oct 23, 2024 · Apt 306

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 509, 5th story, 5th apartment from south at west

    Oct 10, 2024 · Apt 509

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 509, 5th story, 5th apartment from south at west

    Oct 10, 2024 · Apt 509

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 509, 5th story, 5th apartment from south at west

    Oct 10, 2024 · Apt 509

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 509, 5th story, 5th apartment from south at west

    Oct 10, 2024 · Apt 509

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at west located at apt 509, 5th story, 5th apartment from south at west

    Oct 10, 2024 · Apt 509

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at west located at apt 509, 5th story, 5th apartment from south at west

    Oct 10, 2024 · Apt 509

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective wood base cabinet at sink in the kitchen located at apt 506, 5th story, 6th apartment from south at west

    Sep 24, 2024 · Apt 506

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at apartment entrance door in the entrance located at apt 506, 5th story, 6th apartment from south at west

    Sep 19, 2024 · Apt 506

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective connection at waste line under sink in the kitchen located at apt 506, 5th story, 6th apartment from south at west

    Sep 8, 2024 · Apt 506

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective lock at door in the entrance located at apt 517, 5th story, 7th apartment from north at east

    Jul 28, 2024 · Apt 517

    Closed — Violation closed
  • BHazardous

    Remove all obstructions and repair all defects in at bathtub waste line in the 2nd bathroom from north located at apt 517, 5th story, 7th apartment from north at east

    Jul 28, 2024 · Apt 517

    Closed — Violation dismissed
  • BHazardous

    Remove all obstructions and repair all defects in at bathtub waste line in the 1st bathroom from north located at apt 517, 5th story, 7th apartment from north at east

    Jul 28, 2024 · Apt 517

    Closed — Violation dismissed
  • BHazardous

    Abate the infestation consisting of vermin evidence of live ants in the entire apartment located at apt 517, 5th story, 7th apartment from north at east

    Jul 28, 2024 · Apt 517

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department wood base bord in the 1st room from north located at apt 517, 5th story, 7th apartment from north at east

    Jul 28, 2024 · Apt 517

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 517, 5th story, 7th apartment from north at east

    Jul 28, 2024 · Apt 517

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective heating/ac united system in the 1st room from north located at apt 517, 5th story, 7th apartment from north at east

    Jul 28, 2024 · Apt 517

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective vestibule door at public hall, 1st story

    Jul 12, 2024

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective mortise lockset in the entrance located at apt 517, 5th story, 4th apartment from north at east , section at south

    Jul 12, 2024 · Apt 517

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective wooded wall molding in the 1st room from north located at apt 517, 5th story, 4th apartment from north at east , section at south

    Jul 12, 2024 · Apt 517

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at all walls in the entire apartment located at apt 709, 7th story, 3rd apartment from north at east

    Jun 1, 2024 · Apt 709

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 709, 7th story, 3rd apartment from north at east

    Jun 1, 2024 · Apt 709

    Closed — Violation closed
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 709, 7th story, 3rd apartment from north at east

    Jun 1, 2024 · Apt 709

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at west wall at public hall, 1st story

    May 15, 2024

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st story

    May 15, 2024

    Closed — Violation closed
  • BHazardous

    Refit building entrance door , 1st story

    May 15, 2024

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroom located at apt 511, 5th story, 1st apartment from north at east

    May 15, 2024 · Apt 511

    Closed — Violation closed
  • BHazardous

    Provide adequate light of not less than 60 watts incandescent or equivalent illumination at west wall between apartments 503 - 506 at public hall, 5th story

    May 15, 2024

    Closed — Violation closed
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 419, 4th story, 1st apartment from south at west

    Jan 16, 2024 · Apt 419

    Closed — Violation closed

DOB building violations

4 DOB violations, newest first.

  • High pressure boiler boiler required

    Violation issued-failure to file 2021 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2021 external hgh pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 external high pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 internal high pressure inspection

    Apr 25, 2023

    Dob violation - dismissed

ECB violations

4 ECB violations, newest first.

  • Class - 2

    At time of inspection observed men at work insulating hvac work in convenient store, alteration under permit # 340776468. failure to provide approved/accepted construction documents at jobsite at time of inspec

    Feb 2, 2022

    Resolve
  • Class - 2

    Documents to be kept on-site.noted:at time of my inspeciton of a new 7story buliding,construction in progress,i asked to see the sidewalk shed log book,after approx 30 mns,i was told,none was available,i also a

    Jan 30, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Bc33075-failure to provide flag person.noted:at time of my inspeciton of a new 7 storie building,construction in progress,upon entering the job-site,i observed numerous cars driving up the street(van sinderen a

    Jan 30, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Bc330112-failure to comply with nyc fire code.noted:at time of my inspection of a new 7 storie building,construction in progress,i observed that the fire extinguishers throughout had not recieved monthly checks

    Jan 30, 2020 · Penalty $2,500

    Resolve