Violations at 642 Miller Avenue
Brooklyn, NY 11207 · BBL 3-03827-0038 · Back to the property
HPD housing violations
The newest 50 of 96 HPD violations. The city keeps the complete history.
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges and (missing) latch at boiler room
Jun 12, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door at public hall, 2nd story
Jun 12, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
Feb 27, 2023 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from north at east
Feb 27, 2023 · Apt 2F
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer located at apt 2f, 2nd story, 1st apartment from north at east
Feb 27, 2023 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
Feb 27, 2023 · Apt 2F
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from north at east
Feb 27, 2023 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall, baseboard at east wall in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from north at east
Feb 27, 2023 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from north at east
Feb 27, 2023 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at east wall in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
Feb 27, 2023 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
Feb 27, 2023 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Feb 27, 2023 · Apt 2F
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at ( approximately 10 sqft) ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Feb 27, 2023 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly secure the loose wood treads, 3rd, and 4th from bottom up, at public hall stairs, 1st story
Feb 27, 2023
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of the storage of household items at public hall, 1st story
Feb 27, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door underneath stairs, leading to basement , at south wall, at public hall, 1st story
Feb 27, 2023
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of uncapped radiator shut-off valve , at south wall, at public hall, 1st story
Feb 27, 2023
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of the storage of household items at intermediate landing and stairs to roof bulkhead at public hall, 2nd story
Feb 27, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door to roofbulkead , west wall, at public hall, 2nd story
Feb 27, 2023
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective electrical outlet and light switch cover ,at south wall, in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Feb 27, 2023 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2f, 2nd story, 1st apartment from north at east
Feb 27, 2023 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Feb 27, 2023 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Feb 27, 2023 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
Oct 11, 2022 · Apt 1R
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective sheet metal fire retardant ceiling at cellar
Sep 25, 2019
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 18, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 10, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 13, 2015
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required, light fixture present
Apr 15, 2015
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 23, 2015
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet at in the bathroom located at apt 1f, 1st story, apartment at east
Nov 22, 2011 · Apt 1F
Closed — Violation closed - BHazardous
Repair the broken or defective connection watercloset supply line in the bathroom located at apt 1f, 1st story, apartment at east
Nov 22, 2011 · Apt 1F
Closed — Violation closed - BHazardous
Repair the broken or defective connection sink wasteline in the kitchen located at apt 1f, 1st story, apartment at east
Nov 22, 2011 · Apt 1F
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1f, 1st story, apartment at east
Nov 22, 2011 · Apt 1F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the kitchen located at apt 1f, 1st story, apartment at east
Nov 22, 2011 · Apt 1F
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of chipped procelain bathtub in the bathroom located at apt 1f, 1st story, apartment at east
Nov 22, 2011 · Apt 1F
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling in the bathroom located at apt 1f, 1st story, apartment at east
Nov 22, 2011 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective main entrance door locking device at lobby, 1st story
Nov 22, 2011
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling at public hall, 1st story
Nov 22, 2011
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of evidence of water leak at ceiling in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Apr 11, 2010 · Apt 2F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceilings in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Apr 11, 2010 · Apt 2F
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Apr 11, 2010 · Apt 2F
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Apr 11, 2010 · Apt 2F
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Apr 11, 2010 · Apt 2F
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... in window sill in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from north at east
Apr 11, 2010 · Apt 2F
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from north at east
Mar 31, 2010 · Apt 2F
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the foyer located at apt 2f, 2nd story, 1st apartment from north at east
Mar 31, 2010 · Apt 2F
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
Mar 31, 2010 · Apt 2F
Closed — Violation closed
DOB building violations
5 DOB violations, newest first.
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 17, 2019
Dob violation - dismissed
ECB violations
12 ECB violations, newest first.
- Class - 2
Failure to comply with commissioners order contained in summons/violation#35358927j issued on 01/23/2019,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptible certifi
Dec 9, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioners'order contained in summons/violation #35375333r issued on 1/23/19 and to file a cert.of correction pursuant to 28-201.1 and 1rcny 102-01.for:failure to maintain bld.in c
Jun 17, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation #35375333r issued on 1/23/19 & to file a cert.of correction pursuant to 28-201.1&1rcny 102-01.failure to maintain bld.in code comp
Mar 28, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35375331n issued on 1/23/19 & to file a cert.of correction pursuant to 28-201.1 &1rcny 102-01.failure to maintain bld.in code compl
Mar 28, 2019 · Penalty $625
Resolve - Class - 1
Failure to maintain bldg walls & appurtenances. noted: exp#1 parapet wall leaning inwood toward roof. remedy: maintain bldg exterior walls.
Mar 28, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code-compliant manner-use of prohibited door and/or hardware per bc 1008.1.8;27-371(j)-at time of inspection-illegal hardware/locking devices at roof top/bulkhead door-(2)spring
Jan 23, 2019 · Penalty $312
Resolve - Class - 1
Failure to maintain building wall(s) or appurtenance-at time of inspection-parapet wall not plumb&leaning inward towards the roof top-unableto gain access to rooftop-engineering report required for structural s
Jan 23, 2019 · Penalty $625
Resolve - Class - 1
Failure to maintain building in code compliant manner-excessive amountof construction debris throughout entire premises including rear yard and cellar to 2nd fl-bulkhead screwed locked w/ chain and wood barrier
Jan 23, 2019 · Penalty $312
Resolve - Class - 1
Work w/o permit(s)-work noted-complete gut&reno w/ approx 60% completed from cellar to 2nd fl-new partitions w/ plumbing/electrical work observed-new water&waste lines for the (3)pc bathrooms on all apt&residen
Jan 23, 2019 · Penalty $625
Resolve - Class - 2
Unapproved/ unsafe/ unsuitable electrical equipment, apparatus,materials, devices, appliances or wiring in use.throughout the entire basement loose hanging wires opem boxes and panel boxes.rem:comply with ec
Jan 23, 2019 · Penalty $800
Resolve - Class - 1
Electrical work w/o a permit throughout the entire building removal ofall old electrical apparatus and installation of new 6/3 riser (4) pond bores outlets witches fixtures boxes and branch wiring.rem:obtain pe
Jan 23, 2019 · Penalty $400
Resolve - Class - 2
Failure to maintain bldg appurtenances. note: storm water leader at side of bldg defective. remedy: maintain bldg appurtenance. repair/replace storm leader.
Mar 5, 2012
Resolve