Violations at 640 Miller Avenue
Brooklyn, NY 11207 · BBL 3-03827-0036 · Back to the property
HPD housing violations
The newest 50 of 318 HPD violations. The city keeps the complete history.
- BHazardous
Repair the leaky and/or defective faucets at the sink in the kitchen located at apt 1stflo, 1st story
Sep 3, 2026 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approx 4 sq at ceiling in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from south at west original violation 18564776 issued 09-jan-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jan 9, 2026 · Apt 1FL
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 5th room from east at north located at apt 1fl, 1st story, 1st apartment from south at west
Jan 9, 2026 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood sub floor in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from south at west
Jan 9, 2026 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 4 sq at ceiling in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from south at west
Jan 9, 2026 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of drop ceiling in the 5th room from east at south located at apt 1fl, 1st story, 1st apartment from south at west
Jan 9, 2026 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Provide seal-up of one entrance door and (10) windows in the entire apartment located at apt, 2nd story, 1st apartment from south at west
Dec 20, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective paving concrete at basement
Dec 20, 2025
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective water supply pipe at ceiling at basement
Dec 20, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling at basement
Dec 20, 2025
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 5th room from east at north located at apt 1fl, 1st story, 1st apartment from south at west
Dec 20, 2025 · Apt 1FL
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling with acoustic ceiling tiles in the 5th room from east at north located at apt 1fl, 1st story, 1st apartment from south at west
Dec 20, 2025 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 5th room from east at south located at apt 1fl, 1st story, 1st apartment from south at west
Dec 20, 2025 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the 5th room from east at south located at apt 1fl, 1st story, 1st apartment from south at west
Dec 20, 2025 · Apt 1FL
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling with acoustic ceiling tiles in the kitchen located at apt 1fl, 1st story, 1st apartment from south at west
Dec 20, 2025 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 1fl, 1st story, 1st apartment from south at west
Dec 20, 2025 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 3rd room from east located at apt 1fl, 1st story, 1st apartment from south at west
Dec 20, 2025 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 1fl, 1st story, 1st apartment from south at west
Dec 20, 2025 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Dec 10, 2025
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt, 1st story, 1st apartment from south at west
Dec 10, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective brick motar at the east exterior wall from the 2nd story to the parapet wall at the roof
Dec 10, 2025
Open — Nov sent out - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the rubbish at the rear yard
Dec 10, 2025
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective wooden window frame in the bathroom located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden cabinet base in the kitchen located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at the sink in the kitchen located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic ceiling in the kitchen located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic ceiling in the 1st room from east located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective intercom system at public hall, 1st story
Dec 10, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective cold radiator in the 5th room from east at south located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the private hallway located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic ceiling in the 5th room from east at north located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 5th room from east at north located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from east at north located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 5th room from east at north located at apt 1stflo, 1st story, 1st apartment from south at west
Dec 10, 2025 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ,base cabinet at sink in the kitchen located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 25, 2025 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 25, 2025 · Apt 1STFLO
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ,all walls and ceiling in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 25, 2025 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ,wooden floor in the private hallway located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 25, 2025 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ,wooden floor in the 4th room from east at south located at apt 1stflo, 1st story, 1st apartment from south at west
Oct 25, 2025 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Provide seal to all accessible openings of vacant apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Sep 17, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling at basement and public hall
Sep 17, 2025
Closed — Violation closed
DOB building violations
No DOB violations on record
ECB violations
1 ECB violations, newest first.
- Class - 2
Failure to maintain adequate housekeeping per section requirements. noted: at rear yard & driveway > 8 cu yds lumber & household debris. remedy: maintain adequate housekeeping.
Mar 5, 2012 · Penalty $4,000
Active