Violations at 603 Bradford Street
Brooklyn, NY 11207 · BBL 3-03827-0003 · Back to the property
HPD housing violations
The newest 50 of 230 HPD violations. The city keeps the complete history.
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 4th room from east located at apt 1, 1st story, 1st apartment from north at east
Feb 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Feb 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 5th room from east located at apt 1, 1st story, 1st apartment from north at east
Feb 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame in the private hallway located at apt 1, 1st story, 1st apartment from north at east
Feb 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 3rd room from east at south located at apt 1, 1st story, 1st apartment from north at east
Feb 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame in the private hallway located at apt 1, 1st story, 1st apartment from north at east
Feb 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 3rd room from east at south located at apt 1, 1st story, 1st apartment from north at east
Feb 26, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 5th room from east located at apt 1, 1st story, 1st apartment from north at east
Feb 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Feb 26, 2026 · Apt 1
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair or replace the broken or defective closet door at north wall in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Feb 26, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Feb 26, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Feb 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Feb 26, 2026 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at south located at apt 1, 1st story, 1st apartment from north at east
Feb 26, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from east located at apt 1, 1st story, 1st apartment from north at east
Feb 26, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective concrete tread 2nd from bottom at west yard
Feb 20, 2026
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall, south wall in the 1st room from east at north located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st window frame from east at south wall in the 3rd room from east at south located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, 1st window frame from east at south wall, 1st window frame from south at west wall, 2nd window frame from south at west wall, 3rd window frame from south at west wall in the 5th room from east located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 4th room from east located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door from north at east wall, south wall, 1st window frame from east at south wall in the 4th room from east located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall, north wall, east wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at south located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom , the foyer located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door in the private hallway located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the private hallway located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective the 2nd concrete step up from the street level to the 1st floor
Jan 20, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective missing wall cabinets at the north wall and east wall in the kitchen located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Notice of issuance sent to tenant - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Notice of issuance sent to tenant - BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the 1st closet from south at west wall wall in the 1st room from east at north located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance upper sash at the 2nd window from east at south in the 3rd room from east at south located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall and south wall in the foyer located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Replace with new the missing glass at lower sash at the 2nd window from east at south in the 4th room from east located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass at lower sash at the 1st window from north at east in the 1st room from east at south located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic tiles at suspended ceiling in the 1st room from east at north located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Replace with new the missing glass at lower sash window in the 1st room from east at north located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly secure the loose light fixture at the ceiling in the private hallway located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at the ceiling in the bathroom located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, west wall in the 5th room from east located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 1st room from east at south located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the private hallway located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, west wall in the 3rd room from east at south located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 20, 2026 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective concrete tread 2nd tread from the bottom at stairway at the front of the building yard
Jan 18, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and doorframe binding at front entrance to the building
Jan 18, 2026
Closed — Violation closed
DOB building violations
No DOB violations on record
ECB violations
No ECB violations on record