Violations at 591 Wyona Street
Brooklyn, NY 11207 · BBL 3-03826-0006 · Back to the property
HPD housing violations
14 HPD violations, newest first.
- IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts cellar unit 2 (vacate #240810)
Oct 3, 2023
Closed — Violation closed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts cellar unit 1 (vacate #240810)
Oct 3, 2023
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections water closet, washbasin, shower stall, kitchen sink at cellar
Sep 30, 2023
Closed — Violation closed - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas range at cellar
Sep 30, 2023
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at west wall in the private hallway located at apt baseme, 1st story, 1st apartment from north at east
Sep 18, 2023 · Apt BASEME
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the foyer located at apt baseme, 1st story, 1st apartment from north at east
Sep 18, 2023 · Apt BASEME
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt baseme, 1st story, 1st apartment from north at east
Sep 18, 2023 · Apt BASEME
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures to entire apartment in the entire apartment located at apt baseme, 1st story, 1st apartment from north at east
Sep 18, 2023 · Apt BASEME
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Sep 5, 2023
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the foyer located at apt bsmt, 1st apartment from north at east
Aug 29, 2023 · Apt BSMT
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt bsmt, 1st apartment from north at east
Aug 29, 2023 · Apt BSMT
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall in the foyer located at apt bsmt, 1st apartment from north at east
Aug 29, 2023 · Apt BSMT
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tile at floor in the foyer located at apt bsmt, 1st apartment from north at east
Aug 29, 2023 · Apt BSMT
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures to basement apartment in the entire apartment located at apt bsmt, 1st apartment from north at east
Aug 29, 2023 · Apt BSMT
Closed — Violation closed
DOB building violations
2 DOB violations, newest first.
- Unsafe buildings none
Ub-unsafe buildings none
Jan 5, 1993
V%*-dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Jan 5, 1993
Dob violation - active
ECB violations
5 ECB violations, newest first.
- Class - 2
Observed excessive garbage pilled up all around the jobsite, material scattered and unkept. it generated a hazard not only for workers but also for emergency respondent. organize materials, clean up garbage
Jun 1, 2026 · Penalty $1,250
Resolve - Class - 1
At the time of my inspection of a 3 story building active jobsite, i observed workers doing various trades, upon request for construction superintendent none was designated or at jobsite. failure to designate a
Jan 7, 2026 · Penalty $10,000
Resolve - Class - 1
Bc 3314.1 at the time of my inspection of a 3 story building active jobsite, i observed supported pipe scaffold in various places that was not fully plank, no screw jacks and missing cross bracing. failure to
Jan 7, 2026 · Penalty $5,000
Resolve - Class - 1
At the time of my inspection of a 3 story building active jobsite, i observed workers working on roof and at exposure #2 there were a car in driveway adjacent to jobsite with no overhead protection. failure to
Jan 7, 2026 · Penalty $10,000
Resolve - Class - 1
Bc 3303.9 at the time of my inspection of a 3 story building active jobsite, i observed workers on roof and there were no means of egress or ingress to enter the roof, workers used an a frame ladder which was t
Jan 7, 2026 · Penalty $5,000
Resolve