624 Vermont Street
Brooklyn, NY 11207BBL 3-03824-0044Map
Owner of record: Gina Franco, LLC
624 Vermont Street is a walk-up apartment building built in 1910 in Brooklyn, 11207. It has 3 residential units across 2 floors. The owner of record is Gina Franco, LLC. HPD has recorded 98 housing violations here, most recently on October 9, 2026. 23 of the 50 most recent violations are still open.
- HPD violations
- 98
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 98
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 98
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 1, 1st story, 1st apartment from south at west
Oct 9, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and all ceilings in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Oct 9, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Oct 9, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at east,south and west walls in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Oct 9, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Oct 9, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bath tub in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Oct 9, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 2nd room from east located at apt 1, 1st story, 1st apartment from east at south
Aug 31, 2026 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east located at apt 1, 1st story, 1st apartment from east at south
Aug 31, 2026 · Apt 1
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 1, 1st story, 1st apartment from east at south
Aug 31, 2026 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective sub floor in the 2nd room from east located at apt 1, 1st story, 1st apartment from east at south
Aug 31, 2026 · Apt 1
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the 2nd room from east located at apt 1, 1st story, 1st apartment from east at south
Aug 31, 2026 · Apt 1
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 6, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 11, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 27, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 7, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 2, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 13, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 31, 2019
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... 2 sq feet at east wall in the 1st room from east at north located at apt 3, 2nd story, 1st apartment from east at south
May 9, 2018 · Apt 3
Open — Nov sent out - BHazardous
Replace with new the broken or defective window glass at lower window sash in the bathroom located at apt 3, 2nd story, 1st apartment from east at south
May 9, 2018 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the kitchen located at apt 3, 2nd story, 1st apartment from east at south
May 9, 2018 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 1st room from east at south located at apt 3, 2nd story, 1st apartment from east at south
May 9, 2018 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 1st room from east at north located at apt 3, 2nd story, 1st apartment from east at south
May 9, 2018 · Apt 3
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 3, 2nd story, 1st apartment from east at south
May 9, 2018 · Apt 3
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3, 2nd story, 1st apartment from east at south
May 9, 2018 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 2nd story, 1st apartment from east at south
May 9, 2018 · Apt 3
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at south wall at public hall, 2nd story
May 9, 2018
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor at public hall, 1st story
May 9, 2018
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system lock door at boiler room
May 9, 2018
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 2nd story, 1st apartment from east at south
May 5, 2018 · Apt 3
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 3, 2nd story, 1st apartment from east at south
May 5, 2018 · Apt 3
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing located at apt 3, 2nd story, 1st apartment from east at south
May 5, 2018 · Apt 3
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors at entrance to apartment located at apt 3, 2nd story, 1st apartment from east at south
May 5, 2018 · Apt 3
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
May 5, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 5, 2018
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
May 5, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 5, 2018
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
May 5, 2018
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
May 5, 2018
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 30, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 25, 2015
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system cellar door locked at cellar
Jan 17, 2015
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story
Jan 17, 2015 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story
Jan 17, 2015 · Apt 1
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate at kitchen located at apt 1, 1st story
Jan 17, 2015 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, apartment at south
Dec 24, 2014 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door to cellar locked, at public hall, 1st story
Dec 24, 2014
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of constuction material at public hall, 1st story
Jan 15, 2014
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 2, 2nd story
Jan 15, 2014 · Apt 2
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Water leak
Heavy flow
Aug 27, 2026 · Apt 1
Close - Paint/plaster
Ceiling
Aug 27, 2026 · Apt 1
Close - Water leak
Heavy flow
Apr 30, 2026 · Apt 1
Close - Water leak
Heavy flow
Feb 18, 2024 · Apt 1STFLO
Close - Water leak
Slow leak
Jun 13, 2023 · Apt 1
Close - Heat/hot water
Entire building
Dec 23, 2022 · Apt 2R
Close - Heat/hot water
Entire building
Dec 15, 2022 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
Apr 17, 2022 · Apt BLDG
Close - Safety
Smoke detector
Jan 25, 2019 · Apt 2
Close - Safety
Carbon monoxide detector
Jan 25, 2019 · Apt 2
Close
Show 40 more ↓
- Flooring/stairs
Floor
Jan 25, 2019 · Apt 2
Close - Safety
Smoke detector
Jan 15, 2019 · Apt 2
Close - Safety
Carbon monoxide detector
Jan 15, 2019 · Apt 2
Close - Electric
Outlet/switch
Jan 15, 2019 · Apt 2
Close - Flooring/stairs
Floor
Jan 15, 2019 · Apt 2
Close - Safety
Window guard broken/missing
Jan 15, 2019 · Apt 2
Close - Flooring/stairs
Floor
Jan 15, 2019 · Apt 2
Close - Paint/plaster
Wall
May 6, 2018 · Apt 3
Close - Paint/plaster
Ceiling
May 6, 2018 · Apt 3
Close - Safety
Smoke detector
May 6, 2018 · Apt 3
Close - Plumbing
Toilet
May 6, 2018 · Apt 3
Close - Door/window
Window pane
May 6, 2018 · Apt 3
Close - Unsanitary condition
Mold
May 6, 2018 · Apt 3
Close - Heat/hot water
Apartment only
May 3, 2018 · Apt 3
Close - Paint/plaster
Ceiling
Apr 16, 2018 · Apt 3
Close - Door/window
Window pane
Apr 16, 2018 · Apt 3
Close - Heat/hot water
Apartment only
Apr 16, 2018 · Apt 3
Close - Unsanitary condition
Mold
Apr 16, 2018 · Apt 3
Close - Heat/hot water
Apartment only
Apr 11, 2018 · Apt 3
Close - Unsanitary condition
Mold
Apr 11, 2018 · Apt 3
Close - Flooring/stairs
Floor
Apr 10, 2018 · Apt 3
Close - Safety
Smoke detector
Apr 10, 2018 · Apt 3
Close - Heat/hot water
Apartment only
Apr 10, 2018 · Apt 3
Close - Unsanitary condition
Mold
Apr 10, 2018 · Apt 3
Close - Heat/hot water
Apartment only
Apr 8, 2018 · Apt 3
Close - Flooring/stairs
Floor
Jul 27, 2017 · Apt 2R
Close - Flooring/stairs
Floor
Jul 27, 2017 · Apt 2R
Close - Paint/plaster
Wall
Jul 27, 2017 · Apt 2R
Close - Flooring/stairs
Floor
Jul 27, 2017 · Apt 2R
Close - Plumbing
Bathtub/shower
Jul 27, 2017 · Apt 2R
Close - Plumbing
Steam pipe/riser
Jul 27, 2017 · Apt 2R
Close - Heat/hot water
Entire building
Nov 17, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2015 · Apt 1
Close - Heat/hot water
Entire building
Jan 8, 2015 · Apt 1
Close - Heat/hot water
Entire building
Jan 2, 2015 · Apt 2
Close - Heat/hot water
Entire building
Dec 24, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2014 · Apt 1
Close - Heat/hot water
Entire building
Dec 18, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2014 · Apt 3
Close - Heat/hot water
Entire building
Dec 11, 2014 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1910
- Floors
- 2
- Residential units
- 3
- Building area
- 1,890 ft²
- Lot area
- 2,367 ft²
- Zoning
- R6
- Community board
- 305
- Council district
- 42
- Block / lot
- 3824 / 44
- Assessed value
- $46,980
- Landmark / historic district
- No
HPD registration #362027, last renewed Oct 22, 2025.
Questions about 624 Vermont Street
Who owns 624 Vermont Street?
The owner of record in NYC Department of City Planning PLUTO data is Gina Franco, LLC.
Does 624 Vermont Street have violations?
Yes. NYC HPD has recorded 98 housing violations at this property.
Is 624 Vermont Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 624 Vermont Street built?
City records list 1910 as the year it was built.
How many apartments are in 624 Vermont Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.