HPD housing violations

15 HPD violations, newest first.

  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 205, 2nd story, 5th apartment from north at east

    Jul 23, 2026 · Apt 205

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 203, 2nd story, 3rd apartment from north at east

    Jul 23, 2026 · Apt 203

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 211, 2nd story, 5th apartment from south at west

    Jul 23, 2026 · Apt 211

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 107, 1st story, 3rd apartment from south at west

    Jul 23, 2026 · Apt 107

    Open — Not complied with
  • CImmediately hazardous

    Properly repair or replace the broken or defective lock and assembly in the entrance located at apt 401, 4th story, 2nd apartment from north at east

    Jul 23, 2026 · Apt 401

    Closed — Violation closed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 8, 2026

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 107, 1st story, 3rd apartment from south at west

    Jul 11, 2025 · Apt 107

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the ceiling and east wall in the kitchen located at apt 107, 1st story, 3rd apartment from south at west

    Jul 11, 2025 · Apt 107

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 405, 4th story, 5th apartment from north at east

    Feb 18, 2025 · Apt 405

    Open — Defect letter issued
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 604, 6th story, 4th apartment from north at east

    Feb 18, 2025 · Apt 604

    Open — Defect letter issued
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 606, 6th story, 6th apartment from north at east

    Feb 18, 2025 · Apt 606

    Open — Defect letter issued
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 312, 3rd story, 5th apartment from south at west

    Aug 3, 2023 · Apt 312

    Closed — Violation closed
  • ANon-hazardous

    Cleanse to the satisfaction of this department the the floor in the entire apartment located at apt 312, 3rd story, 5th apartment from south at west

    Aug 3, 2023 · Apt 312

    Closed — Violation closed
  • CImmediately hazardous

    Remove device preventing door from being self-closing built in door stop within door in the entrance located at apt 306, 3rd story, 5th apartment from north at east

    Aug 3, 2023 · Apt 306

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges.. in the entrance located at apt 511, 5th story, 5th apartment from south at west

    Jun 22, 2023 · Apt 511

    Closed — Violation closed

DOB building violations

7 DOB violations, newest first.

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 10, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 28, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 28, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 28, 2020

    Dob violation - dismissed

ECB violations

33 ECB violations, newest first.

  • Class - 2

    Provide sc braille on sub celler floor., perform brake maintenance and provide brke tag with date entered in full mm/dd/year., provide up to date elevator maintenance log book., perform and file cat 1 year test

    Jan 18, 2024 · Penalty $3,125

    Active
  • Class - 2

    Bc 3314.3.4 loads imposed letter.noted:at time of my inspection of a new 7 story building construction in progress,building topped off approx.35 workers onsite i observed the building was wrapped with supported

    Jan 28, 2022

    Resolve
  • Class - 2

    28-105.12.8 site conditions contrary to site safety plan.noted:at timeof my inspection of a new 7 story building construction in progress,building topped off approx.35 workers onsite,i observed while reviewing

    Jan 28, 2022

    Resolve
  • Class - 2

    Bc 3303.4.8 inadequate machinery storage.noted:at time of my inspection of a new 7 story building construction in progress,building topped off approx.35 workers onsite i observed a large telescopic forklift was

    Jan 28, 2022

    Resolve
  • Class - 2

    Bc3314.1 supported scf not erected&maintained as per code.atoi on active 7stynb jobsite i observed supported scf 72' in ht installed@exp1,2,3,4.not maintained-planks not tied down&missing safety pins.supported

    Oct 12, 2021 · Penalty $625

    Resolve
  • Class - 2

    Const super failed to perform duties.atoi on active 7stynb jobsite i observed const super hasnt maintained const super's logbook-no entries from 9/27-10/12.cs always aware of this&informed me he hasnt had time

    Oct 12, 2021 · Penalty $2,500

    Resolve
  • Class - 2

    Bc3301.1.2 fire code-fire extinguishers (fdny fc906) atoi on active 7stynb jobsite i observed fire extinguishers on all levels w/blank insp tags&not insp by competent person/signed off.insp&maintain all fire ex

    Oct 12, 2021

    Resolve
  • Class - 2

    Bc3303.4 housekeeping.atoi on active 7stynb jobsite while walking jobsite w/const super i observed large piles of accumulated debris on all fls,blocked egress,&tripping hazards.debris isnt being stored in code

    Oct 12, 2021 · Penalty $625

    Resolve
  • Class - 1

    Docs to be kept onsite atoi on active 7stynb jobsite when asking constsuper for following required onsite docs none could be provided when requested:(1)sws insp logs.(2)preshift meetings for all workers/trades

    Oct 12, 2021 · Penalty $625

    Resolve
  • Class - 2

    Work contrary to design drawings atoi on active 7stynb jobsite i observed supported scf installed@exp1,2,3,4-upon rev of design drawings i observed design drawings state only 2working levels of fully planked de

    Oct 12, 2021

    Resolve
  • Class - 1

    Failure to safeguard all public and property affected by construction operations.at the time of inspection in response to an incident where a worker got injured active jobsite.i observed construction operations

    Aug 13, 2021 · Penalty $10,000

    Resolve
  • Class - 1

    Bc 3306.9.10.3 protection of floor openings.at the time of inspection in response to an incident where a worker got injured active jobsite. i observed multiple unprotected floor openings at roof level that pose

    Aug 13, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction-no gurardrail system.at the time of inspection in responseto an incident where a worker got injured active jobsite.i observed mi

    Aug 13, 2021 · Penalty $12,500

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments.at the time of inspection in response to an incident where a worker got injured active jobsite.i observed construction operati

    Aug 13, 2021

    Resolve
  • Class - 1

    Bc 3314.1 supported pipe scaffold installed not as per code.at the time of inspection in response to an incident where a worker got injured active jobsite.i observed supported pipe scaffold at all exposures and

    Aug 13, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to institute and maintain safety equipment measures.at the time of inspection in response to an incident where a worker got injured while erecting dunnage active jobsite worker taken to hosipital by amb

    Aug 13, 2021 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping at the time of insepction inresponse to an incident where a worker was injured active i observed large amounts of debris throughout jobsite in multiple locations.debris

    Aug 13, 2021 · Penalty $6,250

    Resolve
  • Class - 1

    Sec. 3308.6.1.4 scaffold not fully planked & guardrail not in place. note at time of inspection of a 7 sty bldg at 7 sty stage construction work in progress,i observed that the scaffold was not fully planked &

    Jul 2, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to safeguard-material handling causing partial collapse. note:at time of inspection of a 7 sty bldg at 7 sty stage construction in progress responding to complaint where windows fell out of pallet durin

    Jul 2, 2021

    Resolve
  • Class - 1

    Construction superintendent failed to immediately notify the dept of conditions as required. note: at time of my inspection of a 7 sty bldg at 7 sty stage construction work in progress. responding to an inciden

    Jul 2, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to notify dob immediately of conditions as required. note: at time of inspection of a 7 sty bldg at 7 sty stage construction work inprogress. responding to an incident where it was stated that 4 windows

    Jul 2, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Housekeeping note:ato my insp of 7stynb const work in progress.i observed large amt of const debris&garbage approx 6-5'h on 6fl setback thiscreates hazard for workers&rodent insp.comply w/code request cse for r

    Jun 8, 2021 · Penalty $625

    Resolve
  • Class - 1

    Failure to safeguard all person&property note:ato my insp of 7stynb const work in progress.i observed guardrail system was remove&no controlled access to replace.workers (illegible) of properly they were hook o

    Jun 8, 2021

    Resolve
  • Class - 1

    Bc3314.1 supported pipe scf missing inadequate note:ato my insp of 7stynb const work in progress i observed supported pipe scf missing base plates (mudsills) failure to provide&maintain supported pipe scf as pe

    Jun 8, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Guardrail system-failure to institute & maintain safety measures.note:at the time of my inspection of an active job site,i observed missing guardrails at 2nd fl exp.#1,creating a hazardous falling condition at

    Apr 5, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3309.14 protection of windows.note:at the time of my inspection of an active job site,i observed adjacent property windows close approx. 1 to 2 feet to construction site at exp.#2 & 4.i also observed that th

    Apr 5, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Work does not conform to approved construction documents &/or approvedamendments.note:at the time of my inspection of an active job site,i observed a crane operating on the roadway.review of the site safety pl

    Apr 5, 2021 · Penalty $625

    Resolve
  • Class - 2

    Failure to safeguard public during construction operation note-at the time of my inspection,i observed an active crane occupying roadway & sidewalk.i also observed public coming out of bldg & passing by the cr

    Apr 5, 2021 · Penalty $625

    Resolve
  • Class - 1

    Failure to designate and/or have a construction superintendent present at site as required note at time o finspection of a 7 story building i observed support of excavation operations in progress upon further

    Aug 6, 2020

    Resolve
  • Class - 1

    Failure to notify the department of buildings prior to commencement ofearthwork as per rule 52 requires. excavation/piling operations in progress.upon further review of bis system it was determined gc did not

    Aug 6, 2020

    Resolve
  • Class - 2

    No project information panel jobsite fence note: @time of inspection of a 7 sty bldg, i observed excavation/piling operations in progress @exp#1 there was no project informative panel posted as required on jobs

    Aug 6, 2020 · Penalty $625

    Resolve
  • Class - 1

    Pre-constructing survey note: @time of inspection of a 7 sty building , i observed excavation/pilling operations in progress within 10 feet of adjacent bldg. upon request to const super for pre consttruction

    Aug 6, 2020 · Penalty $312

    Resolve
  • Class - 2

    Failure to provide approved/accepted const document @jobsite @time of inspection.note: @time of inspection of a 7 sty bldg, i observed support of escavation in progress (1c backshore)/the boring operations.

    Aug 6, 2020 · Penalty $312

    Resolve