Violations at 398 Wyona Street
Brooklyn, NY 11207 · BBL 3-03774-0041 · Back to the property
HPD housing violations
21 HPD violations, newest first.
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
May 2, 2024
Open — Info nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from east at south
Apr 30, 2024 · Apt 2
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from east at south
Apr 30, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east at south, the 1st room from east at south, the 1st room from east at north located at apt 2, 2nd story, 1st apartment from east at south
Apr 30, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from north at east wall in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from east at south
Apr 30, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Apr 30, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Apr 30, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective 1st door frame at entrance at west in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Apr 30, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet at wash basin in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Apr 30, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor panel at bottom base cabinet at sink in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Apr 30, 2024 · Apt 2
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Apr 30, 2024 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Apr 30, 2024 · Apt 2
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jan 20, 2017
Open — Info nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling at public hall stairs, 2nd story
Jan 18, 2017
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over ceiling at public hall stairs, 2nd story
Jan 18, 2017
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2, 2nd story
Jan 18, 2017 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2, 2nd story
Jan 18, 2017 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing turn knobs at faucet in bathtub in the bathroom located at apt 2, 2nd story
Jan 18, 2017 · Apt 2
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection at waste pipe to washbasin in the bathroom located at apt 2, 2nd story
Jan 18, 2017 · Apt 2
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective connection at waste pipe sink in the kitchen located at apt 2, 2nd story
Jan 18, 2017 · Apt 2
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at metal gate, front areaway.
Nov 6, 2006
Open — Nov sent out
DOB building violations
No DOB violations on record
ECB violations
No ECB violations on record