roofy

475 Blake Avenue

Brooklyn, NY 11207BBL 3-03768-0001Map

Owner of record: NYC Department Of Education

475 Blake Avenue is a school building built in 1966 in Brooklyn, 11207. The owner of record is NYC Department Of Education. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
14
ECB violations
51
HPD complaints
2

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 14

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 25, 1999

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 25, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
Show 4 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active

ECB violations · 51

  • Class - 2

    Failure to maintain building in code-compliant manner.provide requiredcorridor width per bc 1008.1;27-371(j).security desk is right at the door to enter and exit,it takes 80% of area where it is placed.

    Mar 24, 2026 · Penalty $625

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner. noted: at exit 5, one smoke door do not close properly. remedy: repair/replace.

    Jul 11, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain bldg in compliant manner illumination for exits,exit discharges & public corridors per bc 1006.1;27-381. noted: the following emergency lights are inoperative;em by 125,cafeteria,em#5 at the

    Mar 30, 2021 · Penalty $625

    Resolve
  • Class - 2

    Exit door not self closing. noted: at stair by 426,stair d by 400,smoke at exit 5 by 125,auditorium left stage,& right rear exterior door,smoke door at the bottom entrance to the cellar,exterior exit door at

    Mar 30, 2021 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. noted: at rooms 409406,205 & 106 are not working properly.(the doors)remedy: repair &/or replace.

    Mar 30, 2021 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner no fire stopping perbc 712.3;27-345. noted: at the cellar level electrical meter room;has a large hole above the entrance door. remedy: provide/maintain fire st

    Mar 30, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Exit door not self closing properly,at 4th fl & 3rd fl at stair"bz7e"each floor 1 door & 4rh fl at stair"a"1 door not self xlosing properly.at 2nd fl at stair"d"1 door not self closing properly. at 1st fl in

    Mar 23, 2020 · Penalty $625

    Resolve
  • Class - 2

    Sec. 28-301.1 failure to provide ventilation to gas meter room per p115.6(1968 code),fgc appendix e(e4)(2014 code)at basement in gas meter room no natural or artificial ventilation in gas meter room.

    Mar 23, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner illumination for exits,exit discharges & public corridors per bc 1006.1;27-381 at 1st fl lunch room inside 2 place,2 lights & 3 place 3 lights,outside of lunch

    Mar 23, 2020 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain bldg in code-compliant manner. at 1st floor vestibule of exit 5, door saddle and concrete floor broken and rising unevenly causing a trip hazard.

    Jan 22, 2018

    Resolve
Show 40 more ↓
  • Class - 2

    Reissue: #35177326l glass blocks at stairway b between 1st and 2nd floor are cracked. rmdy: comply with summons.

    Jan 22, 2018

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. note: at time of inspection near stairway b at 1nd floor exterior window glass broken as also in stairway d broken glass. rmdy: comply w/nov.

    Mar 18, 2016

    Resolve
  • Class - 3

    Failure to maintain bldg in code compliant mannernto provide 1/4"thickwired glass vision panel where required as per 27-371(b) noted: at time of inspection throughout bldg (1st,2nd,3rd,4th flrs) at various loca

    Mar 17, 2016

    Resolve
  • Class - 2

    Failure to maintain bldg in code-compliant manner. failure to provide wired glass vision panels per 27-3716 at the following doors 108,105,106,104,103,102,101,118,113,131,auditorium, gymnasium,lunch room,exit 6

    Sep 5, 2015

    Resolve
  • Class - 2

    27-371.re-issue 35102076l the following door have plexiglass or are missing required glass panels:rooms 108,105,106,104,103,102,101,118,113,131 auditorium gymnasium lunch room.exit 6,215,220,213,211,214,209a,20

    Jun 5, 2015

    Resolve
  • Class - 2

    Re-issue 35016947r.exit doors not self closing.the following door are racked or do not close properly:stair door"d" @ 2nd fl.stair door "a"@2nd & 4th fl.exit 6 @ cellar.rem:repair or replace doors.

    Jul 22, 2014

    Resolve
  • Class - 2

    27-371(b),re-issue:35016949k vision panels.extensive use of plexiglassvision panels throughout all fls.plexiglass & thermoplastic use prohibited.rem:provided required glass panels.

    Jul 22, 2014

    Resolve
  • Class - 2

    Re-issue 35016948z.grout missing in tile wall of stair d 1st fl level.rem:make repairs.

    Jul 22, 2014

    Resolve
  • Class - 2

    Use of prohibited door hardware.@ 1st fl exit doors:pins used to lock doors.holes drilled thorugh frame & adjacent door to keep locking mechanism-throughout 1st fl.exterior doors.door stops on the following doo

    Jul 22, 2014

    Resolve
  • Class - 2

    Failure to provide proper corridor width & unobstructed exit passageway.@ kindergarten rooms 11 & 113 & 105 & 107 exits to courtyard obstructed by larage copy machine making fully opening door not possible & bl

    Jul 22, 2014

    Resolve
  • Class - 2

    27-371(b) plexi vission panels installed on doros to rooms 103,104,106,105,108,202,204,203,205,207,208,209,211,214,213,220, cafeteria, gym auditorium and various other locations throughout building. rmdy:provi

    Apr 30, 2013

    Resolve
  • Class - 2

    Reissue 34933310l corridor door at 3rd flr adjacent to room 306 is racked and separating from hinge. corridor doors at 2nd floor adjacentto rooms 203 & 211 drag on floor, and doors racked at stair d 2nd flr.

    Apr 30, 2013

    Resolve
  • Class - 2

    Reissue 34933311n cracks in tile wall of stair d @first floor level. remedy: make necessary repairs.

    Apr 30, 2013

    Resolve
  • Class - 2

    The glazed wall tiles has separated between the mortar creating a 1" wide crack. located at the 1st flr level at stair exit d. remedy: repair/replace glazed wall tiles.

    Feb 10, 2012

    Resolve
  • Class - 2

    The corridor smoke door is dragging on the flr causing doors not to beself-closing located on every flr level. remedy: repair/replace corridor smoke doors.

    Feb 10, 2012

    Resolve
  • Class - 2

    Reissue: 34895356m. excessive amount of combustible material is being hung on walls and lighting fixtures located on the 3rd flr level in the corridor hallway & classrooms. remedy: remove combustible material

    Feb 10, 2012

    Resolve
  • Class - 2

    At 1st flr corridor ceiling by rm 122 & 123 tiles are loose, broken aswell as sub ceiling plywood deteriorating, loose, flaking & bulging due to water damage. remedy: repair/replace defective section of ceiling

    Mar 1, 2011

    Resolve
  • Class - 2

    At 1st flr auditorium, gymnasium & cafeteria. emergency lighting is defective, broken throughout. remedy: repair/replace defective, broken emergency lighting where needed. throughout.

    Mar 1, 2011

    Resolve
  • Class - 2

    Excessive combustible material throughout entire bldg corridor & classroom walls & lighting. consisting of art work, paintings, banners etc.remedy: remove excessive combustible materials throughout corridor and

    Mar 1, 2011

    Resolve
  • Class - 2

    1st flr roof level has become porous & allowing rain water into building corridor by exit "e". remedy: water proof exterior roof.

    Apr 14, 2009

    Resolve
  • Non-hazardous

    27-127 vertical crack in lunchroom approx 12' long in block wall on both sides rem: repair crack

    May 28, 2008

    Resolve
  • Non-hazardous

    27-127 vertival crack on exterior brick next to window @ blake av crack approx entire length rem: (repair)/replace brick

    May 28, 2008

    Resolve
  • Hazardous

    Reissue: 34474408j defective//spalling plaster, ceramic tile walls in rooms 130,132, gym office, storage room. remedy: repair walls.

    Mar 10, 2006

    Resolve
  • Hazardous

    Reissue: 34474407h. water penetration through interior walls at 1st floor gym office and equipment storage rooms, room 130,132 and auditorium wall adjacent to room 130,132. remedy: seal/repair water penetration

    Mar 10, 2006

    Resolve
  • Hazardous

    1) defective hinge rod at corridor door adjacent to room 206,413 causing door to rack 2) missing corridor door adjacent to room 213 3) door racked at exit 3 (stair b) 4th floor exit adjacent to room 400. remedy

    Mar 10, 2006

    Resolve
  • Hazardous

    Missing stair railings at stair b (exit 3) 3rd floor. remedy: replace/repair railings.

    Mar 10, 2006

    Resolve
  • Non-hazardous

    Plaster spalling from walls in room #130 & 132 and plaster ceiling in gym office bathroom is missing and cracked and spalling.remedy:repair plaster walls and ceiling.

    Mar 23, 2005

    Resolve
  • Non-hazardous

    Water penetration through walls (interior) at 1st floor gym office and equipment storage room and rm #130 & 132.remedy:stop water penetration make all necessary repairs.

    Mar 23, 2005

    Resolve
  • Non-hazardous

    "reissue" (34391262m) failure to maintain.defects are first floor corridor 12"x12" ceiling tiles are missing and loose.remedy:repair ceiling

    May 28, 2004

    Resolve
  • Non-hazardous

    Failure to maintain bldg-defect is:cracks at cafeteria and gym walls remedy:maintain bldg make all necessary repair and replacements.

    Jan 16, 2004

    Resolve
  • Non-hazardous

    Failure to maintain.defects are windows defective throughout school inoperable shshes air and water infilration painted shut etc.remedy:maintain bldg make all repairs/replacements forthwith.

    Jan 16, 2004

    Resolve
  • Non-hazardous

    Work without a permit. note concrete yard approx 38'x155' (5,890sf) between auditorium and kindergarten class rooms is completely excavateno permit on file. obtain permit.

    Mar 10, 2003

    Resolve
  • Hazardous

    Failure to maintain. defects are first floor corridor 12"x12" ceiling tilies are missing, loose and bulding at various locations. repair ceiling tiles.

    Mar 10, 2003

    Resolve
  • Non-hazardous

    Failure to maintain. defect is 4th floor boys bathroom partitions loose and sagging. repair bathroom partitons.

    Mar 10, 2003

    Resolve
  • Non-hazardous

    Failure to maintian building. noted defects. hole in fence between school + playyard wrought iron gates has broken hindges on playyard gates. (williams ave). remedy: make repairs.

    Jan 25, 2002

    Resolve
  • Hazardous

    Failure to maintain. defect is; long vertical cracks at walls, below steel girders gymnasium and cafeteria walls found wall in a deteriorating condition remedy- repair open cracks at defective walls

    May 10, 2001

    Resolve
  • Non-hazardous

    Failure to maintain. defect is: at inner coutyard accumulation of water no drains provided. water penetrated into area remedy: pave inner courtyard provide drains

    May 10, 2001

    Resolve
  • Non-hazardous

    Failure to provide emergency light fixture within corridor & vestibule adjoining auditorium,gym & lunchroom also corridor and stair of main buidling on floor 1 to 4.failure to provide emergency power to ligh fi

    Mar 19, 2001

    Resolve
  • Non-hazardous

    Failure to miantain defects are:windows defective throughout school-inoperable sashes,air and water infiltrtion,painted shut etc.9"x9" hallway tiles,1 fl,crack,loose and lifting.cracks at vcafeteria and gymnasi

    May 11, 2000

    Resolve
  • Non-hazardous

    Failure to maintain building. defect is ceremic tiles missing loose on bathroom wall in girls bathroom on first floor. repair or replace.

    May 25, 1999

    Resolve

Complaints

  • Paint/plaster

    Ceiling

    Aug 7, 2021 · Apt 340

    Close
  • Electric

    Power outage

    Sep 18, 2017 · Apt 4A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
School building (W1)
Year built
1966
Floors
4
Residential units
—
Building area
190,120 ft²
Lot area
80,000 ft²
Zoning
R6
Community board
305
Council district
42
Block / lot
3768 / 1
Assessed value
$15,633,000
Landmark / historic district
No

Questions about 475 Blake Avenue

Who owns 475 Blake Avenue?

The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Education.

Does 475 Blake Avenue have violations?

NYC HPD has no housing violations on record for this property.

Is 475 Blake Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 475 Blake Avenue built?

City records list 1966 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.