405 Mother Gaston Blvd
Brooklyn, NY 11212BBL 3-03726-0003Map
Owner of record: 405 Mother Gaston LLC
405 Mother Gaston Blvd is a mixed residential and retail building built in 1930 in Brooklyn, 11212. It has 2 residential units across 3 floors. The owner of record is 405 Mother Gaston LLC. HPD has recorded 21 housing violations here, most recently on December 4, 2024. 21 of the 21 most recent violations are still open.
- HPD violations
- 21
- DOB violations
- 1
- ECB violations
- 10
- HPD complaints
- 34
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 21
- CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Dec 4, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Replace with new the missing radiator cover at west wall in the 4th room from north located at apt 2f, 2nd story, 1st apartment from west at north
Dec 4, 2024 · Apt 2F
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Dec 4, 2024
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3rdfl, 3rd story, 1st apartment from north at east
Oct 24, 2023 · Apt 3RDFL
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3rdfl, 3rd story, 1st apartment from north at east
Oct 24, 2023 · Apt 3RDFL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 3rdfl, 3rd story, 1st apartment from north at east
Oct 24, 2023 · Apt 3RDFL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3rdfl, 3rd story, 1st apartment from north at east
Oct 24, 2023 · Apt 3RDFL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective marble saddle at door way in the kitchen located at apt 3rdfl, 3rd story, 1st apartment from north at east
Oct 24, 2023 · Apt 3RDFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the west wall in the bathroom located at apt 3rdfl, 3rd story, 1st apartment from north at east
Oct 24, 2023 · Apt 3RDFL
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective intercom system at building entrance to intercom system at north wall in the 3rd room from east located at apt 3rdfl, 3rd story, 1st apartment from north at east
Oct 24, 2023 · Apt 3RDFL
Open — Nov sent out
Show 11 more ↓
- BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story
Oct 24, 2023
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak above the ceiling at public hall, 3rd story
Oct 24, 2023
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling at public hall, 3rd story
Oct 24, 2023
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3rdflo, 3rd story, 1st apartment from north at east
Apr 2, 2023 · Apt 3RDFLO
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3rdflo, 3rd story, 1st apartment from north at east
Apr 2, 2023 · Apt 3RDFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3rdflo, 3rd story, 1st apartment from north at east
Apr 2, 2023 · Apt 3RDFLO
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlet at south wall in the 4th room from east at north located at apt 3, 3rd story, 1st apartment from north at east
Apr 2, 2023 · Apt 3
Open — Nov sent out - BHazardous
Properly repair the broken or defective intercom system from entrance to building to intercom system at north wall in the entrance located at apt 3, 3rd story, 1st apartment from north at east
Apr 2, 2023 · Apt 3
Open — Nov sent out - BHazardous
Replace with new the missing baseboard radiator cover at east wall in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Apr 2, 2023 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling at public hall, 3rd story
Apr 2, 2023
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak above the ceiling at public hall, 3rd story
Apr 2, 2023
Open — Nov sent out
DOB building violations · 1
- Construction other optional
C-construction other optional
Mar 24, 1992
Dob violation - active
ECB violations · 10
- Class - 2
Work w/o a permit.work noted:at third flr erected full height partition dividing third floor in half,installed water & waste lines for a 3pcbath,sink,toilet,shower & residential sink & electric line for stove.
Jan 3, 2013 · Penalty $800
Resolve - Class - 2
Residence altered for occupancy as a dwelling for more than the legally approved number of families dob records indicate premises to be a 2-family & store, 1 apt on each flr:now at third flr apartment subdivide
Jan 3, 2013 · Penalty $1,200
Active - Non-hazardous
Work without a permit work noted a canopy 3'x15 brooklyn central pharmacy horizontal canopy sign at front between 1st & 2nd floor. remedy: obtain a permit (or) remove canopy
May 30, 1996 · Penalty $350
Resolve - Hazardous
Failure to provide at least two means of egress from room or space where required defect is secondary means of egress is through boiler roomat basement level labratory. remedy:provide secondary means of egress
Jun 20, 1991 · Penalty $1,150
Resolve - Hazardous
Failure to provide at least two means of egress from room or space where required defect is secondary means of egress is through boker room at basement level lab. remedy: provide secondary kmeans of egress as
May 30, 1991 · Penalty $460
Resolve - Hazardous
Failure to provide at least two means of egress from space where required defect is:secondary means of egress from cellar radiolgy&ultrasound doctors office is through basement boiler room. remedy:provide secon
Apr 29, 1991 · Penalty $1,150
Resolve - Hazardous
Exit door total obstruction:exit door as second means of egress through boiler room is padlocked closed at cellar level remedy:provide secondary means of exit that is unobstructed.
Apr 29, 1991 · Penalty $1,150
Resolve - Hazardous
Exit door: total obstruction . exit door as secondary means egress through boiler room is pad locked closed at basement level. remedy: provide an open secondary means of exit that is unobstructed.
Mar 21, 1991 · Penalty $460
Resolve - Hazardous
Failure to provide at least two means of egress from room or space where required. defect is secondary means of egress is through boilerroom at basement level laboratory. remedy: provide secondary means of
Mar 21, 1991 · Penalty $460
Resolve - Non-hazardous
Occupancy contrary to that allowed by the certificate of occupancy number 64937. use of cellar as a radiological labratory instead of ordinary use. remedy:obtain valid certificate of occupancy or restore premis
Jan 29, 1991 · Penalty $285
Resolve
Complaints
- Heat/hot water
Apartment only
Dec 2, 2024 · Apt 2F
Close - General
Ventilation system
Dec 2, 2024 · Apt 2F
Close - Flooring/stairs
Floor
Mar 6, 2024 · Apt 3RDFLO
Close - Unsanitary condition
Mold
Mar 6, 2024 · Apt 3RDFLO
Close - Flooring/stairs
Floor
Mar 6, 2024 · Apt 3RDFLO
Close - Outside building
Roofing
Mar 6, 2024 · Apt 3RDFLO
Close - General
Bell/buzzer/intercom
Mar 6, 2024 · Apt 3RDFLO
Close - Paint/plaster
Ceiling
Mar 6, 2024 · Apt 3RDFLO
Close - General
Bell/buzzer/intercom
Mar 6, 2024 · Apt 3RDFLO
Close - General
Ventilation system
Mar 6, 2024 · Apt 3RDFLO
Close
Show 24 more ↓
- Flooring/stairs
Floor
Mar 6, 2024 · Apt 3RDFLO
Close - Flooring/stairs
Stairs
Mar 6, 2024 · Apt 3RDFLO
Close - Electric
Wiring
Mar 6, 2024 · Apt 3RDFLO
Close - Unsanitary condition
Pests
Jan 22, 2024 · Apt 3FLOOR
Close - Flooring/stairs
Floor
Jan 22, 2024 · Apt 3FLOOR
Close - Paint/plaster
Wall
Jan 22, 2024 · Apt 3FLOOR
Close - Paint/plaster
Ceiling
Jan 22, 2024 · Apt 3FLOOR
Close - Plumbing
Basin/sink
Jan 22, 2024 · Apt 3FLOOR
Close - Unsanitary condition
Pests
Jan 22, 2024 · Apt 3FLOOR
Close - Unsanitary condition
Pests
Oct 19, 2023 · Apt 3RDFL
Close - Unsanitary condition
Pests
Oct 19, 2023 · Apt 3RDFL
Close - Paint/plaster
Wall
Oct 19, 2023 · Apt 3RDFL
Close - Door/window
Door
Oct 19, 2023 · Apt 3RDFL
Close - Flooring/stairs
Floor
Oct 19, 2023 · Apt 3RDFL
Close - Flooring/stairs
Floor
Oct 19, 2023 · Apt 3RDFL
Close - Door/window
Door
Oct 19, 2023 · Apt 3RDFLO
Close - Electric
Wiring
Mar 25, 2023 · Apt 3
Close - General
Bell/buzzer/intercom
Mar 25, 2023 · Apt 3
Close - Door/window
Door
Feb 7, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 31, 2023 · Apt 3RDFLO
Close - Unsanitary condition
Pests
Jan 31, 2023 · Apt 3RDFLO
Close - Heat/hot water
Entire building
Apr 18, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 18, 2017 · Apt BLDG
Close - Heating
Heat related
Jan 17, 2007 · Apt 3FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1930
- Floors
- 3
- Residential units
- 2
- Building area
- 3,642 ft²
- Lot area
- 1,917 ft²
- Zoning
- R6
- Community board
- 316
- Council district
- 41
- Block / lot
- 3726 / 3
- Assessed value
- $60,480
- Landmark / historic district
- No
Questions about 405 Mother Gaston Blvd
Who owns 405 Mother Gaston Blvd?
The owner of record in NYC Department of City Planning PLUTO data is 405 Mother Gaston LLC.
Does 405 Mother Gaston Blvd have violations?
Yes. NYC HPD has recorded 21 housing violations at this property.
Is 405 Mother Gaston Blvd rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 405 Mother Gaston Blvd built?
City records list 1930 as the year it was built.
How many apartments are in 405 Mother Gaston Blvd?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.