roofy

Violations at 21 Pennsylvania Avenue

Brooklyn, NY 11207 · BBL 3-03660-0005 · Back to the property

HPD housing violations

The newest 50 of 511 HPD violations. The city keeps the complete history.

  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items, building front at fire escape, 3rd story

    Oct 7, 2026

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective intercom system at building front to return buzzer at south wall in the private hallway located at apt 4, 1st story, 2nd apartment from north at east

    Oct 7, 2026 · Apt 4

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 4, 1st story, 2nd apartment from north at east

    Sep 23, 2026 · Apt 4

    Open — Civ14 mailed
  • ANon-hazardous

    Properly repair or replace the broken or defective intercom bell buzzer system from building entrance to south wall in the 2nd room from east located at apt 4, 1st story, 2nd apartment from north at east

    Sep 23, 2026 · Apt 4

    Open — Nov sent out
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots, building front at fire escape, 2nd story

    Sep 4, 2026

    Open — Nov certified on time
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots, at building front at fire escape, 3rd story

    Sep 4, 2026

    Open — Nov certified on time
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective latch, at vestibule at public hall, 1st story

    Sep 4, 2026

    Open — Not complied with
  • CImmediately hazardous

    Provide ready access to buildings heating system door locked at boiler room, 1st story at boiler room

    Sep 4, 2026

    Open — Nov certified on time
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 13, 3rd story, 1st apartment from east at south

    Sep 4, 2026 · Apt 13

    Open — Civ14 mailed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 4th room from east located at apt 13, 3rd story, 1st apartment from east at south

    Sep 4, 2026 · Apt 13

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective light fixure at ceiling in the bathroom located at apt 13, 3rd story, 1st apartment from east at south

    Sep 4, 2026 · Apt 13

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair or replace the broken or defective glass pane, at lower window sash, 2nd from east at south wall in the kitchen located at apt 13, 3rd story, 1st apartment from east at south

    Sep 4, 2026 · Apt 13

    Open — Nov sent out
  • BHazardous

    Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 13, 4th story, 1st apartment from east at south

    Aug 10, 2026 · Apt 13

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 13, 4th story, 1st apartment from east at south

    Aug 10, 2026 · Apt 13

    Open — Nov sent out
  • BHazardous

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at gap at the bottom of the door exceed 3/4 inch in the entrance located at apt 13, 4th story, 1st apartment from east at south

    Aug 10, 2026 · Apt 13

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair or replace the broken or defective broken lower window sash inner glass pane at south wall in the kitchen located at apt 13, 4th story, 1st apartment from east at south

    Aug 10, 2026 · Apt 13

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 13, 4th story, 1st apartment from east at south

    Aug 10, 2026 · Apt 13

    Open — Notice of issuance sent to tenant
  • BHazardous

    Properly repair or replace the broken or defective electrical light switch at north wall in the kitchen located at apt 13, 4th story, 1st apartment from east at south

    Aug 10, 2026 · Apt 13

    Open — Nov sent out
  • BHazardous

    Replace with new the missing lower glass pane at building entrance door

    Jul 29, 2026

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective upper glass pane at building entrance door

    Jul 29, 2026

    Closed — Violation dismissed
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at balcony at building front at fire escape, 3rd story

    Jul 29, 2026

    Closed — Violation dismissed
  • CImmediately hazardous

    Properly repair or replace the broken or defective glass pane at building entrance door , 1st story

    Jul 29, 2026

    Closed — Violation dismissed
  • BHazardous

    Replace with new the missing ceramic tile at east wall in the bathroom located at apt 4, 1st story, 2nd apartment from north at east

    Jul 1, 2026 · Apt 4

    Closed — Violation closed
  • CImmediately hazardous

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Jul 1, 2026

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 1st story, 2nd apartment from north at east

    Jul 1, 2026 · Apt 4

    Closed — Violation closed
  • CImmediately hazardous

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Jun 29, 2026

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 1st story, 2nd apartment from north at east

    Jun 29, 2026 · Apt 4

    Closed — Violation dismissed
  • ANon-hazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the public hall at lobby, 1st story

    Jun 24, 2026

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective inoperative mortise lock on door at building entrance , 1st story

    Jun 16, 2026

    Closed — Violation closed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 13, 3rd story, 1st apartment from east at south

    Jun 16, 2026 · Apt 13

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 13, 3rd story, 1st apartment from east at south

    Jun 16, 2026 · Apt 13

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 13, 3rd story, 1st apartment from east at south

    Jun 16, 2026 · Apt 13

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Provide an adequate supply of gas to the fixtures at the range in the kitchenette located at apt 13, 3rd story, 1st apartment from east at south

    Jun 16, 2026 · Apt 13

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective light fixture switch at the north wall in the kitchenette located at apt 13, 3rd story, 1st apartment from east at south

    Jun 16, 2026 · Apt 13

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair or replace the broken or defective lower glass pane at the 2nd window from east at south in the kitchenette located at apt 13, 3rd story, 1st apartment from east at south

    Jun 16, 2026 · Apt 13

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective entrance door at east in the 4th room from east located at apt 13, 3rd story, 1st apartment from east at south

    Jun 16, 2026 · Apt 13

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at the east wall in the 4th room from east located at apt 13, 3rd story, 1st apartment from east at south

    Jun 16, 2026 · Apt 13

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective connection waste line under the wash basin in the bathroom located at apt 13, 3rd story, 1st apartment from east at south

    Jun 16, 2026 · Apt 13

    Closed — Violation closed
  • BHazardous

    Remove all obstructions and repair all defects in waste line in the bathtub in the bathroom located at apt 13, 3rd story, 1st apartment from east at south

    Jun 16, 2026 · Apt 13

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 13, 3rd story, 1st apartment from east at south

    Jun 16, 2026 · Apt 13

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective light fixture at the ceiling in the bathroom located at apt 13, 3rd story, 1st apartment from east at south

    Jun 16, 2026 · Apt 13

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Jun 8, 2026

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 7, 2nd story, 1st apartment from south at west

    Jun 8, 2026 · Apt 7

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective mortise lock set in the entrance located at apt 7, 2nd story, 1st apartment from south at west

    Jun 8, 2026 · Apt 7

    Closed — Violation dismissed
  • BHazardous

    Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 7, 2nd story, 1st apartment from south at west

    Jun 8, 2026 · Apt 7

    Closed — Violation dismissed
  • ANon-hazardous

    Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 7, 2nd story, 1st apartment from south at west

    Jun 8, 2026 · Apt 7

    Closed — Violation closed
  • CImmediately hazardous

    Properly repair or replace the broken or defective cover at hydronic baseboard radiator in the bathroom located at apt 7, 2nd story, 1st apartment from south at west

    Jun 8, 2026 · Apt 7

    Open — Not complied with
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 7, 2nd story, 1st apartment from south at west

    May 20, 2026 · Apt 7

    Open — False certification
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 7, 2nd story, 1st apartment from south at west

    May 20, 2026 · Apt 7

    Closed — Violation closed
  • BHazardous

    Remove all obstructions and repair all defects in the wasteline at bathtub in the bathroom located at apt 7, 2nd story, 1st apartment from south at west

    May 20, 2026 · Apt 7

    Closed — Violation closed

DOB building violations

25 DOB violations, newest first.

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 7, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 13, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 2, 2010

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - active

ECB violations

15 ECB violations, newest first.

  • Class - 1

    Failure to maintain building in code compliant manner for violation #39164874p. observed a/c units with none or improper installation of brackets in which the a/c units has the potential to fall out of windows.

    Jul 8, 2026 · Penalty $6,250

    Resolve
  • Class - 1

    Atoi observed window-mounted air conditioning units installed without proper supporting brackets or other approved means of secure anchorage at exposure 1 units resting directly on window sashes and/or frames n

    Oct 27, 2025 · Penalty $2,500

    Active
  • Class - 2

    Work without permit at time of inspection observed tankless gas water heater installed in the basement with new plumbing pipes and gas pipes connected to the tank no permit on file with the dept of building., o

    Jul 3, 2025 · Penalty $1,250

    Active
  • Class - 2

    Found navien model#ncb190condensing boiler in apartment #13. work without a permit., maintain boiler; file for permit and get inspected.

    Mar 11, 2025 · Penalty $1,250

    Active
  • Class - 2

    In apt#17 potterton boiler not operating automatically for heat/insufficient hot water/remote switch missing outside boiler room/room light defect/storage/wires exposed/backflow discharge defective/both safety

    May 10, 2021 · Penalty $625

    Active
  • Class - 1

    51:violating condition#51-integrity of baxi boiler in apt 11 is compromised to the extreme rusting conditions.do not operate boiler until all hazardous conditions are immediately corrected and dob is notified t

    Dec 5, 2017 · Penalty $1,000

    Active
  • Class - 2

    6a,50a,15,50b,24b,50c,34b,38,50.(50)hot water from boiler is defective(rons hot for a few seconds then rows cold).(50a)outside combustion anpipe not installed on boiler.(50b)codetector interlocked with boiler n

    Nov 20, 2017 · Penalty $500

    Active
  • Class - 2

    Potterton boiler with mxwp 60 psi is installed in apt. without dob boiler permit.obtain permit and sign off.

    Jul 21, 2017 · Penalty $800

    Active
  • Class - 2

    5a,6a,19b,24b,32a,50a-b. (50)boiler installed inside the apt w/out co detector interlocked w/ boiler. (50a)boiler venting over fire escape. (50b)discharge pipes marrifolded to drain.

    Jul 21, 2017 · Penalty $500

    Active
  • Class - 1

    Failure to correct condition(s) cited in nov 34832026l for work done w/o a permit.(installed class'a' apt @ bsmt)rem:correct condition(s) cited

    Sep 30, 2010 · Penalty $6,000

    Resolve
  • Class - 1

    Fail to correct conditions cited in nov 34832026l for work done w.o a permit. (erected apt at basement etc) remedy: correct conditions cited

    Aug 12, 2010 · Penalty $2,400

    Resolve
  • Class - 2

    Occupancy contrary to that allowed by the c of o 229454 in that (ap) class a apt was constructed in bsmnt full kitchen w/ gas stove 3pc bathroom & bedroom also 2 apts on 1st fl has habitable rooms in bsmnt

    Mar 15, 2010 · Penalty $6,000

    Active
  • Class - 1

    Work w/out permit. work noted: in that class "a" apartments was constructed in basement full kitchen w/gas stove 3 pc bathroom & bedroom. also 2 apartments on 1st fl has habitable rooms in basement. all work do

    Mar 15, 2010 · Penalty $8,000

    Active
  • Class - 2

    Failure to maintain bldg code compliant manner use of prohibited illegal hardware in that fire passageway was locked w/ illegal chain & lock obstructing passageway remedy: remove illegal hardware from fire

    Mar 15, 2010 · Penalty $2,500

    Resolve
  • Non-hazardous

    B4a/50a 19b bq9 50q install back flow preventor on feed water line

    Apr 7, 2004 · Penalty $180

    Active