roofy

Violations at 231 Lott Avenue

Brooklyn, NY 11212 · BBL 3-03617-0036 · Back to the property

HPD housing violations

The newest 50 of 166 HPD violations. The city keeps the complete history.

  • CImmediately hazardous

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Oct 16, 2026

    Open — Nov certified on time
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north

    Oct 16, 2026 · Apt 1B

    Open — Nov certified on time
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north

    Oct 15, 2026 · Apt 3A

    Open — Civ14 mailed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective latch , 2nd story

    Oct 14, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Provide ready access to buildings heating system door locked at cellar at boiler room, 1st story

    Oct 14, 2026

    Open — Nov certified on time
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4a, 4th story, 1st apartment from east at south

    Oct 14, 2026 · Apt 4A

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4a, 4th story, 1st apartment from east at south

    Oct 14, 2026 · Apt 4A

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 1st apartment from east at south

    Oct 14, 2026 · Apt 4A

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Oct 11, 2026 · Apt 1A

    Open — Nov sent out
  • CImmediately hazardous

    Provide ready access to buildings heating system locked door at cellar at boiler room

    Oct 11, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west

    Oct 11, 2026 · Apt 3A

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective latch at entrance to building , 2nd story

    Oct 10, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west

    Oct 10, 2026 · Apt 2A

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 1st apartment from west at north

    Oct 10, 2026 · Apt 4B

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north

    Oct 10, 2026 · Apt 1B

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 4a upper level, 4th story, 1st apartment from west at north

    Aug 29, 2026 · Apt 4A

    Open — Nov sent out
  • BHazardous

    Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 4a upper level, 4th story, 1st apartment from west at north

    Aug 29, 2026 · Apt 4A

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 4a, 4th story, 1st apartment from west at north

    Aug 29, 2026 · Apt 4A

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 4a, 4th story, 1st apartment from west at north

    Aug 29, 2026 · Apt 4A

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair or replace the broken or defective locking assembly at building front entrance door leading to 2nd story at public hall, 2nd story

    Aug 13, 2026

    Closed — Violation closed
  • ANon-hazardous

    Properly repair with similar material the broken or defective wood floor tiles in the foyer located at apt 2a, 2nd story, 1st apartment from east at south

    Aug 13, 2026 · Apt 2A

    Open — Not complied with
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from east at south

    Aug 13, 2026 · Apt 2A

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective latch set at building front entrance door

    May 15, 2026

    Closed — Violation closed
  • BHazardous

    Remove all encumbrances consisting of household items at public hall, 4th story

    May 11, 2026

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective counter balance at lower sash at 1st window at east at south in the 4th room from north located at apt 4b, 4th story, 1st apartment from north at east

    May 11, 2026 · Apt 4B

    Closed — Violation closed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 8, 2026

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 8, 2026

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective bell buzzer intercom system at building entrance to east wall in the private hallway located at apt 1b, 1st story, 1st apartment from west at north

    Apr 4, 2026 · Apt 1B

    Open — First no access to re- inspect violation
  • CImmediately hazardous

    Remove device preventing door from being self-closing door sweeper in the entrance located at apt 4b, 4th story, 1st apartment from north at east

    Mar 19, 2026 · Apt 4B

    Closed — Violation closed
  • BHazardous

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at in the entrance located at apt 4b, 4th story, 1st apartment from north at east

    Mar 19, 2026 · Apt 4B

    Closed — Violation closed
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective as required by nspire nfpa standard 72 in the private hallway located at apt 4b, 4th story, 1st apartment from north at east

    Mar 19, 2026 · Apt 4B

    Closed — Violation closed
  • CImmediately hazardous

    Properly repair or replace the broken or defective counterbalance at lower sash at 1st window at east at south in the 4th room from north located at apt 4b, 4th story, 1st apartment from north at east

    Mar 19, 2026 · Apt 4B

    Closed — Violation dismissed
  • ANon-hazardous

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 4b upper level, 4th story, 1st apartment from north at east

    Mar 19, 2026 · Apt 4B

    Closed — Violation closed
  • BHazardous

    Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 4b lower level, 4th story, 1st apartment from north at east

    Mar 19, 2026 · Apt 4B

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective latch, building front entrance to 2nd story, public hall

    Mar 11, 2026

    Closed — Violation closed
  • ANon-hazardous

    Properly repair or replace the broken or defective intercome system from building entrance to panel at south wall in the foyer located at apt 1b, 1st story, 1st apartment from west at north

    Mar 10, 2026 · Apt 1B

    Open — First no access to re- inspect violation
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at apt 1b, 1st story, 1st apartment from west at north

    Mar 10, 2026 · Apt 1B

    Closed — Violation closed
  • ANon-hazardous

    Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the bathroom located at apt 1b, 1st story, 1st apartment from west at north

    Mar 10, 2026 · Apt 1B

    Closed — Violation closed
  • CImmediately hazardous

    Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 2a, 2nd story, 1st apartment from east at south

    Feb 14, 2026 · Apt 2A

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south

    Feb 14, 2026 · Apt 2A

    Open — Not complied with
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south

    Feb 14, 2026 · Apt 2A

    Open — Defect letter issued
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south

    Feb 14, 2026 · Apt 2A

    Closed — Violation closed
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south

    Feb 14, 2026 · Apt 2A

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective intercom system from building entrance to east wall in the foyer located at apt 1b, 1st story, 1st apartment from west at north

    Feb 5, 2026 · Apt 1B

    Open — First no access to re- inspect violation
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2a, 2nd story, 1st apartment from west at north

    Nov 26, 2025 · Apt 2A

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective light fixture at ceiling in the 2nd room from north located at apt 2a, 2nd story, 1st apartment from west at north

    Nov 26, 2025 · Apt 2A

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 2a, 2nd story, 1st apartment from west at north

    Nov 26, 2025 · Apt 2A

    Open — Not complied with
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 2a, 2nd story, 1st apartment from west at north

    Nov 26, 2025 · Apt 2A

    Open — Not complied with
  • BHazardous

    Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north

    Nov 26, 2025 · Apt 2A

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north

    Nov 26, 2025 · Apt 2A

    Closed — Violation closed

DOB building violations

6 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active

ECB violations

2 ECB violations, newest first.

  • Class - 1

    Failure to institute maintain safety equipment measures no guartd rails noted entry porch 6 to 7 ft high without guard rails pitures dated provide guard rails.

    Apr 22, 2010 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to institute maintain safety equipment measures no guard rail noted entry porch 6 to 7 feet high w/o guard rails pictures dated.provide guard rails

    Apr 22, 2010 · Penalty $2,400

    Resolve