Violations at 231 Lott Avenue
Brooklyn, NY 11212 · BBL 3-03617-0036 · Back to the property
HPD housing violations
The newest 50 of 166 HPD violations. The city keeps the complete history.
- CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Oct 16, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Oct 16, 2026 · Apt 1B
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north
Oct 15, 2026 · Apt 3A
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch , 2nd story
Oct 14, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room, 1st story
Oct 14, 2026
Open — Nov certified on time - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4a, 4th story, 1st apartment from east at south
Oct 14, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4a, 4th story, 1st apartment from east at south
Oct 14, 2026 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 1st apartment from east at south
Oct 14, 2026 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Oct 11, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar at boiler room
Oct 11, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Oct 11, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at entrance to building , 2nd story
Oct 10, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
Oct 10, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 1st apartment from west at north
Oct 10, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Oct 10, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 4a upper level, 4th story, 1st apartment from west at north
Aug 29, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 4a upper level, 4th story, 1st apartment from west at north
Aug 29, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 4a, 4th story, 1st apartment from west at north
Aug 29, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 4a, 4th story, 1st apartment from west at north
Aug 29, 2026 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective locking assembly at building front entrance door leading to 2nd story at public hall, 2nd story
Aug 13, 2026
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor tiles in the foyer located at apt 2a, 2nd story, 1st apartment from east at south
Aug 13, 2026 · Apt 2A
Open — Not complied with - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from east at south
Aug 13, 2026 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building front entrance door
May 15, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 4th story
May 11, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective counter balance at lower sash at 1st window at east at south in the 4th room from north located at apt 4b, 4th story, 1st apartment from north at east
May 11, 2026 · Apt 4B
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective bell buzzer intercom system at building entrance to east wall in the private hallway located at apt 1b, 1st story, 1st apartment from west at north
Apr 4, 2026 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Remove device preventing door from being self-closing door sweeper in the entrance located at apt 4b, 4th story, 1st apartment from north at east
Mar 19, 2026 · Apt 4B
Closed — Violation closed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at in the entrance located at apt 4b, 4th story, 1st apartment from north at east
Mar 19, 2026 · Apt 4B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective as required by nspire nfpa standard 72 in the private hallway located at apt 4b, 4th story, 1st apartment from north at east
Mar 19, 2026 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective counterbalance at lower sash at 1st window at east at south in the 4th room from north located at apt 4b, 4th story, 1st apartment from north at east
Mar 19, 2026 · Apt 4B
Closed — Violation dismissed - ANon-hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 4b upper level, 4th story, 1st apartment from north at east
Mar 19, 2026 · Apt 4B
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 4b lower level, 4th story, 1st apartment from north at east
Mar 19, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch, building front entrance to 2nd story, public hall
Mar 11, 2026
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective intercome system from building entrance to panel at south wall in the foyer located at apt 1b, 1st story, 1st apartment from west at north
Mar 10, 2026 · Apt 1B
Open — First no access to re- inspect violation - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at apt 1b, 1st story, 1st apartment from west at north
Mar 10, 2026 · Apt 1B
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the bathroom located at apt 1b, 1st story, 1st apartment from west at north
Mar 10, 2026 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 2a, 2nd story, 1st apartment from east at south
Feb 14, 2026 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Feb 14, 2026 · Apt 2A
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Feb 14, 2026 · Apt 2A
Open — Defect letter issued - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Feb 14, 2026 · Apt 2A
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Feb 14, 2026 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective intercom system from building entrance to east wall in the foyer located at apt 1b, 1st story, 1st apartment from west at north
Feb 5, 2026 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2a, 2nd story, 1st apartment from west at north
Nov 26, 2025 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 2nd room from north located at apt 2a, 2nd story, 1st apartment from west at north
Nov 26, 2025 · Apt 2A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 2a, 2nd story, 1st apartment from west at north
Nov 26, 2025 · Apt 2A
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 2a, 2nd story, 1st apartment from west at north
Nov 26, 2025 · Apt 2A
Open — Not complied with - BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Nov 26, 2025 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Nov 26, 2025 · Apt 2A
Closed — Violation closed
DOB building violations
6 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active
ECB violations
2 ECB violations, newest first.
- Class - 1
Failure to institute maintain safety equipment measures no guartd rails noted entry porch 6 to 7 ft high without guard rails pitures dated provide guard rails.
Apr 22, 2010 · Penalty $2,400
Resolve - Class - 1
Failure to institute maintain safety equipment measures no guard rail noted entry porch 6 to 7 feet high w/o guard rails pictures dated.provide guard rails
Apr 22, 2010 · Penalty $2,400
Resolve