Violations at 550 Watkins Street
Brooklyn, NY 11212 · BBL 3-03617-0025 · Back to the property
HPD housing violations
The newest 50 of 278 HPD violations. The city keeps the complete history.
- BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 3b, 3rd story, 1st apartment from west at north
Oct 26, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 3a, 3rd story, 1st apartment from east at south
Sep 11, 2026 · Apt 3A
Open — Violation will be reinspected - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Sep 11, 2026 · Apt 3A
Open — Violation will be reinspected - BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Sep 11, 2026 · Apt 3A
Open — Violation will be reinspected - BHazardous
Properly repair or replace the broken or defective latch lock at door in the entrance located at apt 3a, 3rd story, 1st apartment from east at south
Sep 11, 2026 · Apt 3A
Open — Violation will be reinspected - ANon-hazardous
Properly repair with similar material the broken or defective wood floor tiles in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
Sep 10, 2026 · Apt 1A
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Sep 10, 2026 · Apt 1A
Open — Not complied with - ANon-hazardous
Properly repair or replace the broken or defective brawer at base cabinet at east wall in the kitchen located at apt 4b, 4th story, 1st apartment from south at west
Aug 13, 2026 · Apt 4B
Open — Violation will be reinspected - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Aug 13, 2026 · Apt 3A
Open — Violation will be reinspected - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 4a, 4th story, 1st apartment from east at south
Aug 7, 2026 · Apt 4A
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 25, 2026
Open — Nov certified on time - BHazardous
Properly repair or replace the broken or defective counter balance at lower window sash 1st window at east wall in the 1st room from east located at apt 1b, 1st story, 1st apartment from south at west
Jun 25, 2026 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Repair leaky water closet flush pipe connection in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Jun 13, 2026 · Apt 3A
Open — Violation will be reinspected - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Jun 13, 2026 · Apt 3A
Open — Violation will be reinspected - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall in the private hallway located at apt 3a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 3A
Open — Violation will be reinspected - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 3A
Open — Violation will be reinspected - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall in the 4th room from east located at apt 3a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 3A
Open — Violation will be reinspected - BHazardous
Repair the leaky and/or defective water supply pipe at water closet in the bathroom located at apt 3a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 3A
Closed — Violation closed - BHazardous
Properly secure the loose door at storage area under stair well at building front
Jun 10, 2026
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective mortar inbetween bricks at east facade at building front , 1st story
Jun 10, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Jun 10, 2026 · Apt 1A
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Jun 10, 2026 · Apt 1A
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to rear yard in the 4th room from east located at apt 1a, 1st story, 1st apartment from east at south
Jun 10, 2026 · Apt 1A
Open — Violation will be reinspected - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the foyer located at apt 1a, 1st story, 1st apartment from east at south
Jun 10, 2026 · Apt 1A
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in at wasteline at water closet in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Jun 10, 2026 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood frame at door leading to rear yard in the 4th room from east located at apt 1a, 1st story, 1st apartment from east at south
Jun 10, 2026 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges , 1st story
Jun 2, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling at public hall, 2nd story
Jun 2, 2026
Open — Violation will be reinspected - ANon-hazardous
Paint with light colored paint to the satisfaction of this department south wall at public hall, 2nd story
Jun 2, 2026
Open — Violation will be reinspected - BHazardous
Properly repair with similar material the broken or defective fire retardant material at south wall at public hall, 2nd story
Jun 2, 2026
Open — Violation will be reinspected - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall at public hall, 2nd story
Jun 2, 2026
Open — Violation will be reinspected - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2b, 2nd story, 1st apartment from west at north
Jun 2, 2026 · Apt 2B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2b, 2nd story, 1st apartment from west at north
Jun 2, 2026 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2b, 2nd story, 1st apartment from west at north
Jun 2, 2026 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 2b, 2nd story, 1st apartment from west at north
Jun 2, 2026 · Apt 2B
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling, north and west wall in the bathroom located at apt 2b, 2nd story, 1st apartment from west at north
Jun 2, 2026 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 2b, 2nd story, 1st apartment from west at north
Jun 2, 2026 · Apt 2B
Closed — Violation closed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at door in the entrance located at apt 4b, 4th story, 2nd apartment from south at west
May 20, 2026 · Apt 4B
Open — Violation will be reinspected - BHazardous
Repair the broken or defective connection at waste line under sink in the kitchen located at apt 4b, 4th story, 2nd apartment from south at west
May 20, 2026 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from north at west located at apt 4b, 4th story, 2nd apartment from south at west
May 20, 2026 · Apt 4B
Open — Violation will be reinspected - BHazardous
Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
May 18, 2026 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
May 14, 2026 · Apt 2A
Open — Violation will be reinspected - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
May 14, 2026 · Apt 2A
Open — Violation will be reinspected - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
May 14, 2026 · Apt 2A
Open — Violation will be reinspected - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2a, 2nd story, 1st apartment from south at west
May 14, 2026 · Apt 2A
Open — Violation will be reinspected - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 2a, 2nd story, 1st apartment from south at west
May 14, 2026 · Apt 2A
Open — Violation will be reinspected - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
May 14, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
May 14, 2026 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
May 13, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 2nd apartment from south at west
May 13, 2026 · Apt 1B
Closed — Violation closed
DOB building violations
12 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active
ECB violations
1 ECB violations, newest first.
- Class - 1
Failure to institute maintain safety equipment measures no guard rails noted entry porch 6 to 7 ft high w/o guard rails pictures dated remedy provide guard rails.
Apr 22, 2010 · Penalty $2,400
Resolve