roofy

Violations at 550 Watkins Street

Brooklyn, NY 11212 · BBL 3-03617-0025 · Back to the property

HPD housing violations

The newest 50 of 278 HPD violations. The city keeps the complete history.

  • BHazardous

    Properly repair with similar material the broken or defective wood floor in the foyer located at apt 3b, 3rd story, 1st apartment from west at north

    Oct 26, 2026 · Apt 3B

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 3a, 3rd story, 1st apartment from east at south

    Sep 11, 2026 · Apt 3A

    Open — Violation will be reinspected
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south

    Sep 11, 2026 · Apt 3A

    Open — Violation will be reinspected
  • BHazardous

    Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south

    Sep 11, 2026 · Apt 3A

    Open — Violation will be reinspected
  • BHazardous

    Properly repair or replace the broken or defective latch lock at door in the entrance located at apt 3a, 3rd story, 1st apartment from east at south

    Sep 11, 2026 · Apt 3A

    Open — Violation will be reinspected
  • ANon-hazardous

    Properly repair with similar material the broken or defective wood floor tiles in the kitchen located at apt 1a, 1st story, 1st apartment from east at south

    Sep 10, 2026 · Apt 1A

    Open — Not complied with
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Sep 10, 2026 · Apt 1A

    Open — Not complied with
  • ANon-hazardous

    Properly repair or replace the broken or defective brawer at base cabinet at east wall in the kitchen located at apt 4b, 4th story, 1st apartment from south at west

    Aug 13, 2026 · Apt 4B

    Open — Violation will be reinspected
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west

    Aug 13, 2026 · Apt 3A

    Open — Violation will be reinspected
  • CImmediately hazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 4a, 4th story, 1st apartment from east at south

    Aug 7, 2026 · Apt 4A

    Closed — Violation closed
  • ANon-hazardous

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Jun 25, 2026

    Open — Nov certified on time
  • BHazardous

    Properly repair or replace the broken or defective counter balance at lower window sash 1st window at east wall in the 1st room from east located at apt 1b, 1st story, 1st apartment from south at west

    Jun 25, 2026 · Apt 1B

    Closed — Violation dismissed
  • ANon-hazardous

    Repair leaky water closet flush pipe connection in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south

    Jun 13, 2026 · Apt 3A

    Open — Violation will be reinspected
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south

    Jun 13, 2026 · Apt 3A

    Open — Violation will be reinspected
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at north wall in the private hallway located at apt 3a, 3rd story, 1st apartment from south at west

    Jun 10, 2026 · Apt 3A

    Open — Violation will be reinspected
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west

    Jun 10, 2026 · Apt 3A

    Open — Violation will be reinspected
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at west wall in the 4th room from east located at apt 3a, 3rd story, 1st apartment from south at west

    Jun 10, 2026 · Apt 3A

    Open — Violation will be reinspected
  • BHazardous

    Repair the leaky and/or defective water supply pipe at water closet in the bathroom located at apt 3a, 3rd story, 1st apartment from south at west

    Jun 10, 2026 · Apt 3A

    Closed — Violation closed
  • BHazardous

    Properly secure the loose door at storage area under stair well at building front

    Jun 10, 2026

    Open — Not complied with
  • BHazardous

    Properly repair with similar material the broken or defective mortar inbetween bricks at east facade at building front , 1st story

    Jun 10, 2026

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Jun 10, 2026 · Apt 1A

    Open — Not complied with
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Jun 10, 2026 · Apt 1A

    Open — Not complied with
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at door leading to rear yard in the 4th room from east located at apt 1a, 1st story, 1st apartment from east at south

    Jun 10, 2026 · Apt 1A

    Open — Violation will be reinspected
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the foyer located at apt 1a, 1st story, 1st apartment from east at south

    Jun 10, 2026 · Apt 1A

    Closed — Violation closed
  • BHazardous

    Remove all obstructions and repair all defects in at wasteline at water closet in the bathroom located at apt 1a, 1st story, 1st apartment from east at south

    Jun 10, 2026 · Apt 1A

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective wood frame at door leading to rear yard in the 4th room from east located at apt 1a, 1st story, 1st apartment from east at south

    Jun 10, 2026 · Apt 1A

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges , 1st story

    Jun 2, 2026

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective light fixture at ceiling at public hall, 2nd story

    Jun 2, 2026

    Open — Violation will be reinspected
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department south wall at public hall, 2nd story

    Jun 2, 2026

    Open — Violation will be reinspected
  • BHazardous

    Properly repair with similar material the broken or defective fire retardant material at south wall at public hall, 2nd story

    Jun 2, 2026

    Open — Violation will be reinspected
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at south wall at public hall, 2nd story

    Jun 2, 2026

    Open — Violation will be reinspected
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2b, 2nd story, 1st apartment from west at north

    Jun 2, 2026 · Apt 2B

    Closed — Violation closed
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2b, 2nd story, 1st apartment from west at north

    Jun 2, 2026 · Apt 2B

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2b, 2nd story, 1st apartment from west at north

    Jun 2, 2026 · Apt 2B

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 2b, 2nd story, 1st apartment from west at north

    Jun 2, 2026 · Apt 2B

    Closed — Violation closed
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling, north and west wall in the bathroom located at apt 2b, 2nd story, 1st apartment from west at north

    Jun 2, 2026 · Apt 2B

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 2b, 2nd story, 1st apartment from west at north

    Jun 2, 2026 · Apt 2B

    Closed — Violation closed
  • BHazardous

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at door in the entrance located at apt 4b, 4th story, 2nd apartment from south at west

    May 20, 2026 · Apt 4B

    Open — Violation will be reinspected
  • BHazardous

    Repair the broken or defective connection at waste line under sink in the kitchen located at apt 4b, 4th story, 2nd apartment from south at west

    May 20, 2026 · Apt 4B

    Closed — Violation closed
  • CImmediately hazardous

    Properly repair with similar material the broken or defective wood floor in the 4th room from north at west located at apt 4b, 4th story, 2nd apartment from south at west

    May 20, 2026 · Apt 4B

    Open — Violation will be reinspected
  • BHazardous

    Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 4b, 4th story, 1st apartment from west at north

    May 18, 2026 · Apt 4B

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west

    May 14, 2026 · Apt 2A

    Open — Violation will be reinspected
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west

    May 14, 2026 · Apt 2A

    Open — Violation will be reinspected
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west

    May 14, 2026 · Apt 2A

    Open — Violation will be reinspected
  • BHazardous

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2a, 2nd story, 1st apartment from south at west

    May 14, 2026 · Apt 2A

    Open — Violation will be reinspected
  • BHazardous

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 2a, 2nd story, 1st apartment from south at west

    May 14, 2026 · Apt 2A

    Open — Violation will be reinspected
  • CImmediately hazardous

    Provide ready access to buildings heating system door locked at cellar

    May 14, 2026

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    May 14, 2026 · Apt 1A

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide ready access to buildings heating system door locked at cellar

    May 13, 2026

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 2nd apartment from south at west

    May 13, 2026 · Apt 1B

    Closed — Violation closed

DOB building violations

12 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active

ECB violations

1 ECB violations, newest first.

  • Class - 1

    Failure to institute maintain safety equipment measures no guard rails noted entry porch 6 to 7 ft high w/o guard rails pictures dated remedy provide guard rails.

    Apr 22, 2010 · Penalty $2,400

    Resolve