203 Sutter Avenue
Brooklyn, NY 11212BBL 3-03518-0070Map
Owner of record: Mks 209 LLC
203 Sutter Avenue is an elevator apartment building built in 2023 in Brooklyn, 11212. It has 54 residential units across 7 floors. The owner of record is Mks 209 LLC. HPD has recorded 10 housing violations here, most recently on October 3, 2026. 7 of the 10 most recent violations are still open.
- HPD violations
- 10
- DOB violations
- 38
- ECB violations
- 33
- HPD complaints
- 16
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 10
- ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox that is missing at public hall, 1st story
Oct 3, 2026
Open — Nov certified on time - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor that is missing at public hall, 1st story
Oct 3, 2026
Open — Nov certified on time - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings that is missing
Oct 3, 2026
Open — Nov certified on time - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 3, 2026
Open — Nov certified on time - CImmediately hazardous
Properly repair or replace the broken or defective lock and latch assembly at building entrance door at public hall, 1st story
Oct 3, 2026
Open — Nov certified on time - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Oct 3, 2026
Open — Nov certified on time - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Oct 3, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on fire door at west at public hall, 1st story
Jan 23, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch on fire door at south at public hall, 6th story
Jan 23, 2026
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Closed — Violation dismissed
DOB building violations · 38
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 17, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed
Show 28 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Construction other optional
Stop all work, contact the borough commissioner
May 7, 2020
Dob violation - dismissed - Construction other optional
Stop all work contact borough commissioner
May 7, 2020
Dob violation - dismissed - Construction other optional
Stop all work contact the borough commissioner office
May 7, 2020
Dob violation - dismissed - Construction other optional
Stop all work contact the borough.commissioner
May 7, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Construction other optional
Borough commissioner's stop work order/stop all work except to make site safe
Mar 9, 2020
Dob violation - dismissed - Construction other optional
Borough comm stop work order/stop all work except to make site safe
Mar 9, 2020
Dob violation - dismissed - Construction other optional
Borough comm. stop work order/stop all work except to make site safe
Mar 9, 2020
Dob violation - dismissed - Construction other optional
Borough comm. swo order/stop all work except tomake site safe
Mar 9, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Public assembly none
Pa-public assembly none
Feb 13, 1990
Dob violation - dismissed - Public assembly none
Pa-public assembly none
Feb 13, 1990
Dob violation - dismissed
ECB violations · 33
- Class - 3
Hot water heater room@cellar has #4 navien hwh that is inoperable+#5 nanien hwh has condensate leaking, maintain boiler; correct violation+submit certificate of correction
Sep 9, 2026 · Penalty $500
Active - Class - 2
1) inoperative in-car communication. 2) missing cat5 tag.
Jul 20, 2026 · Penalty $1,592
Active - Class - 2
Missing sign, as per fdny, indicating location of controller room. inoperative pit light. defective car phone. exposed wirning at operator motor. keypad entry for machine room prohibited; provide group 2 securi
Mar 30, 2026 · Penalty $625
Resolve - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 30000111834n0001 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Sep 27, 2024 · Penalty $1,562
Resolve - Class - 2
No roof protection. observe 7story nb site up to roof level with incomplete exterior wall while required protection of roof not in place on exp#3 neighbor property 556 hopkinson ave roof to protect the building
Mar 21, 2024 · Penalty $2,500
Resolve - Class - 2
Observed 7 story nb site up to roof level with incomplete exterior wall while required overhead protection equivalent sidewalk shed to code bc 3309.13 not in place on exp. 3 neighbor property 556 thomas s boyla
Mar 21, 2024
Resolve - Class - 1
Observed 7 story nb site up to roof level with incomplete exterior wall while required overhead protection equivalent sidewalk shed to code bc 3309.13 not in place on exp. 3 neighbor property 556 thomas s boyla
Jan 16, 2024 · Penalty $25,000
Resolve - Class - 1
Bc3309.13 protection of adjoining equipment and spaces. observe 7story nb site up to roof level with incomplete exterior wall while required overhead protection equivalent sidewalk shed to code bc3309.13 not in
Nov 17, 2023
Resolve - Class - 1
@nb site exp#4 street observe active boom truck use for overhead material lift operations with no flag person placed on sidewalk to stop pedestrian+inadequate flag person on street to stop vehicle&sites constru
Nov 17, 2023
Resolve - Class - 1
Observe 7story nb site up to roof level with incomplete exterior wall while required protection of roof not in place on exp#3 neighbor property 556 hopkinson ave roof to protect the building, appurtenances, and
Nov 17, 2023 · Penalty $5,000
Resolve
Show 23 more ↓
- Class - 1
At the time of inspection of an 6 story building observed the building was demolished upon searching bis and crm there was no notification of demo sent to department of buildings.
Apr 27, 2023 · Penalty $2,500
Resolve - Class - 1
At time of inspection observed no control zone provided in area where excavator cleaning debris.; bc3301.2, comply with code
Feb 21, 2023 · Penalty $6,250
Resolve - Class - 1
I observed large amount of bricks on top of sidewalk shed and on the ground of public garden adjoining to demolition site created by mechanical demolition broke the shed. upon review of the department records t
Feb 16, 2023 · Penalty $5,000
Resolve - Class - 1
At the time of my inspection of a 6 story building demolition work in progress, i observed large amount of bricks on top of sidewalk shed and on the ground of public garden adjoining to demolition site created
Feb 16, 2023
Resolve - Class - 1
I observed large amount of bricks on top of sidewalk shed and on the ground of public garden adjoining to demolition site created by mechanical demolition broke the shed. upon review of the approved demolition
Feb 16, 2023
Resolve - Class - 1
At the time of my inspection of a 6 story building demolition work in progress, i observed 2" hose crossing the street at exposure # 4 from the fire hydrant and not covered to protect pedestrian. failure to cov
Feb 16, 2023
Resolve - Class - 1
I observed large amount of bricks on top of sidewalk shed and on the ground of public garden adjoining to the demolition site created by mechanical demolition. upon review of the department records there were n
Feb 16, 2023 · Penalty $2,500
Resolve - Class - 2
At time of inspection the following was observed, upon review of dot permits for site, no active permits in system, yodaks and sws are implemented and on site/roadway at exp 1 and 4, requiring permitscomply wit
Sep 2, 2022
Resolve - Class - 2
At time of inspection of site the following was observed, supported scaffolding with active permit installed at exp. #1 is not built to code, netting is not secured and tied to system properly, no maintained as
Sep 2, 2022 · Penalty $625
Resolve - Class - 1
Failure to comply with manufacturer specs for ballast filled barriers on roadway.at time of inspection on a active permit 7 story alt 1 sitei observed the ballast filled roadway barriers in place for protection
Mar 11, 2022 · Penalty $2,500
Resolve - Class - 1
Bc 3307.2.6 & bc 3303.4 failure to comply with bc 3307.2.6 requirements for temporary walkways of clear unobstructed minimum 5 feet wide pedestrian walkway at time of inspection on a active permit 7 story alt 1
Mar 11, 2022
Resolve - Class - 1
Bc 3307.2.1 obstruction of sidewalk/roadway/public way without department of transportation permits for job fence/ballast filled barriers/sidewalk shed/temporary pedestrian walkway.at time of inspection on a ac
Mar 11, 2022 · Penalty $2,500
Resolve - Class - 2
Sidewalk shed does not meet code specs.noted:a sws in place under permit with no lighting working also no maintenance with debris strewn under shed.remedy:conform shed to specs.
Sep 22, 2021
Resolve - Class - 2
Temp const equipment onsite expired permit.atoi jobsite closed i observed temp const fence in place.upon checking bis temp const equipment fence permit expired11/30/20.vi-issued.renew permit.
Aug 12, 2021
Resolve - Class - 2
Failure to comply w/dot regs.atoi jobsite closed i observed pedestrianprotection doesnt meet code specs as per bc3307.2 observed barriers onbway exposure1&4.dot roadway/sidewalk permit expired2/23/20-vi-issued.
Aug 12, 2021 · Penalty $2,400
Resolve - Class - 2
Temporary construction equipment on site-expired permit.at time of inspection job fence permit #32062471z indicates an expiration date of 11-30-2020.construction fence still in place at all exposures.remedy:ren
Jul 8, 2021 · Penalty $625
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection:attime of inspection,a 4ft x 8ft section of said job site fence has collapsed unto the public road way at thomas boyland st.remedy:comply w/co
Jul 8, 2021 · Penalty $500
Resolve - Class - 1
Failure to comply with manufacturer specifications.at time of inspection of a 7 story alt 1 currently at 7th floor i observed sidewalk closed at exp#2&4 pedestrian path created at roadway with yodock system in
Dec 17, 2019 · Penalty $6,250
Resolve - Class - 2
Sec. 3307.1 failure to comply w/approved design documents at time of my inspection i observed a sidewalk shed installed on sidewalks along thomas s boyland st & sutter ave. i observed junior beams along t.s. bo
Aug 8, 2019 · Penalty $1,250
Resolve - Class - 2
Sec. 3307.6.5 failure to maintain adequate illumination beneath sidewalk shed as required by code sidewalk shed erected under job#340336194 along exp#1 inoperable bulbs rendering affected area visibly dark and
Jan 10, 2016
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations.open test pits were not backfilled and the front gate to lot was open creating a hazard to public and property.rmdy: safeguard
Feb 27, 2015 · Penalty $250
Resolve - Hazardous
Failure to maintain exterior building wall: noted: crack and loose masonry at various location of front facade including over entrance of the occupied school: (2) the cornice at building front is rusty and
Jan 24, 2005 · Penalty $800
Resolve - Hazardous
Failure to have approved pa plans available for inspection. remedy: provide approved pa plans for inspection
Aug 2, 1989
Resolve
Complaints
- Electric
Power outage
Oct 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 2, 2026 · Apt BLDG
Close - Plumbing
Water supply
Oct 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 2, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 30, 2026 · Apt 4D
Close - Door/window
Door
Jun 30, 2026 · Apt 4D
Close - General
Bell/buzzer/intercom
Jun 30, 2026 · Apt 4D
Close - Heat/hot water
Entire building
May 11, 2026 · Apt BLDG
Close - General
Mailbox
Apr 25, 2026 · Apt 5
Close - Door/window
Door
Mar 4, 2026 · Apt 6A
Close
Show 6 more ↓
- Plumbing
Toilet
Mar 4, 2026 · Apt 2A
Close - General
Bell/buzzer/intercom
Feb 17, 2026 · Apt 4D
Close - Paint/plaster
Wall
Feb 17, 2026 · Apt 4D
Close - General
Mailbox
Feb 17, 2026 · Apt 4D
Close - Heat/hot water
Apartment only
Jan 21, 2026 · Apt 6C
Close - Unsanitary condition
Garbage/recycling storage
Sep 29, 2020 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2023
- Floors
- 7
- Residential units
- 54
- Building area
- 50,579 ft²
- Lot area
- 12,292 ft²
- Zoning
- R6
- Community board
- 316
- Council district
- 41
- Block / lot
- 3518 / 70
- Assessed value
- $4,108,950
- Landmark / historic district
- No
HPD registration #391511, last renewed Aug 27, 2025.
Questions about 203 Sutter Avenue
Who owns 203 Sutter Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Mks 209 LLC.
Does 203 Sutter Avenue have violations?
Yes. NYC HPD has recorded 10 housing violations at this property.
Is 203 Sutter Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 203 Sutter Avenue built?
City records list 2023 as the year it was built.
How many apartments are in 203 Sutter Avenue?
It has 54 residential units and 55 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.