27 East 98 Street
Brooklyn, NY 11212BBL 3-03508-0010Map
Owner of record: Fields, Ollie
27 East 98 Street is a two-family home built in 1930 in Brooklyn, 11212. It has 2 residential units across 2 floors. The owner of record is Fields, Ollie. HPD has recorded 37 housing violations here, most recently on March 12, 2019. 36 of the 37 most recent violations are still open.
- HPD violations
- 37
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 43
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 37
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceilings throughout in the entire apartment located at apt 1flr, 1st story, 1st apartment from east at south
Mar 12, 2019 · Apt 1FLR
Open — Nov sent out - BHazardous
Replace with new the missing radiator at east wall in the kitchen located at apt 1flr, 1st story, 1st apartment from east at south
Mar 12, 2019 · Apt 1FLR
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass at lower sash east window in the 1st room from east located at apt 1flr, 1st story, 1st apartment from east at south
Mar 12, 2019 · Apt 1FLR
Open — Nov sent out - CImmediately hazardous
Replace with new the missing glass at upper sash east window in the 1st room from east located at apt 1flr, 1st story, 1st apartment from east at south
Mar 12, 2019 · Apt 1FLR
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor, north and south walls in the bathroom located at apt 1flr, 1st story, 1st apartment from east at south
Mar 12, 2019 · Apt 1FLR
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... at ceiling aprox.20 sq.ft, east wall aprox.12 sq.ft and south wall aprox.12 sq.ft in the kitchen located at apt 1flr, 1st story, 1st apartment from east at south
Mar 12, 2019 · Apt 1FLR
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling in the bathroom located at apt 1flr, 1st story, 1st apartment from east at south
Mar 12, 2019 · Apt 1FLR
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceilings and walls in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Jan 29, 2019 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile at wall around bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Jan 29, 2019 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door to rear yard in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
Jan 29, 2019 · Apt 1A
Open — Nov sent out
Show 27 more ↓
- BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1a, 1st story, 1st apartment from east at south
Jan 29, 2019 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door at north closet in the private hallway located at apt 1a, 1st story, 1st apartment from east at south
Jan 29, 2019 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood entrance door in the 1st room from east located at apt 1a, 1st story, 1st apartment from east at south
Jan 29, 2019 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door in the entrance located at apt 1a, 1st story, 1st apartment from east at south
Jan 29, 2019 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective glass at top sahs east 1 window in the 1st room from east located at apt 1a, 1st story, 1st apartment from east at south
Jan 29, 2019 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling in the private hallway located at apt 1a, 1st story, 1st apartment from east at south
Jan 29, 2019 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling in the 3rd room from east located at apt 1a, 1st story, 1st apartment from east at south
Jan 29, 2019 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Jan 29, 2019 · Apt 1A
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jan 15, 2019
Open — Info nov sent out - BHazardous
Properly repair the broken or defective locking device at entrance door in the entrance located at apt 1a, 1st story
Jan 13, 2019 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 1a, 1st story
Jan 13, 2019 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1a, 1st story
Jan 13, 2019 · Apt 1A
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1a, 1st story
Jan 13, 2019 · Apt 1A
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
Jan 8, 2019 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Jan 8, 2019 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east and north wall in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Jan 8, 2019 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 f degrees at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Jan 8, 2019 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door in the entrance located at apt 1a, 1st story, 1st apartment from east at south
Jan 8, 2019 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the broken or defective spring balance at east window lower sash in the 1st room from east at south located at apt 1a, 1st story, 1st apartment from east at south
Jan 8, 2019 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the private hallway located at apt 1a, 1st story, 1st apartment from east at south
Jan 8, 2019 · Apt 1A
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1a, 1st story, 1st apartment from east at south
Jan 8, 2019 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings and alls walls in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Jan 8, 2019 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... 12 sq. ft. at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Jan 8, 2019 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
Jan 8, 2019 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... 72 sq. ft. at ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
Jan 8, 2019 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and north wall in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Jan 8, 2019 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Jan 8, 2019 · Apt 1A
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Safety
Window guard broken/missing
Apr 3, 2020 · Apt 1
Close - Unsanitary condition
Mold
Apr 3, 2020 · Apt 1
Close - Electric
Wiring
Apr 3, 2020 · Apt 1
Close - Paint/plaster
Ceiling
Apr 3, 2020 · Apt 1
Close - Heat/hot water
Entire building
Apr 3, 2020 · Apt 1
Close - Door/window
Window frame
Mar 11, 2019 · Apt 1FLR
Close - Plumbing
Bathtub/shower
Feb 28, 2019 · Apt FLR1A
Close - Electric
Wiring
Feb 28, 2019 · Apt FLR1A
Close - Door/window
Door
Feb 28, 2019 · Apt FLR1A
Close - Heat/hot water
Apartment only
Feb 28, 2019 · Apt FLR1A
Close
Show 33 more ↓
- Flooring/stairs
Floor
Feb 28, 2019 · Apt FLR1A
Close - Door/window
Window frame
Feb 28, 2019 · Apt FLR1A
Close - Heat/hot water
Apartment only
Feb 10, 2019 · Apt 1A
Close - Door/window
Window pane
Jan 29, 2019 · Apt 1A
Close - Door/window
Door
Jan 29, 2019 · Apt 1A
Close - Paint/plaster
Ceiling
Jan 29, 2019 · Apt 1A
Close - Paint/plaster
Ceiling
Jan 29, 2019 · Apt 1A
Close - Door/window
Door
Jan 29, 2019 · Apt 1A
Close - Electric
Wiring
Jan 29, 2019 · Apt 1A
Close - Flooring/stairs
Floor
Jan 29, 2019 · Apt 1A
Close - Paint/plaster
Ceiling
Jan 29, 2019 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 29, 2019 · Apt 1A
Close - Door/window
Door
Jan 29, 2019 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 16, 2019 · Apt 1STFL
Close - Plumbing
Bathtub/shower
Jan 14, 2019 · Apt 1FLOOR
Close - Heat/hot water
Apartment only
Jan 14, 2019 · Apt 1FLOOR
Close - Flooring/stairs
Floor
Jan 14, 2019 · Apt 1FLOOR
Close - Unsanitary condition
Pests
Jan 12, 2019 · Apt 1A
Close - Door/window
Door
Jan 12, 2019 · Apt 1A
Close - Water leak
Slow leak
Jan 12, 2019 · Apt 1A
Close - General
Bell/buzzer/intercom
Jan 12, 2019 · Apt 1A
Close - Water leak
Slow leak
Jan 12, 2019 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 12, 2019 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 7, 2019 · Apt 1A
Close - Unsanitary condition
Mold
Jan 7, 2019 · Apt 1A
Close - Paint/plaster
Ceiling
Jan 7, 2019 · Apt 1A
Close - Paint/plaster
Ceiling
Jan 7, 2019 · Apt 1A
Close - Paint/plaster
Wall
Aug 9, 2017 · Apt 1FL
Close - Plumbing
Basin/sink
Aug 9, 2017 · Apt 1FL
Close - Unsanitary condition
Mold
Aug 9, 2017 · Apt 1FL
Close - Unsanitary condition
Mold
Aug 9, 2017 · Apt 1FL
Close - Heat/hot water
Apartment only
Dec 19, 2016 · Apt FL1
Close - Heating
Heat related
Oct 26, 2013 · Apt NA
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1930
- Floors
- 2
- Residential units
- 2
- Building area
- 3,300 ft²
- Lot area
- 2,000 ft²
- Zoning
- C8-2
- Community board
- 316
- Council district
- 41
- Block / lot
- 3508 / 10
- Assessed value
- $51,300
- Landmark / historic district
- No
Questions about 27 East 98 Street
Who owns 27 East 98 Street?
The owner of record in NYC Department of City Planning PLUTO data is Fields, Ollie.
Does 27 East 98 Street have violations?
Yes. NYC HPD has recorded 37 housing violations at this property.
Is 27 East 98 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 27 East 98 Street built?
City records list 1930 as the year it was built.
How many apartments are in 27 East 98 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.