1388 Bushwick Avenue
Brooklyn, NY 11207BBL 3-03438-0033Map
Owner of record: 1388 Bushwick Ave LLC
1388 Bushwick Avenue is a walk-up apartment building built in 1931 in Brooklyn, 11207. It has 10 residential units across 4 floors. The owner of record is 1388 Bushwick Ave LLC. HPD has recorded 13 housing violations here, most recently on November 24, 2025. 11 of the 13 most recent violations are still open.
- HPD violations
- 13
- DOB violations
- 44
- ECB violations
- 42
- HPD complaints
- 11
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 13
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 24, 2025
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 3, 2024
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 28, 2023
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2022
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 16, 2022
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 21, 2021
Open — Info nov sent out - CImmediately hazardous
Replace with new the missing balusters at public hall stair between 2nd and 3rd story
Aug 14, 2015
Closed — Violation closed - CImmediately hazardous
Replace with new the missing baluster at public hall stair between 1st and 2nd story
Aug 14, 2015
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story
Nov 18, 2007 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin ,mice in the entire apartment located at apt 2, 2nd story
Nov 18, 2007 · Apt 2
Open — Nov sent out
Show 3 more ↓
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the east and west walls in the 3rd room from east at north located at apt 2, 2nd story
Nov 18, 2007 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the north and south walls in the 4th room from east at north located at apt 2, 2nd story
Nov 18, 2007 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the west and south walls in the 2nd room from east at north located at apt 2, 2nd story
Nov 18, 2007 · Apt 2
Open — Nov sent out
DOB building violations · 44
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Construction other optional
Full stop work order issued due to construction superintendent withdrawal. stop all work immediately and make site safe.
Dec 13, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 13, 2024
Dob violation - dismissed - Construction other optional
Emergncy work: 1392 bushwick ave partially collapsed, posing safety risks. demolition ordered. cellar backfill at 1388 required. remedy: backfill: foundation & excavation to sidewalk grade under pe & cs supervision. start by 10/23/24
Oct 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Construction other optional
Adjacnt proprty@exp#2,1392 bushwick av,has been structurally comprmisd due2part'l fnd wall collapse@rear&front.exp#3wall&rear yard slab col- lapsed due2non-confrmng soe on9/5,excav extnds below adjng cellr slab& remedy:comply w code.immed retain nys rdp to provide monitorng plan monitorng plan2include continuous monitorng of the exp#2bldg
Sep 6, 2024
Dob violation - active
Show 34 more ↓
- Construction other optional
Adjacnt proprty@exp#2,1392 bushwick av,has been structurallycompromisd due2part'l fnd wall collapse@rear&front.exp#3wall&rear yardslab colaps due2non-confrmng soe on9/5,excav extnds below adjng cellr slab & wall remedy: comply w code.submit all documents associated w soe applicatn, job # 321386415,no later than 9/11/24
Sep 6, 2024
Dob violation - active - Construction other optional
Adjacnt proprty@exp#2,1392 bushwick av,has been structurallycompromisd due2part'l fnd wall collapse@rear&front.exp#3wall&rear yard slab colap due2non-confrmng soe on9/5,excav extnds below adjng cellr.slab&wall br remedy:comply w code.retain nys rdp2perform struct stabilty inspctn no less than 2x/wk.1st inspctn complted by 9/6&submt by 9/9
Sep 6, 2024
Dob violation - active - Construction other optional
The borough commissioner has ordered all work stopped under application # 321386415 due to the contractor withdrawal.
Feb 14, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Construction other optional
Mechanical demolition without a permit
Jun 30, 2022
Vpw*-violation unserved ecb-work without permit-dismissed - Construction other optional
The borough commissioner has ordered all work stopped immediately under application # 321386558(nb) due to the construction superintendent withdrawal.
Jun 6, 2022
Dob violation - active - Construction other optional
The borough commissioner has ordered all work stopped immediately under application # 321386558(nb) due to the construction superintendent withdrawal.
Jun 6, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 17, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 22, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 42
- Class - 2
Observed fence permit b00113769-i1-fn expired on 04/17/26. construction fence was out of maintenance and supervision, such as having excessive advertisements (bc 3301.9.7), missing nonfrangible acrylic paneling
Jun 15, 2026 · Penalty $6,250
Active - Class - 2
At time of inspection observed: construction fence leaning out at exposure1-4 creating unsafe condition could collapse any moment seriously injuring pedestrians, also some sections covered in non-construction r
Apr 10, 2025 · Penalty $5,000
Active - Class - 2
Temporary construction equipment on site - expired permit. at time of inspection, observed at vacant lot, a construction fence, installed without a valid permit. permit #b00113769-i1-fn expires on 12/28/2024.,
Mar 24, 2025 · Penalty $625
Active - Class - 2
Encroachment into public-right-of-way. at time of inspection observed at construction site, construction fence under permit #b00113769-i1-fnexpires on 12/28/2024, encroached onto public sidewalk. the fence exte
Mar 24, 2025 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code-compliant manner. at time of inspection, observed at construction site (exposures #1 and #4), construction fence is out of plumb, leaning towards sidewalk, posing public saf
Mar 24, 2025
Resolve - Class - 1
At time of inspection on a proposed 4 stories new building at foundation/excavation stage: construction superintendent failure to notify to the department about incident occurred on 2024-09-04 approximatively 4
Sep 5, 2024 · Penalty $2,500
Active - Class - 1
At time of inspection observed: excavation/foundation work that has led to an immediately hazardous condition, structurally compromised adjoining property. temporary shoring sh-101.00 was removed without adequa
Sep 5, 2024 · Penalty $25,000
Active - Class - 1
At time of inspection observed: excavation/foundation work that has led to an immediately hazardous condition, structurally compromised adjoining property. approximately 2 feet over excavation contrary to soe-2
Sep 5, 2024 · Penalty $2,500
Active - Class - 1
At time of inspection on a proposed 4 stories new building at foundation/excavation stage: contractor failure to notify to the department about incident occurred on 2024-09-04 approximatively 4:00 pm and 2024-0
Sep 5, 2024 · Penalty $5,000
Active - Class - 1
At time of inspection observed: pail of soil 6 feet height approximately and materials against wall of adjoining property at exposure# 3 impose load create an unsafe condition for adjacent occupied building, co
Sep 5, 2024 · Penalty $2,500
Active
Show 32 more ↓
- Class - 2
At the time of inspection a 4-story alt 1 jobsite, i observed fence in place at exp.1&4 with excessive graffiti throughout, several blacked out/painted viewing panels.comply with code. maintain construction fen
Jul 7, 2023 · Penalty $5,000
Resolve - Class - 2
At the time of inspection a 4-story alt 1 jobsite, i observed fence in place at exp.1&4, upon research in dob now/bis, found fence permit b00113769-i1-fn expired on 02/21/2020. summon number 35647084l issued o
Jul 7, 2023 · Penalty $1,280
Resolve - Class - 2
Observed jobsite fence at exp#1&4 with excessive graffiti throughout, warped panels, protruding nails, several blacked out/painted viewing panels.
May 1, 2023
Resolve - Class - 2
Temporary construction equipment on site-expired permit.at time of inspection observed construction fence under permit #b00113769-i1-fn expired2/6/23 construction fence structure still in effect on job site vio
Apr 27, 2023 · Penalty $3,125
Resolve - Class - 2
At time of inspection on a closed job site, i observed job site fence in place at expo #1, after review fn permit # b00094917 on dob now which posted on fence, which showed permit expired on 06/11/2022 with no
Nov 29, 2022 · Penalty $6,250
Active - Class - 2
At time of inspection of nb 4 story building vacant inactive job site upon review dob records observed no temporary equipment construction fence permit on systemobtain temporary equipment construction fence pe
Sep 6, 2022
Resolve - Class - 1
Inspection of an 3 story building under a demolition permit, i observed at first floor level mechanical equipment and 5 worker on site. upon review i observed first floor joint have been removed without shore i
Aug 18, 2022 · Penalty $2,500
Resolve - Class - 1
Bc 3306.5.1 deficient drawings-the respondent failed to meet the minimum requirements(ac28-101.2) set forth in bc3306.5.1. bc3306.5.1 mandates demolition drawings to have plans,sections,details,clearly showing
Jun 30, 2022 · Penalty $2,500
Resolve - Class - 1
At time of inspection of a 3-story building under demo i observed that the rear yard of the adjacent property had debris and bricks piled up in and near the doorway and standing area. the lack of protection for
Jun 29, 2022 · Penalty $2,500
Resolve - Class - 1
At time of inspection of a demo site of a 3 story building that was to be demoed by hand, i observed an excavator onsite that was used to demo the building at exposure #3 as per code a permit must be obtained t
Jun 29, 2022 · Penalty $1,250
Resolve - Class - 2
At time of my inspection of a 3 story building under a demo permit, it was revealed that there was no superintendent or competent person onsite while there was active work happening. the lack of proper supervis
Jun 29, 2022 · Penalty $2,500
Resolve - Class - 1
At time of inspection of a 3 story building under demo i observed a large amount of debris at exposure #1 and #3 the highly combustible construction debris should be contained by code to allow for ease of movem
Jun 29, 2022 · Penalty $2,500
Resolve - Class - 2
Jobsite fence not constructed or maintained pursuant to subsection.at time of inspection of a proposed 4 story new building under construction/excavation,i observed a construction fence at exps.1,2,3,4 with the
Apr 9, 2022 · Penalty $500
Resolve - Class - 2
Jobsite fence not const or not maintain pursuant to subsec.noted:atoi of nonactive jobsite.observed jobsite const fence not maintain has a lot of graffiti all over fence also missing plexiglass.comply w/code
Feb 25, 2022 · Penalty $500
Resolve - Class - 2
Bc3301.1.2 failure to comply w/nyc fire code.atoi of proposed 4stynb under const,@excavation stage,i observed aprx3tanks of compressed gases,outside of const fence@exp4,close to exp1 sw,b/w site's const fence&e
Feb 3, 2022
Resolve - Class - 2
Temporary construction equipment permit expired.at time of inspection of proposed 4 story new building inactive jobsite observed construction fence in place.review of dept records revealed temporary constructio
Nov 24, 2021
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39032570l issued on 11/25/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissi
Aug 26, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#39032570l issued on 11/25/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. for b109: failrue to safeguard during excavation &
Jun 15, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39032570l issued on 11/25/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to safeguard a
Apr 29, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39032570l issued on 11/25/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for failure to safeguard
Mar 5, 2021 · Penalty $1,250
Resolve - Class - 1
During excavation and in process of underpinnig adjacent property # 40 cooper st. observed at corner of building exposure 2 + 3 large vertical crack, also noted at rear of building(exp.3) large vertical cracks
Nov 25, 2020 · Penalty $10,000
Resolve - Class - 1
Failure to notify dept.of buidlings prior to start of demo.noted:at the time of my inspection of an demo sign off i uncovered while doing myresearch that the contractor failed to call in before starting demo of
Jul 31, 2020 · Penalty $6,250
Resolve - Class - 2
Constructoin superintendent failed to perform duties per rule.stop work order and violations were issued on this date.(1)no site safety planbin site(2)no overhead protection provided for adjacent property(3)gla
Mar 3, 2020 · Penalty $5,000
Resolve - Class - 1
Bc3301131-site safety plan.note:at the time of my inspection of an active demolition site,demolition operation in progress.upon request for site safety plan for jobs that require the designation of construction
Mar 3, 2020 · Penalty $6,250
Resolve - Class - 2
Failure to institute and maintain temporary equipment measures and temporary construction-overhead protection.note:at the time of my inspection of an active demolition site,i observed demoltion operation at an
Mar 3, 2020 · Penalty $5,000
Resolve - Class - 2
Bc330914-protection of windows.at the time of inspection of 1 story demolition garage observed,at exp#4,theres no protection of windows for adjoining property that face the work and about 2ft away from unenclos
Mar 3, 2020 · Penalty $3,125
Resolve - Class - 1
Permit holder failed to ensure workers receive site safety oreintation note at time of inspection of an active demolition site i observed 4 workers performing demolition activity upon request for siet safety or
Mar 3, 2020 · Penalty $12,500
Resolve - Class - 1
Bc3306983-glass during demolition.at the time of inspection of an active demolition job site observed,during the demolition work in progressand door glass were still in place.prior to the commencement of demoli
Mar 3, 2020 · Penalty $6,250
Resolve - Class - 1
Bc1058-temporary construction equipment(fence)permit.at the time of inspection of 1 story demolition garage observed construction fence in place of exp#1 there is no permit issued as per department records for
Mar 3, 2020 · Penalty $6,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#39003495h issued on 05-29-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Aug 12, 2019 · Penalty $1,250
Resolve - Class - 1
Observed asbestos abatement project on going. asbestos removal going on with 2-ariel lifts from exterior wall at expo # 04 2nd & 3rd floor level. entire pedestrians sidewalk closed at expo # 04 and no flagman p
May 29, 2019 · Penalty $12,500
Resolve - Class - 3
Failure to maintain bldg walls or appurtenances - aluminum siding @ exposure #1 & 4 become displaced & fell to the ground - approx 80% of the siding = remaining sections are loose & in danger of falling.
Mar 20, 2013 · Penalty $500
Resolve
Complaints
- Safety
Window guard broken/missing
Aug 5, 2015 · Apt 2
Close - Safety
Window guard broken/missing
Jun 22, 2015 · Apt 2
Close - Safety
Smoke detector
Jun 22, 2015 · Apt 2
Close - Safety
Carbon monoxide detector
Jun 22, 2015 · Apt 2
Close - Heating
Heat related
Nov 3, 2007 · Apt 2
Close - Appliance
Electric/gas range
Nov 3, 2007 · Apt 2
Close - Nonconst
Vermin
Nov 3, 2007 · Apt 2
Close - Electric
Electric-supply
Apr 18, 2006 · Apt 3
Close - Heating
Heat related
Jan 25, 2004 · Apt BLDG
Close - Heating
Heat related
Jan 16, 2004 · Apt 2
Close
Show 1 more ↓
- Heating
Heat related
Jan 14, 2004 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 4
- Residential units
- 10
- Building area
- 5,448 ft²
- Lot area
- 3,760 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3438 / 33
- Assessed value
- $280,350
- Landmark / historic district
- No
HPD registration #819440, last renewed Sep 24, 2019.
Questions about 1388 Bushwick Avenue
Who owns 1388 Bushwick Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1388 Bushwick Ave LLC.
Does 1388 Bushwick Avenue have violations?
Yes. NYC HPD has recorded 13 housing violations at this property.
Is 1388 Bushwick Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1388 Bushwick Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 1388 Bushwick Avenue?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.