1272 Decatur Street
Brooklyn, NY 11207BBL 3-03436-0017Map
Owner of record: Shlomo Frankl 2 LLC
1272 Decatur Street is a walk-up apartment building built in 1907 in Brooklyn, 11207. It has 6 residential units across 3 floors. The owner of record is Shlomo Frankl 2 LLC. HPD has recorded 140 housing violations here, most recently on June 26, 2026. 6 of the 50 most recent violations are still open.
- HPD violations
- 140
- DOB violations
- 7
- ECB violations
- 1
- HPD complaints
- 121
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 140
- BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Jun 26, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 22, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective cracked, loose,and deteriorated mortar at joints at building front at stoop
Nov 22, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2021
Closed — Violation dismissed - BHazardous
Remove the illegal fastening slide bolt locking device with eye padlocked at door leading to basemet, at public hall, 1st story
Apr 8, 2020
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door to boiler room is locked at cellar
Mar 20, 2020
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system incorrect information at public hall, 1st story
Mar 20, 2020
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 3rd story
Mar 20, 2020
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective located at apt 3l, 3rd story, 1st apartment from north at east
Mar 20, 2020 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Mar 20, 2020
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 3l, 3rd story, 1st apartment from north at east
Mar 20, 2020 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east
Mar 20, 2020 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east
Mar 20, 2020 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east
Mar 20, 2020 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors in the entrance located at apt 3l, 1st story
Mar 9, 2020 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 3rd room from north located at apt 3l, 3rd story, 1st apartment from north at east
Feb 21, 2020 · Apt 3L
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east
Feb 21, 2020 · Apt 3L
Open — Defect letter issued - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east
Feb 21, 2020 · Apt 3L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, east wall, south wall in the 2nd room from north located at apt 3l, 3rd story, 1st apartment from north at east
Feb 21, 2020 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door frame, 1st closet from south at west wall door in the 3rd room from north located at apt 3l, 3rd story, 1st apartment from north at east
Feb 21, 2020 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north, the 1st room from north located at apt 3l, 3rd story, 1st apartment from north at east
Feb 21, 2020 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east
Feb 21, 2020 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east
Feb 21, 2020 · Apt 3L
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective ceramic floor tiles in the bathroom located at apt 3l, 3rd story, 1st apartment from north at east
Feb 21, 2020 · Apt 3L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from north located at apt 3l, 3rd story, 1st apartment from north at east
Feb 21, 2020 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from east at south wall in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east
Feb 21, 2020 · Apt 3L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, north wall in the 3rd room from north located at apt 3l, 3rd story, 1st apartment from north at east
Feb 21, 2020 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 3rd room from north located at apt 3l, 3rd story, 1st apartment from north at east
Jan 21, 2020 · Apt 3L
Open — Defect letter issued - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; located at apt 3l, 3rd story, 1st apartment from north at east
Jan 21, 2020 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east
Jan 21, 2020 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 3l, 3rd story, 1st apartment from north at east
Jan 21, 2020 · Apt 3L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east
Jan 21, 2020 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 3rd bathroom from north located at apt 3l, 3rd story, 1st apartment from north at east
Jan 21, 2020 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, east wall, west wall in the 2nd room from north located at apt 3l, 3rd story, 1st apartment from north at east
Jan 21, 2020 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east
Jan 21, 2020 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 3rd bathroom from north located at apt 3l, 3rd story, 1st apartment from north at east
Jan 21, 2020 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall, west wall in the 2nd room from north located at apt 3l, 3rd story, 1st apartment from north at east
Jan 21, 2020 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east
Jan 21, 2020 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Oct 2, 2019 · Apt 3L
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Oct 2, 2019 · Apt 3L
Open — Defect letter issued - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Oct 2, 2019 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 3rd room from east, the 4th room from east, the kitchen , the 5th room from east located at apt 3l, 3rd story, 1st apartment from west at north
Oct 2, 2019 · Apt 3L
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx. 2 sq ft at the 1st window frame from south at west wall in the 5th room from east located at apt 3l, 3rd story, 1st apartment from west at north
Oct 2, 2019 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall, south wall, west wall in the bathroom located at apt 3l, 3rd story, 1st apartment from west at north
Oct 2, 2019 · Apt 3L
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 3rd room from east located at apt 3l, 3rd story, 1st apartment from west at north
Oct 2, 2019 · Apt 3L
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 4th room from east located at apt 3l, 3rd story, 1st apartment from west at north
Oct 2, 2019 · Apt 3L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3l, 3rd story, 1st apartment from west at north
Oct 2, 2019 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Refit the 1st door from north at east in the 4th room from east located at apt 3l, 3rd story, 1st apartment from west at north
Oct 2, 2019 · Apt 3L
Closed — Violation closed - BHazardous
Repair the broken or defective connection drain pipe at the wsh basin in the bathroom located at apt 3l, 3rd story, 1st apartment from west at north
Oct 2, 2019 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective spring balance lower sash window in the bathroom located at apt 3l, 3rd story, 1st apartment from west at north
Oct 2, 2019 · Apt 3L
Closed — Violation dismissed
DOB building violations · 7
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 14, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed
ECB violations · 1
- Class - 1
Failure to maintain bldg wall(s) or appurtenances. noted: at exp#1, broken,cracked,defective sep treads, defetive handrail. hazardous to tenants as it is a full hazard. rmdy: maintain exterior building wall.
Sep 13, 2016 · Penalty $5,000
Resolve
Complaints
- Water leak
Slow leak
May 20, 2026 · Apt 2R
Close - Unsanitary condition
Mold
Nov 6, 2025 · Apt 2R
Close - Heat/hot water
Entire building
Jan 17, 2024 · Apt BLDG
Close - Appliance
Electric/gas range
Nov 14, 2022 · Apt 2L
Close - Electric
Power outage
Nov 14, 2022 · Apt 2L
Close - Water leak
Slow leak
Nov 14, 2022 · Apt 2L
Close - Heat/hot water
Entire building
Nov 17, 2020 · Apt 1R
Close - Heat/hot water
Apartment only
Mar 19, 2020 · Apt 3L
Close - Unsanitary condition
Mold
Feb 20, 2020 · Apt 3L
Close - Paint/plaster
Wall
Feb 20, 2020 · Apt 3L
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 21, 2020 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 20, 2020 · Apt 3L
Close - Heat/hot water
Entire building
Jan 20, 2020 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 17, 2020 · Apt 3L
Close - Plumbing
Radiator
Sep 27, 2019 · Apt 3L
Close - Paint/plaster
Wall
Sep 27, 2019 · Apt 3L
Close - Flooring/stairs
Floor
Sep 27, 2019 · Apt 3L
Close - Door/window
Window frame
Sep 27, 2019 · Apt 3L
Close - Door/window
Door
Sep 27, 2019 · Apt 3L
Close - Plumbing
Basin/sink
Sep 27, 2019 · Apt 3L
Close - Door/window
Door frame
Sep 27, 2019 · Apt 3L
Close - Unsanitary condition
Mold
Sep 27, 2019 · Apt 3L
Close - Door/window
Window frame
Sep 27, 2019 · Apt 3L
Close - Unsanitary condition
Pests
Sep 27, 2019 · Apt 3L
Close - Paint/plaster
Ceiling
Aug 16, 2019 · Apt 2L
Close - Unsanitary condition
Mold
Aug 16, 2019 · Apt 2L
Close - Safety
Carbon monoxide detector
Dec 22, 2017 · Apt 1R
Close - Safety
Smoke detector
Dec 22, 2017 · Apt 1R
Close - Unsanitary condition
Mold
Dec 22, 2017 · Apt 1R
Close - Heat/hot water
Apartment only
Nov 30, 2017 · Apt 3L
Close - Heat/hot water
Apartment only
Nov 10, 2017 · Apt 3L
Close - Door/window
Window frame
Oct 17, 2017 · Apt 3L
Close - Unsanitary condition
Pests
Oct 17, 2017 · Apt 3L
Close - Plumbing
Basin/sink
Oct 17, 2017 · Apt 3L
Close - Electric
Lighting
Sep 16, 2016 · Apt 3L
Close - Unsanitary condition
Pests
Sep 16, 2016 · Apt 3L
Close - Appliance
Electric/gas range
Sep 16, 2016 · Apt 3L
Close - Door/window
Window frame
Sep 16, 2016 · Apt 3L
Close - Appliance
Electric/gas range
May 25, 2016 · Apt 3L
Close - Door/window
Window frame
May 25, 2016 · Apt 3L
Close - Unsanitary condition
Pests
May 3, 2016 · Apt 3L
Close - Door/window
Window pane
May 3, 2016 · Apt 3L
Close - Electric
Power outage
Jan 27, 2016 · Apt 3L
Close - Safety
Fire escape
Dec 31, 2015 · Apt 2R
Close - Unsanitary condition
Mold
Dec 31, 2015 · Apt 2R
Close - Unsanitary condition
Pests
Dec 31, 2015 · Apt 2R
Close - Heat/hot water
Entire building
Nov 20, 2015 · Apt 3L
Close - Heat/hot water
Entire building
Nov 12, 2015 · Apt 3L
Close - Door/window
Window frame
Nov 12, 2015 · Apt 3L
Close - Paint/plaster
Ceiling
Oct 2, 2015 · Apt 1L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1907
- Floors
- 3
- Residential units
- 6
- Building area
- 4,725 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3436 / 17
- Assessed value
- $486,000
- Landmark / historic district
- No
HPD registration #301682, last renewed Jul 9, 2025.
Questions about 1272 Decatur Street
Who owns 1272 Decatur Street?
The owner of record in NYC Department of City Planning PLUTO data is Shlomo Frankl 2 LLC.
Does 1272 Decatur Street have violations?
Yes. NYC HPD has recorded 140 housing violations at this property.
Is 1272 Decatur Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1272 Decatur Street built?
City records list 1907 as the year it was built.
How many apartments are in 1272 Decatur Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.