roofy

234 Schaefer Street

Brooklyn, NY 11207BBL 3-03430-0119Map

Owner of record: 436 Throop LLC

234 Schaefer Street is a walk-up apartment building built in 1931 in Brooklyn, 11207. It has 3 residential units across 3 floors. The owner of record is 436 Throop LLC. HPD has recorded 38 housing violations here, most recently on March 15, 2022.

HPD violations
38
DOB violations
0
ECB violations
0
HPD complaints
25

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Mar 15, 2022

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 38

  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Mar 15, 2022

    Closed — Violation dismissed
  • A

    Remove device preventing door from being self-closing at vestibule door at public hall, 1st story

    Mar 15, 2022

    Closed — Violation dismissed
  • A

    Remove device preventing door from being self-closing at building entrance door at public hall, 1st story

    Mar 15, 2022

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Mar 15, 2022

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Mar 15, 2022

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing at public hall, 1st story

    Mar 15, 2022

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Mar 15, 2022

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 15, 2022

    Closed — Violation dismissed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the 2nd bathroom from east located at apt 1, 1st story, 1st apartment from east at south

    Mar 15, 2022 · Apt 1

    Closed — Violation dismissed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the 1st bathroom from east located at apt 1, 1st story, 1st apartment from east at south

    Mar 15, 2022 · Apt 1

    Closed — Violation dismissed
Show 28 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 1, 1st story, 1st apartment from east at south

    Mar 15, 2022 · Apt 1

    Closed — Violation dismissed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of electrical wires at ceiling in the 1st room from north located at apt 1, 1st story, 1st apartment from east at south

    Mar 15, 2022 · Apt 1

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Mar 15, 2022 · Apt 1

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Mar 15, 2022 · Apt 1

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Mar 15, 2022 · Apt 1

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective light fixture at ceiling in the 1st room from north located at apt 1, 1st story, 1st apartment from east at south

    Mar 15, 2022 · Apt 1

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 2, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 13, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 14, 2015

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling, in the kitchen located at apt 1fl, 1st story, 1st apartment from north at east

    Apr 3, 2007 · Apt 1FL

    Closed — Violation closed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling, in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from north at east

    Apr 3, 2007 · Apt 1FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic wall tile at north wall, in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east

    Apr 3, 2007 · Apt 1FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tile, in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east

    Apr 3, 2007 · Apt 1FL

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall, west wall in the private hallway located at apt 1fl, 1st story, 1st apartment from north at east

    Mar 12, 2007 · Apt 1FL

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall ceiling, north wall, ceiling in the private hallway located at apt 1fl, 1st story, 1st apartment from north at east

    Mar 12, 2007 · Apt 1FL

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ... in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from north at east

    Mar 12, 2007 · Apt 1FL

    Closed — Violation closed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from north at east

    Mar 12, 2007 · Apt 1FL

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the west wall, ceiling in the 3rd room from east located at apt 1fl, 1st story, 1st apartment from north at east

    Mar 12, 2007 · Apt 1FL

    Closed — Violation closed
  • B

    Replace or repair the self-closing doors that is missing or defective at entrance in the foyer located at apt 1fl, 1st story, 1st apartment from north at east

    Mar 12, 2007 · Apt 1FL

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east

    Mar 12, 2007 · Apt 1FL

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, ceiling, east wall in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east

    Mar 12, 2007 · Apt 1FL

    Closed — Violation closed
  • B

    Replace with new the broken or defective cracked glass at upper sash inner pane at west window in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east

    Mar 12, 2007 · Apt 1FL

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at west wall and floor in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east

    Mar 12, 2007 · Apt 1FL

    Closed — Violation closed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling and south wall in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east

    Mar 12, 2007 · Apt 1FL

    Closed — Violation closed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling in the kitchen located at apt 1fl, 1st story, 1st apartment from north at east

    Mar 12, 2007 · Apt 1FL

    Closed — Violation closed
  • B

    Repair the leaky and/or defective water supply pipe under the basin sink in the kitchen located at apt 1fl, 1st story, 1st apartment from north at east

    Mar 12, 2007 · Apt 1FL

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1fl, 1st story, 1st apartment from north at east

    Mar 12, 2007 · Apt 1FL

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of exposed electrical wires at ceiling in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from north at east

    Mar 12, 2007 · Apt 1FL

    Closed — Violation closed

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Plumbing

    Radiator

    Mar 9, 2022 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Mar 9, 2022 · Apt 1

    Close
  • Appliance

    Refrigerator

    Mar 9, 2022 · Apt 1

    Close
  • Door/window

    Door

    Mar 9, 2022 · Apt 1

    Close
  • Electric

    Outlet/switch

    Mar 9, 2022 · Apt 1

    Close
  • Paint/plaster

    Wall

    Apr 2, 2007 · Apt 1FL

    Close
  • General

    Mold

    Apr 2, 2007 · Apt 1FL

    Close
  • Plumbing

    Basin/sink

    Apr 2, 2007 · Apt 1FL

    Close
  • General

    Floor

    Apr 2, 2007 · Apt 1FL

    Close
  • Paint/plaster

    Ceiling

    Apr 2, 2007 · Apt 1FL

    Close
Show 15 more ↓
  • General

    Floor

    Apr 2, 2007 · Apt 1FL

    Close
  • Paint/plaster

    Wall

    Apr 2, 2007 · Apt 1FL

    Close
  • Paint/plaster

    Ceiling

    Mar 9, 2007 · Apt 1FL

    Close
  • Paint/plaster

    Wall

    Mar 9, 2007 · Apt 1FL

    Close
  • Plumbing

    Basin/sink

    Mar 9, 2007 · Apt 1FL

    Close
  • General

    Mold

    Mar 9, 2007 · Apt 1FL

    Close
  • Heating

    Heat related

    Feb 8, 2007 · Apt 1FL

    Close
  • Heating

    Heat related

    Nov 4, 2006 · Apt 1FL

    Close
  • General

    Mold

    Jul 5, 2006 · Apt 1FL

    Close
  • Paint/plaster

    Ceiling

    Jul 5, 2006 · Apt 1FL

    Close
  • Heating

    Heat related

    Dec 27, 2005 · Apt 1FL

    Close
  • Electric

    Electric-supply

    Jul 3, 2003 · Apt 1

    Close
  • Plumbing

    Water supply

    Apr 14, 2003 · Apt 1FL

    Close
  • Plumbing

    Water supply

    Apr 14, 2003 · Apt 1FL

    Close
  • Heating

    Heat related

    Apr 5, 2003 · Apt 1FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1931
Floors
3
Residential units
3
Building area
3,600 ft²
Lot area
2,000 ft²
Zoning
R6
Community board
304
Council district
37
Block / lot
3430 / 119
Assessed value
$122,760
Landmark / historic district
No

HPD registration #334491, last renewed Jul 7, 2025.

Questions about 234 Schaefer Street

Who owns 234 Schaefer Street?

The owner of record in NYC Department of City Planning PLUTO data is 436 Throop LLC.

Does 234 Schaefer Street have violations?

Yes. NYC HPD has recorded 38 housing violations at this property.

Is 234 Schaefer Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 234 Schaefer Street built?

City records list 1931 as the year it was built.

How many apartments are in 234 Schaefer Street?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.