221 Schaefer Street

Brooklyn, NY 11207BBL 3-03424-0068Map

Owner of record: 221 Schaefer Realty, LLC

221 Schaefer Street is a walk-up apartment building built in 1910 in Brooklyn, 11207. It has 3 residential units across 2 floors. The owner of record is 221 Schaefer Realty, LLC. HPD has recorded 34 housing violations here, most recently on April 11, 2024. 4 of the 34 most recent violations are still open.

HPD violations
34
DOB violations
11
ECB violations
29
HPD complaints
169

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 11, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 34

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 11, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 24, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 7, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 2, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 13, 2021

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Jun 29, 2020

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Jun 29, 2020

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jun 29, 2020

    Open — Nov sent out
  • B

    Repair or replace the smoke detector : missing in the entire apartment located at apt 3, 3rd story

    Feb 21, 2018 · Apt 3

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). : missing in the entire apartment located at apt 3, 3rd story

    Feb 21, 2018 · Apt 3

    Closed — Violation closed
Show 24 more ↓
  • B

    M/d law abate the nuisance consisting of concealed water leak at west wall in the foyer located at apt 3, 2nd story, 1st apartment from south at west

    Apr 4, 2010 · Apt 3

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, ceiling in the foyer located at apt 3, 2nd story, 1st apartment from south at west

    Apr 4, 2010 · Apt 3

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall in the 4th room from north at east located at apt 3, 2nd story, 1st apartment from south at west

    Apr 4, 2010 · Apt 3

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall in the 4th room from north at west located at apt 3, 2nd story, 1st apartment from south at west

    Apr 4, 2010 · Apt 3

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the west wall in the kitchen located at apt 3, 2nd story, 1st apartment from south at west

    Apr 4, 2010 · Apt 3

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the kitchen located at apt 3, 2nd story, 1st apartment from south at west

    Apr 4, 2010 · Apt 3

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west

    Apr 4, 2010 · Apt 3

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west

    Apr 4, 2010 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) south wall, west wall in the foyer located at apt 3, 2nd story, 1st apartment from south at west

    Apr 4, 2010 · Apt 3

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north, the 1st room from north at east located at apt 3, 2nd story, 1st apartment from south at west

    Apr 4, 2010 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) west wall in the bathroom located at apt 3, 2nd story, 1st apartment from south at west

    Apr 4, 2010 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt 3, 2nd story, 1st apartment from south at west

    Apr 4, 2010 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) west wall in the 4th room from north at east located at apt 3, 2nd story, 1st apartment from south at west

    Apr 4, 2010 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 3rd window frame from east at south wall in the 4th room from north at west located at apt 3, 2nd story, 1st apartment from south at west

    Apr 4, 2010 · Apt 3

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door to cellar locked at public hall, 1st story

    Mar 30, 2010

    Open — Nov sent out
  • B

    Repair or replace the smoke detector inoperable in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west

    Mar 30, 2010 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, 1st window frame from south at west wall, 1st window sash from south at west wall in the bathroom located at apt 3flr, 3rd story, 1st apartment from east at south

    Jun 2, 2009 · Apt 3FLR

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 3rd room from east at north located at apt 3flr, 3rd story, 1st apartment from east at south

    Jun 2, 2009 · Apt 3FLR

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 2nd room from east at south located at apt 3flr, 3rd story, 1st apartment from east at south

    Jun 2, 2009 · Apt 3FLR

    Closed — Violation closed
  • C

    Replace with new the broken or defective glass at upper sash at south window in the kitchen located at apt 1, 1st story, 1st apartment from south at west

    Mar 26, 2009 · Apt 1

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the bathroom located at apt 1, 1st story, 1st apartment from south at west

    Mar 26, 2009 · Apt 1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at north wall, baseboard at east wall, baseboard at west wall, ceiling, 1st door frame from west at north wall, north wall, east wall, west wall in the 2nd room from north located at apt 2fl, 1st story, 1st apartment from west at north

    Nov 3, 2004 · Apt 2FL

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at west wall, 1st door frame from east at south wall, 1st radiator from west at north wall, north wall, west wall, 1st window frame from west at north wall in the 1st kitchen from north at east located at apt 2fl, 1st story, 1st apartment from west at north

    Nov 3, 2004 · Apt 2FL

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at east wall, baseboard at west wall, 1st door frame from west at north wall in the 3rd private hallway from north at east located at apt 2fl, 1st story, 1st apartment from west at north

    Nov 3, 2004 · Apt 2FL

    Closed — Violation closed

DOB building violations · 11

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 23, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 2, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 2, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 2, 2014

    Dob violation - dismissed
  • Plumbing none

    New gas piping and valve for 1st apt, gas range new hot and cold water lines and valves for sink and lavatory new traps for sink and lavatory and new shower body installed on 1st floor apt without a permit remedy: obtain a permit

    Apr 11, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 5, 2012

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 22, 2012

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 24, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 24, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 13, 2011

    Dob violation - dismissed
Show 1 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 2, 2010

    Dob violation - dismissed

ECB violations · 29

  • Class - 1

    Gas being supplied to bldg w/o inspection/certification by dob.note:obs one range in use @ the 1st fl apt kitchen w/o gas authorization.inspections must be done to get gas authorization.rem:file for req permits

    Apr 11, 2014 · Penalty $5,000

    Resolve
  • Class - 1

    Fail to have new or altered plumbing system tested.note:obs one gas range & related piping in use w/o gas test performed. gas test must be done on all new & altered gas lines.rem:perform test.

    Apr 11, 2014 · Penalty $5,000

    Resolve
  • Class - 2

    Work without a permit observed at 3:15pm new branch ccircuit wiring installed for outlets switches fixtures panel 6/3 feeder in 1st floor apt na to rent of apts.rem:obtain permit.

    Apr 11, 2014 · Penalty $4,000

    Resolve
  • Class - 1

    Failure to ground electrical systems service switch not provided with ground conductor to water pipe in basement.rem:provide grounding.

    Apr 11, 2014 · Penalty $24,000

    Resolve
  • Class - 1

    Work w/o permit.note:obs new gas piping & valve installed behind gas range on 1st fl w/o permit.also note new hot/cold lines & valves under kitchen sink & lavatory,new fixture ( )&new shower body also w/o permi

    Apr 11, 2014 · Penalty $8,000

    Resolve
  • Class - 2

    Work w/o permit.work noted:@ exposure existing masonry stairs from theground fl to 1st fl was removed.1st fl door was converte to a metal frame balcony w/new door opening.new door opening created @ bsmt lvl to

    Apr 11, 2014 · Penalty $4,000

    Resolve
  • Class - 2

    Failure to file a c of c w/ dob pursuant to 28-204.2 for violation 34933810h for fixed welder bars on bsmnt window.rem:file c of c.

    Jul 12, 2012

    Resolve
  • Class - 1

    Filed a cert of correction or other related materials containing material false statement(s) respondent file a cert of correction on 3/12/12for nov 34933810h upon inspection observed conditions respondent descr

    Jun 15, 2012

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway. noted:at ground flr level basement installed fixed welder street bars over window etc. rem:remove bars.

    May 25, 2012

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order contained in notice ofviolation #34914419l issued on 5/25/11 respondent failed to correct the condition cited in the prior nov. rem:comply with the commissioner's

    May 25, 2012 · Penalty $6,000

    Resolve
Show 19 more ↓
  • Class - 2

    Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34929949k issued on 12/1/11 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.

    Feb 15, 2012 · Penalty $8,000

    Resolve
  • Class - 1

    Failure to provide unobstracted exit passageway. noted: at ground floor level (basement) - fixed welder steel bars over window etc. remedy: remove bars.

    Jan 5, 2012

    Resolve
  • Class - 2

    Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34914419l issued on 5/25/11 pursuant to 28-204.4 & 1rcny 102-01. failure to provide unobstructed

    Jan 5, 2012

    Resolve
  • Class - 2

    Work without a permit.work noted:at basement on grade:created full height partitions subdividing apartment into (3) separate rooms. remedy: obtain permit or restore to prior legal condition.

    Dec 1, 2011 · Penalty $800

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by certificate of occupancy or dob records. fept of buildings hpd records, mdr#324601 indicates premises to be legally approved for (3)families, 1 apt per floor.now at basemen

    Dec 1, 2011 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order to file a certificate ofcorrection w/ the dept. of bldg for notice of violation # 34914420z issued on 05/25/11 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a

    Nov 23, 2011 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order to file a certificate ofcorrection w/ the dept. of bldg for notice of violation # 34914419l issued on 05/25/11 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a

    Nov 23, 2011 · Penalty $800

    Resolve
  • Class - 2

    Failure to certify corrections for vios #34854273x 34914419l 34914420z3485472y rem: file cert of correction

    Jul 6, 2011 · Penalty $800

    Resolve
  • Class - 1

    Failure to comply w/comm's order to correct vio #3485472y for work w/o permit no record of correction. remedy: comply w/comm's order & obtain permit.

    May 25, 2011

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway. note: basement apt, 2nd egress is totally obstructed by 1 fixed welded steel bars across windows, 2 partitions & keyed locked doors prevent egress as well.

    May 25, 2011 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to maintain bldg in code-compliant, use of prohibited hardware. note: welded permanent fixed bars all on windows, & keyed locked interior doors - illegal hardware now obstructing egress. (at basement).

    May 25, 2011 · Penalty $5,000

    Resolve
  • Class - 1

    Unlawful acts.failure to comply w/an order of the comm's.respondent failed to correct the conditions cited in nov#3485472y for illegal work in cellar.rem:comply w/comm's order

    Mar 11, 2011

    Resolve
  • Class - 1

    Failure to comply w/ comms order to correct vio#3485472y for work w/o permit @ cellar no record of correction rem: comply w/ comms & obtain permit

    Jan 31, 2011

    Resolve
  • Class - 1

    Failure to comply w/comm's order to correct vio #34854272y for work w/o permit @ cellar installed partitions for 4 rooms & 1 3pc bathroom no record of correction. remedy: comply w/comm's order & obtain permit.

    Oct 6, 2010 · Penalty $2,400

    Resolve
  • Class - 1

    Work w/o a permit work noted at cellar lvl erected full height partitions creating 4rms installed water & waste lines for a 3pc bath sink toilet shower rem: obtain plans & permits

    Aug 17, 2010 · Penalty $1,600

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by the c of o or dob records indicates premises to be a 3 family cellar storage boiler room now @ cellar level converted into 4 sros all w/ key lock devices bed tv microwave

    Aug 17, 2010 · Penalty $2,400

    Resolve
  • Hazardous

    Failure to maintain bldg-hazardous. defect noted: front entry metal door, at ground level is loose,chipping,pulling away and in danger of falling down, with sections of door rusted. noted location: front yard o

    Sep 6, 2005 · Penalty $800

    Resolve
  • Hazardous

    Work wihtout a permit hazardous work noted having erected full partitions walls in cellar creating one 3 pc bathroom and three (3) rooms remedy:obtain permit if feasible or obtain permit to restore premises to

    Aug 9, 2004

    Resolve
  • Non-hazardous

    Failure to maintain building defects are rotted and missing ceiling inthe hall and closet area at basement area remedy:make all necessary r epairs forthwith

    Aug 9, 2004

    Resolve

Complaints

  • Water leak

    Slow leak

    Apr 25, 2020 · Apt 1

    Close
  • Water leak

    Slow leak

    Mar 24, 2020 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Mar 24, 2020 · Apt 2

    Close
  • General

    Cooking gas

    Mar 24, 2020 · Apt 1

    Close
  • Appliance

    Electric/gas range

    Mar 24, 2020 · Apt 1

    Close
  • Water leak

    Slow leak

    Mar 24, 2020 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Feb 17, 2018 · Apt 2

    Close
  • General

    Cooking gas

    Feb 17, 2018 · Apt 2

    Close
  • Door/window

    Door

    Dec 8, 2017 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Mar 30, 2015 · Apt 1

    Close
Show 40 more ↓
  • Plumbing

    Water supply

    Mar 30, 2015 · Apt 1

    Close
  • General

    Locks

    Dec 1, 2011 · Apt NA

    Close
  • General

    Doors

    Dec 1, 2011 · Apt NA

    Close
  • Electric

    Bell-buzzer/intercom

    Dec 1, 2011 · Apt NA

    Close
  • Plumbing

    Basin/sink

    Dec 1, 2011 · Apt BSMT

    Close
  • Plumbing

    Bathtub/shower

    Dec 1, 2011 · Apt BSMT

    Close
  • Electric

    Electric-supply

    Mar 30, 2010 · Apt 1

    Close
  • General

    Ceramic-tile

    Sep 18, 2009 · Apt 1

    Close
  • Paint/plaster

    Wall

    Sep 18, 2009 · Apt 1

    Close
  • Nonconst

    Vermin

    Sep 18, 2009 · Apt 1

    Close
  • Nonconst

    Vermin

    Sep 18, 2009 · Apt 1

    Close
  • Nonconst

    Vermin

    Sep 18, 2009 · Apt 1

    Close
  • Nonconst

    Vermin

    May 1, 2009 · Apt 3FLR

    Close
  • Nonconst

    Vermin

    May 1, 2009 · Apt 3FLR

    Close
  • General

    Windows

    May 1, 2009 · Apt 3FLR

    Close
  • General

    Windows

    May 1, 2009 · Apt 3FLR

    Close
  • Electric

    Lighting

    May 1, 2009 · Apt 3FLR

    Close
  • Plumbing

    Basin/sink

    May 1, 2009 · Apt 3FLR

    Close
  • Plumbing

    Radiator

    Mar 25, 2009 · Apt 1

    Close
  • Nonconst

    Vermin

    Mar 25, 2009 · Apt 1

    Close
  • Paint/plaster

    Wall

    Mar 25, 2009 · Apt 1

    Close
  • Paint/plaster

    Wall

    Mar 25, 2009 · Apt 1

    Close
  • General

    Ceramic-tile

    Mar 25, 2009 · Apt 1

    Close
  • General

    Ceramic-tile

    Mar 25, 2009 · Apt 1

    Close
  • Heating

    Heat related

    Nov 22, 2008 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Apr 24, 2007 · Apt 3

    Close
  • Electric

    Electric-supply

    Jan 3, 2006 · Apt BSMT

    Close
  • Electric

    Electric-supply

    Jan 3, 2006 · Apt BSMT

    Close
  • Plumbing

    Water-leaks

    Dec 26, 2005 · Apt 1

    Close
  • Heating

    Heat related

    Dec 22, 2005 · Apt 1

    Close
  • Heating

    Heat related

    Dec 19, 2005 · Apt BSMT

    Close
  • Heating

    Heat related

    Dec 19, 2005 · Apt BSMT

    Close
  • Heating

    Heat related

    Dec 12, 2005 · Apt BSMT

    Close
  • Heating

    Heat related

    Dec 10, 2005 · Apt BSMT

    Close
  • Heating

    Heat related

    Dec 10, 2005 · Apt BSMT

    Close
  • Heating

    Heat related

    Dec 5, 2005 · Apt BSMT

    Close
  • Nonconst

    Rubbish

    Dec 5, 2005 · Apt 1

    Close
  • Heating

    Heat related

    Dec 3, 2005 · Apt BSMT

    Close
  • Heating

    Heat related

    Nov 25, 2005 · Apt 1

    Close
  • Heating

    Heat related

    Nov 19, 2005 · Apt BSMT

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1910
Floors
2
Residential units
3
Building area
2,736 ft²
Lot area
1,900 ft²
Zoning
R6
Community board
304
Council district
37
Block / lot
3424 / 68
Assessed value
$104,580
Landmark / historic district
No

HPD registration #324601, last renewed Oct 1, 2025.

Questions about 221 Schaefer Street

Who owns 221 Schaefer Street?

The owner of record in NYC Department of City Planning PLUTO data is 221 Schaefer Realty, LLC.

Does 221 Schaefer Street have violations?

Yes. NYC HPD has recorded 34 housing violations at this property.

Is 221 Schaefer Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 221 Schaefer Street built?

City records list 1910 as the year it was built.

How many apartments are in 221 Schaefer Street?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.