Violations at 287 Cornelia Street
Brooklyn, NY 11221 · BBL 3-03377-0042 · Back to the property
HPD housing violations
50 HPD violations, newest first.
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 3r, 3rd story, 2nd apartment from west at north
Apr 19, 2026 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 2nd apartment from west at north
Apr 19, 2026 · Apt 3R
Open — Notice of issuance sent to tenant - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 19, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Oct 17, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jul 24, 2024
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jul 24, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jul 24, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 24, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door in the bathroom located at apt 2r, 2nd story, 2nd apartment from south at west
Jul 24, 2024 · Apt 2R
Open — Nov sent out - BHazardous
Refit the door in the bathroom located at apt 2r, 2nd story, 2nd apartment from south at west
Jul 24, 2024 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 2r, 2nd story, 2nd apartment from south at west
Jul 24, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 2nd apartment from south at west
Jul 24, 2024 · Apt 2R
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2r, 2nd story, 2nd apartment from south at west
Jul 24, 2024 · Apt 2R
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2r, 2nd story, 2nd apartment from south at west
Jul 24, 2024 · Apt 2R
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .... in the kitchen located at apt 2r, 2nd story, 2nd apartment from south at west
Jul 24, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective frame and latch in the entrance located at apt 2r, 2nd story, 2nd apartment from south at west
Jul 24, 2024 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling in the 1st room from east located at apt 2r, 2nd story, 2nd apartment from south at west
Jul 24, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 2nd apartment from south at west
Jul 24, 2024 · Apt 2R
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Jan 19, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 19, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 19, 2024
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Jan 19, 2024
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the kitchen located at apt 2r, 2nd story, 2nd apartment from west at north
Jan 19, 2024 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective glass pane at lower sash window to fire escape in the kitchen located at apt 2r, 2nd story, 2nd apartment from west at north
Jan 19, 2024 · Apt 2R
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north
Jan 19, 2024 · Apt 2R
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north
Jan 19, 2024 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 2r, 2nd story, 2nd apartment from west at north
Jan 19, 2024 · Apt 2R
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of sliding bolt lock with hole for padlock installed on door in the entrance located at apt 2r, 2nd story, 2nd apartment from west at north
Jan 19, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Replace with new the missing mortise locking device and knob on door in the entrance located at apt 2r, 2nd story, 2nd apartment from west at north
Jan 19, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north
Jan 19, 2024 · Apt 2R
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north
Jan 19, 2024 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood base under washbasin in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north
Jan 19, 2024 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the steam riser in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north
Jan 19, 2024 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north
Jan 19, 2024 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north
Jan 19, 2024 · Apt 2R
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 22, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 10, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 23, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 23, 2022
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 8, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2021
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north, the bathroom , the 6th room from north located at apt 2l, 2nd story, 1st apartment from west at north
Oct 21, 2008 · Apt 2L
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling and all walls in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north
Oct 21, 2008 · Apt 2L
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the 4th room from north located at apt 2l, 2nd story, 1st apartment from west at north
Oct 21, 2008 · Apt 2L
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall, 1st door from west at north wall in the 4th room from north located at apt 2l, 2nd story, 1st apartment from west at north
Oct 21, 2008 · Apt 2L
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors entrance to 1 sty west apt 1l. located at apt 1l
Nov 19, 1987 · Apt 1L
Open — Not complied with
DOB building violations
1 DOB violations, newest first.
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed
ECB violations
1 ECB violations, newest first.
- Non-hazardous
Residence altered for occupancy is a dwelling for more than the legally approved number of families.building dept.records which indicate residence legally approved for six(6) families; residence now altered for
Feb 23, 2000 · Penalty $3,050
Resolve