roofy

Violations at 427 Central Avenue

Brooklyn, NY 11221 · BBL 3-03369-0010 · Back to the property

HPD housing violations

47 HPD violations, newest first.

  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color north wall at public hall, 1st story

    Oct 18, 2024

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color south wall at public hall, 2nd story

    Oct 18, 2024

    Open — Nov sent out
  • CImmediately hazardous

    Provide an adequate supply of gas to the fixtures at stove in the kitchen located at apt 2, 2nd story, 1st apartment from west at north

    Oct 18, 2024 · Apt 2

    Closed — Violation closed
  • CImmediately hazardous

    Provide adequate supply of hot water for the fixtures cause unknown in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Oct 18, 2024 · Apt 2

    Open — Nov sent out
  • CImmediately hazardous

    Provide adequate supply of cold water for the fixtures . in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Oct 18, 2024 · Apt 2

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3, 3rd story, 1st apartment from west at north

    Oct 18, 2024 · Apt 3

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 2nd room from north located at apt 3, 3rd story, 1st apartment from west at north

    Oct 18, 2024 · Apt 3

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 3, 3rd story, 1st apartment from west at north

    Oct 18, 2024 · Apt 3

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 3rd room from north located at apt 3, 3rd story, 1st apartment from west at north

    Oct 18, 2024 · Apt 3

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 3, 3rd story, 1st apartment from west at north

    Oct 18, 2024 · Apt 3

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north located at apt 3, 3rd story, 1st apartment from west at north

    Oct 18, 2024 · Apt 3

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and north wall in the 1st room from north at east located at apt 3, 3rd story, 1st apartment from west at north

    Oct 18, 2024 · Apt 3

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the north and south wall in the kitchen located at apt 3, 3rd story, 1st apartment from west at north

    Oct 18, 2024 · Apt 3

    Open — Nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Oct 18, 2024 · Apt 3

    Open — Nov sent out
  • CImmediately hazardous

    Provide adequate supply of cold water for the fixtures (cause unknown) in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Oct 18, 2024 · Apt 3

    Open — Nov sent out
  • CImmediately hazardous

    Provide adequate supply of hot water for the fixtures (cause unknown) in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Oct 18, 2024 · Apt 3

    Open — Nov sent out
  • CImmediately hazardous

    Provide an adequate supply of gas to the fixtures at stove in the kitchen located at apt 3, 3rd story, 1st apartment from west at north

    Oct 18, 2024 · Apt 3

    Open — Nov sent out
  • CImmediately hazardous

    Provide a safe and adequate supply of electric service to the fixtures at ceiling and all walls in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Oct 18, 2024 · Apt 3

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 15, 2024

    Open — Info nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the west wall at public hall, 1st story

    Oct 14, 2024

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the north and the west walls in the kitchen located at apt 3, 3rd story, 1st apartment from west at north

    Oct 14, 2024 · Apt 3

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the celling in the 3rd room from east located at apt 3, 3rd story, 1st apartment from west at north

    Oct 14, 2024 · Apt 3

    Open — Nov sent out
  • BHazardous

    Repair the roof so that it will not leak over ceiling in the 3rd room from east located at apt 3, 3rd story, 1st apartment from west at north

    Oct 14, 2024 · Apt 3

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 3, 3rd story, 1st apartment from west at north

    Oct 14, 2024 · Apt 3

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the celling in the 1st room from east at south located at apt 3, 3rd story, 1st apartment from west at north

    Oct 14, 2024 · Apt 3

    Open — Nov sent out
  • BHazardous

    Repair the roof so that it will not leak over ceiling in the 1st room from east at south located at apt 3, 3rd story, 1st apartment from west at north

    Oct 14, 2024 · Apt 3

    Open — Nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Oct 14, 2024 · Apt 3

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and celling in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Oct 14, 2024 · Apt 3

    Open — Nov sent out
  • CImmediately hazardous

    Provide adequate supply of hot water for the fixtures . in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Oct 14, 2024 · Apt 3

    Closed — Violation closed
  • CImmediately hazardous

    Provide adequate supply of cold water for the fixtures . in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Oct 14, 2024 · Apt 3

    Closed — Violation closed
  • BHazardous

    Provide a safe and adequate supply of electric service to the fixtures at all walls and celling in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Oct 14, 2024 · Apt 3

    Open — Nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Oct 14, 2024 · Apt 2

    Open — Nov sent out
  • CImmediately hazardous

    Provide adequate supply of hot water for the fixtures . in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Oct 14, 2024 · Apt 2

    Open — Nov sent out
  • CImmediately hazardous

    Provide adequate supply of cold water for the fixtures . in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Oct 14, 2024 · Apt 2

    Open — Nov sent out
  • CImmediately hazardous

    Provide a safe and adequate supply of electric service to the fixtures ... in the entire apartment located at apt 3, 3rd story

    Oct 10, 2024 · Apt 3

    Closed — Violation closed
  • CImmediately hazardous

    Provide adequate supply of cold water for the fixtures ... in the entire apartment located at apt 3, 3rd story

    Oct 10, 2024 · Apt 3

    Closed — Violation closed
  • CImmediately hazardous

    Provide adequate supply of hot water for the fixtures ... in the entire apartment located at apt 3, 3rd story

    Oct 10, 2024 · Apt 3

    Closed — Violation closed
  • CImmediately hazardous

    Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 3, 3rd story

    Oct 10, 2024 · Apt 3

    Closed — Violation closed
  • BHazardous

    Remove all encumbrances consisting of household items at public hall, 2nd story

    Oct 10, 2024

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 02, 2nd story

    Oct 10, 2024 · Apt 02

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling and north wall in the 2nd room from north located at apt 02, 2nd story

    Oct 10, 2024 · Apt 02

    Open — Nov sent out
  • CImmediately hazardous

    Remove the illegal fastening hasp and eye capable of being padlocked at building front entrance door at public hall, 1st story

    Oct 10, 2024

    Open — Nov sent out
  • CImmediately hazardous

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Oct 10, 2024 · Apt 2

    Open — Nov sent out
  • CImmediately hazardous

    Provide adequate supply of hot water for the fixtures , in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Oct 10, 2024 · Apt 2

    Open — Nov sent out
  • CImmediately hazardous

    Provide adequate supply of cold water for the fixtures , in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Oct 10, 2024 · Apt 2

    Closed — Violation closed
  • BHazardous

    And department rules and regulations: remove the encumbrance obstructing egress from fire escapes air conditiiioner at 2nd story balcony, east stack

    Jan 20, 2020

    Open — Nov sent out
  • CImmediately hazardous

    Remove the illegal fastening double cylinder lock key operated installed, entrance door street to vestibule.

    Jul 16, 2005

    Open — Nov sent out

DOB building violations

14 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations

9 ECB violations, newest first.

  • Class - 2

    Failure to file certificate of correction with the dept. of buildings for vio# 39187514n, file a certificate of correction

    Aug 3, 2026 · Penalty $1,280

    Active
  • Class - 1

    Unlawful acts. failure to comply with the commissioners orders to obtain a permit for vio# 39187516r. no permits on file for removal of 3 piece bathroom in cellar., comply with commissioner's order

    Aug 3, 2026 · Penalty $2,530

    Active
  • Class - 1

    Unlawful acts. failure to comply with the commissioners orders to obtain a permit for vio# 39187491j as per violation #39127298n issued 10/11/24 for not having permits to install full height partitions to creat

    Aug 3, 2026 · Penalty $6,280

    Active
  • Class - 1

    Work w/o permit. noted: plumbing in 3 pcs bathroom in cellar has been removed. application #b01257997-s1 in in approved status, but the work was already performed., obtain permit

    May 6, 2026 · Penalty $2,500

    Active
  • Class - 2

    Work without a permit. noted: in cellar walls removed. application #b01257997-i11-gc is in objections status and work was performed already., obtain all permits

    May 6, 2026 · Penalty $1,250

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code.) noted: cellar level ceiling aprox 500 sq feet of fire stopping was removed, a st

    May 6, 2026 · Penalty $2,500

    Active
  • Class - 1

    Unlawful acts. failure to comply with commissioner's order to obtain permits for summons #39127298n issued 10/11/24., comply with commissioner's order

    May 6, 2026 · Penalty $2,500

    Active
  • Class - 1

    In cellar erected full height partitions for 3 rooms, installed water and waste lines for 3 pc bath(bowl,sink,shower) kitchen sink. installed electric lines for switches,plugs and fixtures. at 1st floor erected

    Oct 11, 2024 · Penalty $12,500

    Active
  • Class - 2

    B2541516363450a50b50c50d. 50a ara expired boiler running. 50b no inspection done after installation 50c remove louver on door. 50d must install check valve b/w backflow and pressure reducing valve.

    Sep 2, 2009 · Penalty $250

    Resolve