  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations

44 ECB violations, newest first.

  • Class - 2

    Reissue:35717411k-failure to maintain building in code-compliant manner.exit#6 in room#123 auditorium entrance off stage.rem:comply with code.

    May 4, 2026 · Penalty $3,125

    Active
  • Class - 2

    Reissue #35677554y: failure to maintain building in code-compliant manner: observation @ exit 6 inside room 123 auditorium entrance to left and right stages doors not close property when tested. at exit 10, sel

    May 5, 2025 · Penalty $3,125

    Active
  • Class - 2

    Reissue#35672885x failure to maintain building in code-compliant manner.at time of my inspection i observed the smoke doors by exit 6 insideroom 123 auditorium entrance at the stage left and right side smoke do

    May 7, 2024 · Penalty $1,562

    Active
  • Class - 2

    Failure to maintain building in code compliant manner.noted the smoke doors by exit 6 inside room 123,auditorum entrance stage left and right and smoke room by b27 all are not working properly.remedy:repair and

    Mar 15, 2023 · Penalty $625

    Active
  • Class - 3

    Violation of parking regulations in a residential district; noted: observed 4 vehicles illegally parked at empty school lot (p.s. 299) with no curb cut, vehicles jumping curb to access lot., conform to parking

    Oct 6, 2021 · Penalty $500

    Active
  • Class - 2

    Failure to maintain building in code compliant manner at 1st floor exit 4 doors c, d defective not closing properly closers broken stuck. remedy: replace

    Apr 1, 2019

    Resolve
  • Class - 2

    Reissue 35093659x. exit doors not self-closing. the following doors are racked and/or do not open/close properly. doors at 3rd flr, stair k & l, 4th flr stair c, exit 9 at 1st fl auditorium and gynasium singl

    May 20, 2015

    Resolve
  • Class - 2

    27-371(b) reissue 35094660n vision panels. use of prohibited plexiglass/thermoplastic in the following doors: 431,426,312,320,321,323,324,325,212,221,223,224,227,228, 229,230,231,102,105,106,114,110,121,128 and

    May 20, 2015

    Resolve
  • Class - 2

    Combustible materials in corridors. excessive combustibles in corridors on 2nd,3rd & 4th floor. remedy: remove from corridors.

    May 13, 2014

    Resolve
  • Class - 2

    Plaster spalling due to water penetration outside rm 421 & inside rm 202 & 106. remedy: repair water damage.

    May 13, 2014

    Resolve
  • Class - 2

    Failure to maintain required corridor width. egress from room 121 to exterior of building is blocked with a locker,refrigerator & microwave & toy desk with chair. remedy: provide proper corridor width to egres

    May 13, 2014

    Resolve
  • Class - 2

    Use of prohibited door &/or hardware per bc 1008.1.8; 27-371(j). use of door stops on the following doors: auditorium, rm 226,324,326,430 & 427. remedy: remove prohibited door hardware.

    May 13, 2014

    Resolve
  • Class - 2

    Re-issue # 35016926h. 27-371(b). plexiglass vision panels in the following doors: 102,105,106,110,114,127,128,132,122,123,121,231,124,230,229,228,227,224,223,221,212,312,321,320,323,324,325,329,330,331,431,429,

    May 13, 2014

    Resolve
  • Class - 2

    Re-issue # 35016927j. exit door not self closing. the following doors are racked at 3rd fl stair k & l; smoke corridor doors between room 426 & 428; 4th fl stair c & d & stair k & l at 4th fl; exit door #9 at

    May 13, 2014

    Resolve
  • Class - 2

    Doors at stair l&g at 2,3,4 flrs are recked. exit door, right of stagesticks requiring excessive force to open. rmdy: repair or replace doors.

    Apr 22, 2013

    Resolve
  • Class - 2

    27-371(b) plexi vision panels installed on doors to room 106,105,229228,227,223,328,321,323,325,331,431,426,424,423,416 and various other locations. rmdy: provide required glass panels.

    Apr 22, 2013

    Resolve
  • Class - 2

    The plastic on the ceiling is psalling located at exit j (auditorium front exit) on the 1st fl level. remedy: repair &/or replace plaster.

    Mar 28, 2012

    Resolve
  • Class - 2

    Exterior facade has become porous & allowing rain water into the building causing interior damages in the auditorium on the 1st fl level. remedy: water proof exterior brick facade.

    Mar 28, 2012

    Resolve
  • Class - 2

    Water penetrations into 2 flr boys bathroom & staircase i on 1st flr. remedy seal penetration.

    Mar 30, 2010

    Resolve
  • Class - 2

    Plaster damage 4 flr corridor & 1st flr stairs k,j. remedy: repair area.

    Mar 30, 2010

    Resolve
  • Class - 3

    Defective toilets on 4th flr, 1 inside female bathroom and 1 inside boys bathroom remedy: repair toilets.

    Mar 30, 2010

    Resolve
  • Hazardous

    Reissue: 34510291k window has become porous & allowing rain water to enter the bldg located in the auditorium (1st fl) above window on woodbine st side causing interior damage. remedy: waterproof windows.

    Apr 13, 2007

    Resolve
  • Hazardous

    Reissue: 34510290z exit doors are defective located at exit 1,2 on 1stfl & stairway 5 & 6 on 2nd fl. remedy: repair/ replace doors.

    Apr 13, 2007

    Resolve
  • Hazardous

    Reissue: 34510289l ceiling & wall is cracked at the roof bulkhead at stairway 1,2,5 & 6 on roof level. remedy: repair wall & ceiling.

    Apr 13, 2007

    Resolve
  • Non-hazardous

    Concrete pavement near exit 1 and 2 to rear play area is sinking, cracked and bulging one to two inches with curb below fence at sidewalk spalling with exposed rebar throughout. remedy: replace pavement/curb.

    Feb 7, 2006

    Resolve
  • Non-hazardous

    First floor auditorium, front right side windows have water penetration above windows. (woodbine street side). remedy: repair/patch open mortar joints above windows below roof copings.

    Feb 7, 2006

    Resolve
  • Non-hazardous

    Reissue: #34466575r defective door/frames at: first floor, exit 1 and 2 vestibule door, second floor at stairwell 5 and 6; first floor kitchen door near windows to cafeteria. also noted: cellar exit door at

    Feb 7, 2006

    Resolve
  • Non-hazardous

    Reissue: #34281391l masonry cracked walls/ceiling at: roof bulkhead atstairwell #1 and 2 and 5 and 6; classroom 114. also noted: cellar roomb4 gas meter room has a hole in block wall near ceiling.remedy: repair

    Feb 7, 2006

    Resolve
  • Non-hazardous

    Metal doors/frames in disrepair,rusted and jamming.locations:exit,112 exit to street exit 5 5/6 @2nd fl.and door to kitchen remedy:replace defective doors/frames

    Mar 24, 2005

    Resolve
  • Non-hazardous

    Panic hardware inoperative.note auditorium main entrance panic hardware is broken and unable to open.remedy:repair and/or replace panic hardware.

    Jun 11, 2004

    Resolve
  • Non-hazardous

    Failure to maintain.defect is main office metal partition is loose andsagging.remedy:repair and/or replace partition

    Jun 11, 2004

    Resolve
  • Non-hazardous

    Failure to maintain.defect is gym wood floor is rotten and loose at various location."reissue" (34387045y) remedy:repair floor

    Jun 11, 2004

    Resolve
  • Hazardous

    Failure to maintain.adequate housekeeping.defects are;numerous amount of construction debris such as metal sheeting,tracks & studs wood with protruding nails,chairs & black garbage bags with other debris being

    Mar 26, 2003

    Resolve
  • Hazardous

    Failure to maintain.defects are;auditorium east side exit door stuck ina closed position

    Mar 26, 2003

    Resolve
  • Non-hazardous

    Failure to maintain.defects are;gym wood floor rotten,loose & bulging with a large hole at east side.

    Mar 26, 2003

    Resolve
  • Hazardous

    Failure to maintain. defects: loose, shifting brick facade. location: woodbine st on exterior wall facing evergreen ave. remedy: repair masonry maintain bldg.

    Apr 16, 2002

    Resolve
  • Hazardous

    Failure to maintain. defects: cracked, loose, detached cement cinder blocks and walls. locations: gym all walls, stair 1/2 & 5/6 at roof. remedy: make safe do repairs.

    Apr 16, 2002

    Resolve
  • Hazardous

    Failure to maintain defects cracked detached broken ceramic flooring allowing waste water onto and thru lower glassroom location boys bathroom in toilet stall rm#202 remedy make safe repair flooring maintain

    Apr 16, 2002

    Resolve
  • Non-hazardous

    Failure to provide emergency light fixture within corridor and stairs#1,2,#5-6 on floor 2 to 4.failure to provide emergency power to light fixture within corridor and stairs #1,2,#5-6 on floor 2 to 4.remedy:pro

    Apr 9, 2001

    Resolve
  • Non-hazardous

    Failure to maintain building defects are cracked ceiling in room 312,108,and ceiling in basement hallway bet boiler room and fan room.remedy:do repairs immediately.

    Feb 21, 2001

    Resolve
  • Hazardous

    Failure to maintain building defects is long and wide vertical cracks in gym.remedy:repair immediately.

    Feb 21, 2001

    Resolve
  • Non-hazardous

    Failure to maintain building defects are crack walls in stairwell 1/2 and 5/6 @ roof landing room 114 and auditorium on wall perpendicular to stage near cafe.remedy:do all repairs immediately.

    Feb 21, 2001

    Resolve
  • Non-hazardous

    Failure to maintain, defect is: (1) gymnasium, block walls have long-open cracks-structural defect noted (2) no panic bars at (p.a) exit door, as per code. remedy:maintain building, make all repairs forthwith

    May 5, 2000

    Resolve
  • Hazardous

    Failure to maintain building exterior and exterior noted playfield hastripping hazardous on surface unlevel, wrought iron fence and cyclone fence need full repair. clogged drains cause water back-up into classr

    Apr 15, 1999