274 Wyckoff Avenue
Brooklyn, NY 11237BBL 3-03337-0027Map
Owner of record: 247 Starr Street, INC.
274 Wyckoff Avenue is a mixed residential and retail building built in 1931 in Brooklyn, 11237. It has 4 residential units across 3 floors. The owner of record is 247 Starr Street, INC.. HPD has recorded 58 housing violations here, most recently on October 25, 2024. 49 of the 50 most recent violations are still open.
- HPD violations
- 58
- DOB violations
- 12
- ECB violations
- 5
- HPD complaints
- 64
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 58
- BHazardous
Remove all encumbrances consisting of house hold items,garbages cans, door and baby stroller at public hall, 1st story
Oct 25, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at south wall at public hall, 1st story
Oct 25, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 25, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 25, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Oct 25, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 25, 2024
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Oct 25, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 25, 2024
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Oct 25, 2024
Open — Nov sent out - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. (light fixture present)
Dec 12, 2015
Open — Invalid certification
Show 40 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 25, 2015
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following ***minimum of 100 watts of incandescent light required***
Dec 13, 2010
Open — Nov sent out - ANon-hazardous
Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor , missing. at public hall, 1st story
May 12, 2010
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
May 12, 2010
Open — Nov sent out - ANon-hazardous
Paint or post a sign indicating floors all sty's public halls
May 12, 2010
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
May 12, 2010
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules., 1st story
May 12, 2010
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard
May 12, 2010
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2l, 2nd story, 1st apartment from north at east
May 12, 2010 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective sagging wood floor in the kitchen located at apt 2l, 2nd story, 1st apartment from north at east
May 12, 2010 · Apt 2L
Open — Nov sent out - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration ;sealed window at air saft. located at apt 2l, 2nd story, 1st apartment from north at east
May 12, 2010 · Apt 2L
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 2l, 2nd story, 1st apartment from north at east
May 12, 2010 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Replace with new the missing saddle in the entrance located at apt 2l, 2nd story, 1st apartment from north at east
May 12, 2010 · Apt 2L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the walls and ceilings in the entire apartment located at apt 2l, 2nd story, apartment at east
May 12, 2010 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Replace with new the missing locking device at the front entrance door to building , 1st story
Sep 30, 2009
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall, 1st door from east at south wall in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Jul 10, 2008 · Apt 3R
Open — Nov sent out - BHazardous
Replace with new the missing two balusters at public hall stairs, 1st story
Jul 10, 2008
Open — Nov sent out - BHazardous
Replace with new the missing two guard rail's balusters at public hall, 2nd story
Jul 10, 2008
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 3rd story balcony
Jul 10, 2008
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 4th room from east located at apt 3r, 3rd story, 1st apartment from west at north
Jul 10, 2008 · Apt 3R
Open — Nov sent out - BHazardous
Properly repair the broken or defective spring balance at lower window sash at west one window in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Jul 10, 2008 · Apt 3R
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate at west one window in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Jul 10, 2008 · Apt 3R
Open — Nov sent out - BHazardous
Properly repair the broken or defective spring balance at lower window sashes at east one & east two windows in the 1st room from east located at apt 3r, 3rd story, 1st apartment from west at north
Jul 10, 2008 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Jul 10, 2008 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) ceiling, 1st door frame from south at west wall, 1st wall cabinet from east at south wall in the 4th room from east located at apt 3r, 3rd story, 1st apartment from west at north
Jul 10, 2008 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall, south wall, 1st wall cabinet from west at north wall in the private hallway located at apt 3r, 3rd story, 1st apartment from west at north
Jul 10, 2008 · Apt 3R
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Jun 29, 2008 · Apt 3R
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes at rear , 3rd story
Jun 29, 2008
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Jun 29, 2008 · Apt 3R
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Jun 29, 2008 · Apt 3R
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing. in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Aug 17, 2007 · Apt 3R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department .. 1st door frame from south at west wall, south wall in the 1st room from east located at apt 3r, 1st apartment from west at north
May 9, 2006 · Apt 3R
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation .. 1st riser from south at west wall in the bathroom located at apt 3r, 1st apartment from west at north
May 9, 2006 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) north wall, south wall in the private hallway located at apt 3r, 1st apartment from west at north
May 9, 2006 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) 1st closet from east at south wall door in the 3rd room from east located at apt 3r, 1st apartment from west at north
May 9, 2006 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) south wall, 2nd window frame from west at north wall in the kitchen located at apt 3r, 1st apartment from west at north
May 9, 2006 · Apt 3R
Open — Nov sent out - ANon-hazardous
Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ,1st story
May 9, 2006
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
May 9, 2006
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system , 1st story
May 9, 2006
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 9, 2006
Open — Nov sent out
DOB building violations · 12
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed
Show 2 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active
ECB violations · 5
- Class - 2
B265 as per class 2 (b265) 28-303.7 failure to file a complete boilerinspection report as per dob record.submit a current b09 report.correct all violating condition and submit the certificate of correction.
Aug 16, 2016 · Penalty $2,500
Active - Class - 1
Failure to comply w/comm's order to correct vio #34811343m for work w/o permit installed antenna tower approx 80' on roof. no record of correction. (recurring condition). remedy: comply w/comm's order & obtain
Oct 6, 2010 · Penalty $24,000
Resolve - Class - 1
Failure to comply w/ comm's order to correct vio#34811343m for work w/o permit installed approx 80"antenna tower on roof.no record of correction.remedy:comply w/ comm's order & obtain permit.
Aug 12, 2010 · Penalty $24,000
Resolve - Class - 1
Work w/o a permit: work noted at roof level erected 80' steel radio tower (1) secured w/cables attached to roof. remedy: obtain permit or restore to prior legal condition.
Oct 9, 2009 · Penalty $8,000
Resolve - Non-hazardous
10a/50a/50b/50c/50d/(50a)no emergence switch outside of boiler rm firedoor.(50b)flue pipe not properly sealed to chimney(50c)holes in boiler rm ceiling & walls(50d)union leaking on return line b4a
Dec 23, 2005
Resolve
Complaints
- Door/window
Door
Oct 17, 2024 · Apt 3L
Close - Safety
Window guard broken/missing
May 14, 2024 · Apt 2
Close - Door/window
Door
Oct 16, 2023 · Apt 3L
Close - Electric
No lighting
Oct 16, 2023 · Apt 3L
Close - Heating
Heat related
Oct 29, 2013 · Apt BLDG
Close - Electric
Electric-supply
Feb 8, 2011 · Apt 3L
Close - Heating
Heat related
Feb 8, 2011 · Apt 3L
Close - General
Locks
Feb 8, 2011 · Apt 3L
Close - General
Doors
Feb 8, 2011 · Apt 3L
Close - Nonconst
Smoke detector
Feb 8, 2011 · Apt 3L
Close
Show 40 more ↓
- Nonconst
Carbon monoxide
Feb 8, 2011 · Apt 3L
Close - Electric
Electric-supply
Feb 8, 2011 · Apt 3L
Close - Heating
Heat related
Feb 8, 2011 · Apt 3L
Close - Electric
Electric-supply
Feb 8, 2011 · Apt 3L
Close - Heating
Heat related
Feb 8, 2011 · Apt 3L
Close - General
Locks
Feb 8, 2011 · Apt 3L
Close - Nonconst
Smoke detector
Feb 5, 2011 · Apt 3L
Close - General
Locks
Feb 5, 2011 · Apt 3L
Close - General
Doors
Feb 5, 2011 · Apt 3L
Close - General
Locks
Feb 5, 2011 · Apt 3L
Close - General
Floor
May 10, 2010 · Apt 2L
Close - Paint/plaster
Ceiling
May 10, 2010 · Apt 2L
Close - Paint/plaster
Wall
May 10, 2010 · Apt 2L
Close - Nonconst
Vermin
May 10, 2010 · Apt 2L
Close - General
Windows
May 10, 2010 · Apt 2L
Close - General
Floor
May 10, 2010 · Apt 2L
Close - Nonconst
Vermin
May 10, 2010 · Apt 2L
Close - Plumbing
Bathtub/shower
Oct 19, 2009 · Apt 2L
Close - General
Doors
Oct 19, 2009 · Apt 2L
Close - Heating
Heat-plant
Oct 19, 2009 · Apt 2L
Close - Heating
Heat related
Sep 28, 2009 · Apt 2L
Close - General
Locks
Sep 28, 2009 · Apt 2L
Close - Plumbing
Water-leaks
Sep 28, 2009 · Apt 2L
Close - Construction
Roof
Jan 30, 2009 · Apt BLDG
Close - Heating
Heat related
Oct 28, 2008 · Apt 3R
Close - General
Floor
Jun 26, 2008 · Apt 3R
Close - Nonconst
Vermin
Jun 26, 2008 · Apt 3R
Close - Plumbing
Toilet
Jun 26, 2008 · Apt 3R
Close - Appliance
Refrigerator
Jun 26, 2008 · Apt 3R
Close - Plumbing
Toilet
Sep 17, 2007 · Apt 3R
Close - Plumbing
Basin/sink
Sep 17, 2007 · Apt 3R
Close - General
Floor
Sep 17, 2007 · Apt 3R
Close - Plumbing
Toilet
Aug 13, 2007 · Apt 3R
Close - Plumbing
Basin/sink
Aug 13, 2007 · Apt 3R
Close - General
Floor
Aug 13, 2007 · Apt 3R
Close - Plumbing
Bathtub/shower
Apr 4, 2006 · Apt 3R
Close - General
Floor
Apr 4, 2006 · Apt 3R
Close - Heating
Heat related
Nov 21, 2005 · Apt 3R
Close - Heating
Heat related
Nov 17, 2005 · Apt BLDG
Close - Heating
Heat related
Nov 11, 2005 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1931
- Floors
- 3
- Residential units
- 4
- Building area
- 4,500 ft²
- Lot area
- 2,000 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3337 / 27
- Assessed value
- $512,100
- Landmark / historic district
- No
HPD registration #335204, last renewed Aug 12, 2025.
Questions about 274 Wyckoff Avenue
Who owns 274 Wyckoff Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 247 Starr Street, INC..
Does 274 Wyckoff Avenue have violations?
Yes. NYC HPD has recorded 58 housing violations at this property.
Is 274 Wyckoff Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 274 Wyckoff Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 274 Wyckoff Avenue?
It has 4 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.