Violations at 223 Linden Street
Brooklyn, NY 11221 · BBL 3-03325-0060 · Back to the property
HPD housing violations
4 HPD violations, newest first.
- CImmediately hazardous
Provide ready access to buildings heating system door locked to basement at public hall 1st story at boiler room, 1st story
Aug 1, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures
Aug 1, 2026
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 9th story
Mar 15, 2026
Closed — Violation closed
DOB building violations
1 DOB violations, newest first.
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed
ECB violations
12 ECB violations, newest first.
- Class - 2
At the time of inspection, observed yodoks at street level operations not maintained in compliance with manufacturer specifications. they were not filled with water or sand and were not completely connected and
Jun 8, 2024 · Penalty $1,250
Resolve - Class - 2
At the time of inspection, observed inadequate housekeeping on scaffold at exp 2 & 3 on multiple platform levels. housekeeping must be maintained as per bc3303.4 and 27-1018 requirements to ensure safety and co
Jun 8, 2024
Resolve - Class - 2
At the time of inspection, observed inadequate storage zone as per bc3307.4.7. missing netting and fencing under the sidewalk shed, along with missing barricades at other locations, creates an immediate danger
Jun 8, 2024 · Penalty $2,500
Resolve - Class - 1
@12 story nb job# b00685211-i1-gc where worker got hit for fallen material on 04/25/24 per department records site failed to notify dob within 3 business days+to date of 16 items expressly listened in 28-103.21
May 23, 2024 · Penalty $2,500
Resolve - Class - 2
3303.12 elevators and hoists during construction or demolition. responding incident observed: elevator not in state of readiness, stocked at 13 floor, creating a potential safety conditions for all activities a
May 14, 2024 · Penalty $2,500
Resolve - Class - 1
Bc 3303.4.5.1 open and exposed areas.responding an incident where electrician dario temperino, got hit his back from falling plywood inspection revealed: gc failure to institute safety measures for construction
Apr 25, 2024 · Penalty $5,000
Resolve - Class - 2
Bc 3301.1.2- fire code. observed a sunbelt generator located at ground floor exp#3, in active use. upon review of the fdny permit for the portable generator, i found that it had expired as of 02/16/2024.. compl
Mar 4, 2024 · Penalty $625
Resolve - Class - 2
New 13 story building: work contrary to code section . observed at time of inspection active site ,ssc present also noted: pipe scaffold erected on all 4 exposures with mising toe boards in diferents level a
Feb 2, 2024 · Penalty $2,500
Resolve - Class - 2
Responding a complaint on a proposed 13 stories new building, top off, when riding hoist to roof main; roof with construction activities in progress (torch use), suddenly stops due to electrical issues at 5th f
Jan 29, 2024
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments.at time of inspection of 13 story building at grade level with work in progress as per inspector kester gibbs he observed cais
Jan 3, 2023 · Penalty $625
Resolve - Class - 1
Inspection of an 13 story building with active work in progress at foundation level, i observed at exposure one yodock in place. upon my request for d.o.t permit none was provide and expire. failure to have val
Oct 6, 2022 · Penalty $625
Resolve - Class - 1
Inspection of an 13 story building at foundation level with work in progress, i observed caisson piling at exposure 3 upon review plan there were one add to foundation, and as request for pre-construction surve
Oct 6, 2022 · Penalty $625
Resolve